201113CNPABdPaper1Annex1LDP 2020 Optimized Part 2
Cairngorms National Park Proposed Local Development Plan
Grantown-on-Spey
Grantown-on-Spey lies in the north of the National Park. It was designed as a planned town and is the historic capital of Strathspey. The town itself has a wide range of businesses and facilities, many of which are located along the town’s High Street and main square.
Settlement objectives
- Protect the role of Grantown-on-Spey as a service centre for Strathspey
- Conserve and enhance Grantown-on-Spey’s distinctive built heritage and the integrity of its Conservation Area
- Support the delivery of housing that meets local needs
- Support opportunities to increase the attraction of Grantown-on-Spey as a tourist and recreation destination, particularly the Strathspey Railway extension
- Support proposals for business development, growth and diversification
- Maintain a range of community facilities
- Support proposals for safe active travel around Grantown-on-Spey and beyond to Dulnain Bridge and Carr-Bridge
Developer obligations
- Affordable housing: All housing developments should include 25% affordable housing.
- Planning obligations: Contributions will be sought from any housing developments towards:
- Increasing capacity at strategic community leisure facilities serving Grantown-on-Spey
- Other infrastructure considerations: Waste Water Treatment Works capacity
Proposals
HI: Beachen Court | Allocated for Housing | Indicative Residential Capacity: 53 units | 5.1ha
The site has an approved Development Brief and an existing planning permission for 53 dwellings. It is currently under construction. Any future/amended development proposals should be in general accordance with the principles in the Development Brief.
- Should the extant permission expire or be varied:
- A revised Flood Risk Assessment will be required.
- A revised Drainage Impact Assessment will be required and any new development must take account of and ensure integration with the existing SuDS scheme.
H2: Castle Road | Allocated for Housing | Indicative Residential Capacity: 50 units | 3.6ha
The site is allocated for up to 50 dwellings. A masterplan for the whole site will be required as part of any planning application.
- There are small watercourses on the boundary of the site and a Flood Risk Assessment or other supporting information will be required.
- Landscaping and structure planting will be required to ensure integration of the development with the surrounding landscape and ancient woodland to the north of the site.
- A Drainage Impact Assessment is required and should address existing surface water flooding issues. Enhancement of the small watercourses running through the site, which have been historically straightened, is encouraged.
EDI: Woodlands Industrial Estate | Allocated for Economic Development | 7.4ha
The site is an existing Industrial Estate. It is largely developed and in operation with some limited capacity for future economic development to the east of the proposed Strathspey Railway extension.
- Any future proposals should complement existing uses, safeguard the railway extension proposal and seek to enhance the area and its surroundings.
- Proposals for further development on the site would require a Drainage Impact Assessment, which should address existing surface water flooding issues. Enhancement of the small watercourses running through the site, which have been historically straightened, is encouraged. A water trunk main runs through this site.
T1: Caravan Park | Allocated for Tourism | 11.3ha
An existing established caravan and camping site continuing to support the provision of tourism accommodation and should be protected from adverse development.
- There is some capacity for further development, particularly in the north eastern part of the site. Any future development on the site must be for tourism uses and compatible with the existing operational business.
- Medium to High probability of flood risk adjacent to the site. Further development or any proposed increase in caravan numbers will require a Risk Assessment or other supporting information to identify the functional floodplain and developable area.
- Landscaping and structure planting will be required to ensure integration of the development with the surrounding landscape. Any future development will be required to protect ancient woodland on and adjacent to the site.
- Enhancement of the small watercourses running through the site, which have been historically straightened, is encouraged.
C1: Mossie Road | Allocated for Community Uses | 0.5ha
The site lies adjacent to an existing playpark and provides an opportunity for development within Grantown-on-Spey that can benefit the community.
- A Drainage Impact Assessment will be required.
C2: Strathspey Railway extension | Allocated for Community Uses | 1ha
The site is allocated for the future terminus for the proposed Strathspey Railway extension.
- Owing to the presence of small watercourses and an area of Medium to High probability of flood risk adjacent to the site, a Flood Risk Assessment is required to identify the functional floodplain and developable area.
- A Drainage Impact Assessment is required. Enhancement of the small watercourses running through the site, which have been historically straightened, is encouraged. A water main runs through this site.
- Landscaping and structure planting will be required to ensure integration of the development with the surrounding landscape and woodland to the west of the site.
C3: Land at Mossie Road | Allocated for Community Uses | 0.22ha
The site is allocated for allotments and has planning permission.
Kingussie
Kingussie is the historic capital of Badenoch and a traditional Highland town with a long central High Street. The town has a thriving community and is a focus for local services and facilities. Future development should complement the historic character of the town and enhance economic development and tourism.
Settlement objectives
- Support Kingussie’s role as a service centre for Badenoch
- Support proposals for business development, growth and diversification
- Improve tourist and recreation facilities
- Support the delivery of housing to meet local needs, particularly affordable housing
- Ensure Kingussie’s built heritage is preserved and enhanced
- Support the regeneration of Am Fasgadh
- Increase and enhance flood management and resilience
- Support opportunities that utilise the benefits of the A9 dualling for Kingussie
- Support Kingussie’s status as an exemplar walking and cycling friendly settlement
Developer obligations
- Affordable housing: All housing developments should include 25% affordable housing.
- Planning obligations: Contributions will be sought from any housing developments towards:
- An extension to Kingussie High School
- Increasing capacity at strategic community leisure facilities serving Kingussie
- Other infrastructure considerations: Waste Water Treatment Works capacity
Proposals
HI: Land between Ardbroilach Road and Craig an Darach | Allocated for Housing | Indicative Residential Capacity: 300 units | 19.6ha
The site has capacity for a phased development of 300 dwellings with opportunities for economic development and community uses.
- Any future proposals on the site will need to be supported by a masterplan. The site will provide for housing demand in Kingussie over the Plan period and beyond 2025.
- A Drainage Impact Assessment is required and should assess potential surface water flooding. A water main runs through this site.
- Landscaping and structure planting will be required to ensure integration of the development with the surrounding landscape and ancient woodland surrounding the site.
- Appropriate transport access will be required to service the site from the A86 Trunk Road. Development proposals should incorporate and enhance the area of protected open space along the southern boundary of the site, accessed via Dunbarry Terrace.
H2: Castle Road | Allocated for Housing | Indicative Residential Capacity: 50 units | 3.6ha
The site is allocated for up to 50 dwellings. A masterplan for the whole site will be required as part of any planning application.
- There are small watercourses on the boundary of the site and a Flood Risk Assessment or other supporting information will be required.
- Landscaping and structure planting will be required to ensure integration of the development with the surrounding landscape and ancient woodland to the north of the site.
- A Drainage Impact Assessment is required and should address existing surface water flooding issues. Enhancement of the small watercourses running through the site, which have been historically straightened, is encouraged.
EDI: Woodlands Industrial Estate | Allocated for Economic Development | 7.4ha
The site is an existing Industrial Estate. It is largely developed and in operation with some limited capacity for future economic development to the east of the proposed Strathspey Railway extension.
- Any future proposals should complement existing uses, safeguard the railway extension proposal and seek to enhance the area and its surroundings.
- Proposals for further development on the site would require a Drainage Impact Assessment, which should address existing surface water flooding issues. Enhancement of the small watercourses running through the site, which have been historically straightened, is encouraged. A water trunk main runs through this site.
EDI: Council Depot | Allocated for Economic Development | 0.9ha
The council depot provides much needed economic development in the community and should be protected from adverse development or any reduction in facilities which support the wider economy.
- Medium to High probability flood risk exists on part of the site. A Flood Risk Assessment will be required to accompany any further development proposals.
- A Drainage Impact Assessment is required and should assess surface water flooding.
ED2: McCormacks Garage | Allocated for Economic Development | 0.1ha
A small area of land that is currently occupied by a garage. Allocated to protect the site from adverse uses not compatible with economic development.
- Medium to High probability flood risk lies adjacent to the site. A Flood Risk Assessment or other supporting information will be required to accompany any further development proposals.
- Sewer mains cross this site.
T1: Kingussie Golf Club Caravan Park | Allocated for Tourism | 2.7ha
An existing established caravan and camping site which plays an important role in supporting the provision of tourism accommodation within Kingussie.
- The site should be protected from adverse uses which are not compatible with tourism development. There is some capacity for further development, particularly on the south western part of the site. Any future development must be for tourism uses and compatible with the existing operational business.
- Medium to High probability flood risk across parts of the site. A Flood Risk Assessment will be required to accompany any further development proposals to identify the functional floodplain and inform site layout.
- A Drainage Impact Assessment may be required to assess surface water flooding issues. Enhancement of the small watercourses running through the site, which have been historically straightened, is encouraged.
- Landscaping and structure planting will be required to ensure integration of the development with the surrounding landscape and ancient woodland on the site.
Newtonmore
Newtonmore is a traditional highland village located in south Badenoch. The village contains a number of local services and is also home to the Highland Folk Museum which attracts many visitors to the village.
Settlement objectives
- Support and enhance local services
- Support opportunities to increase the attraction of Newtonmore for tourism and recreation
- Support proposals for business growth, diversification and development
- Support the delivery of housing to meet local needs
- Increase and enhance flood management and resilience
- Support opportunities that utilise the benefits of the A9 dualling for Newtonmore
Developer obligations
- Affordable housing: All housing developments should include 25% affordable housing.
- Planning obligations: Contributions will be sought from any housing developments towards:
- An extension to Kingussie High School
- Increasing capacity at strategic community leisure facilities serving Newtonmore
- Other infrastructure considerations: Waste Water Treatment Works capacity
Proposals
H1: Land between Ardbroilach Road and Craig an Darach | Allocated for Housing | Indicative Residential Capacity: 300 units | 19.6ha
The site has capacity for a phased development of 300 dwellings with opportunities for economic development and community uses.
- Any future proposals on the site will need to be supported by a masterplan. The site will provide for housing demand in Kingussie over the Plan period and beyond 2025.
- A Drainage Impact Assessment is required and should assess potential surface water flooding. A water main runs through this site.
- Landscaping and structure planting will be required to ensure integration of the development with the surrounding landscape and ancient woodland surrounding the site.
- Appropriate transport access will be required to service the site from the A86 Trunk Road. Development proposals should incorporate and enhance the area of protected open space along the southern boundary of the site, accessed via Dunbarry Terrace.
EDI: Rear of Café | Allocated for Economic Development | 1.3ha
Land to the rear of the café provides some opportunity for low-impact economic development to support the sustainability of the community.
- Medium to High probability flood risk adjacent to the site. A Flood Risk Assessment or other supporting information will be required to identify the functional floodplain and developable area.
- A Drainage Impact Assessment would be required to accompany development proposals.
- Landscaping and structure planting will be required to ensure integration of the development with the surrounding landscape.
ED2: Industrial Park | Allocated for Economic Development | 4ha
The existing industrial estate/business park will be protected and developments which consolidate the economic provision of this site will be supported providing they demonstrate that a safe and convenient access can be achieved.
- Medium to High probability flood risk exists over a large part of the site. A Flood Risk Assessment or other supporting information will be required to identify the functional floodplain and developable area for any further development proposals.
- A Drainage Impact Assessment would be required to address any further development proposals.
H1: Land between Perth Road and Station Road | Allocated for Housing | Indicative Residential Capacity: 120 units | 11.9ha
The site is allocated for a total of 120 dwellings. There is currently an existing planning consent on part of the site for 81 dwellings.
- As a visually prominent site, the design of any detailed proposals must take account of the sensitive setting of the village, and should be designed in a way which promotes the highest standards of access, layout, building design and public realm.
- Medium to High probability flood risk exists in the southern part of the site. A Flood Risk Assessment will be required to identify the developable area for any further development proposals.
- A Drainage Impact Assessment may be required to address surface water flooding. Sewer mains run through this site.
- Landscaping and structure planting will be required to ensure integration of the development with the surrounding landscape.
T1: Highland Folk Museum | Allocated for Tourism | 20.3ha
The Highland Folk Museum plays an important role in supporting the economy by increasing the attraction of Newtonmore for tourism and recreation.
- The site will therefore be protected from adverse development. Future development proposals should enhance the tourism offering and be compatible with the exisitng operational business.
- Medium to High probability flood risk lies within and adjacent to the site. A Flood Risk Assessment may be required to accompany any further development proposals.
- A Drainage Impact Assessment may be required to address any further development proposals and should address existing surface water flooding issues. Enhancement of the small watercourses running through the site, which have been historically straightened, is encouraged.
C1: Ardvonie Car Park | Allocated for Community Uses | 0.2ha
Community car park identified in recognition of the role it serves in supporting the needs of the community. The site will be protected from alternative forms of development.
C2: Car Park | Allocated for Community Uses | 0.2ha
Community car park identified in recognition of the role it serves in supporting the needs of the community. The site will be protected from alternative forms of development.
C3: Land west of Spey Street (Am Fasgadh) | Allocated for Community Uses | 1.9ha
The site lies to the west of Spey Street and adjacent to the railway line. It is identified to support the reuse and redevelopment of the site for community uses.
- Medium to High probability flood risk exists across the site. A Flood Risk Assessment will be required to identify the developable area.
- A Drainage Impact Assessment is required and should assess surface water flooding. Various water and sewer mains cross this site.
C4: Car Park | Allocated for Community Uses | 0.2ha
Community car park identified in recognition of the role it serves in supporting the needs of the community. The site will be protected from alternative forms of development.
Blair Atholl
Blair Atholl is a small village located in the south of the Cairngorms National Park. It is an attractive and historic village, home to Blair Castle and gardens, making it popular for visitors. The local economy is focused on tourism and land-based employment.
Settlement objectives
- Support Blair Atholl’s role as a key gateway centre for recreation and tourism in this part of the National Park
- Conserve and enhance Blair Atholl’s distinctive built heritage, the integrity of its Conservation Area and the setting of the village
- Support upgrades to the Village Hall
- Support proposals for safe active travel around the village and to surrounding settlements
- Deliver affordable housing
- Increase and enhance flood management and resilience
- Support appropriate inward investment opportunities arising from the A9 and Highland Main Line improvements
- Support opportunities that utilise the benefits of the A9 dualling for Blair Atholl
Developer obligations
- Affordable housing: All housing developments should include 45% affordable housing.
Proposals
HI: Old Bridge of Tilt | Allocated for Housing | Indicative Residential Capacity: 20 units | 1ha
The site is allocated for up to 20 dwellings to contribute to meeting Blair Atholl’s housing need.
- The development should seek to complement the existing character of Old Bridge of Tilt and ensure there is safe vehicular and pedestrian access between the site and the village.
- A Drainage Impact Assessment will be required and should assess potential surface water flooding.
- There is no waste water network within the vicinity of the site and the installation of a connection will be the responsibility of the developer.
- Depending on the size of the proposed development, further investigations such as a Water Impact Assessment and Flow and Pressure tests will be required. A water main runs through this site.
- Landscaping and structure planting will be required to ensure integration of the development with the surrounding landscape.
- Road improvements, specifically localised road widening around the entrance to the site, will be required.
H2: Main Road | Allocated for Housing | Indicative Residential Capacity: 10 units | 0.4ha
The site is allocated for up to 10 dwellings. Development on the site should seek to reflect the pattern of housing evident along the main road in Blair Atholl and postively contribute to the character of the village.
- Due to the presence of a small watercourse, a Flood Risk Assessment will be required to identify the developable area.
- A Drainage Impact Assessment is required and should assess potential surface water flooding. Depending on the size of the proposed development, further investigations such as Water Impact Assessment and Flow and Pressure tests will also be required.
- Landscaping and structure planting will be required to ensure integration of the development with the surrounding landscape.
H3: Land North of Old Orchard | Allocated for Housing | Indicative Residential Capacity: 8 units | 0.38ha
The site is allocated for 8 dwellings and has planning permission.
ED1: Blair Atholl Sawmill Yard | Allocated for Economic Development | 3.5ha
The site is an existing Industrial Estate. It is largely developed and in operation with some capacity for future economic development.
- It should be protected from adverse uses not compatible with economic development.
- Medium to High probability flood risk exists on the site. Any proposals for further development on the site will require a Flood Risk Assessment.
- A Drainage Impact Assessment will be required and should assess existing surface water flooding issues.
T1: Blair Castle Caravan Park | Allocated for Tourism | 19.8ha
An existing established caravan and camping site continuing to support the provision of tourism accommodation and should be protected from adverse development.
- Any future development on the site must be for tourism uses and compatible with the existing operational business. Any development proposals should also have particular regard to the sensitive location of this site within the grounds of Blair Castle including the protection of the areas of ancient or native woodland.
- Medium to High probability flood risk exists adjacent to the site. Any proposals for further development or any increase in caravan numbers will require a Flood Risk Assessment to identify the functional floodplain and developable area.
- A Drainage Impact Assessment will be required and should assess existing surface water flooding issues. Depending on the size of the proposed development, further investigations such as Water Impact Assessment or Flow and Pressure tests will be required.
T2: Caravan Park | Allocated for Tourism | 0.5ha
An existing established caravan and camping site continuing to support the provision of tourism accommodation and should be protected from adverse development.
- Any future development on the site must be for tourism uses and compatible with the existing operational business.
- Any proposals for further development or any increase in caravan numbers will require a Flood Risk Assessment to identify the functional floodplain and developable area.
- A Drainage Impact Assessment will be required to address surface water flooding. Depending on the size of proposed development, further investigations such as Water Impact Assessment or Flow and Pressure tests will be required.
T3: Visitor Gateway | Allocated for Tourism | 1.8ha
The site has planning permission for a gateway centre including a new rangers’/interpretation building, new retail units, car park, visitor square and site entrance.
- Much of this has been completed but there is some limited capacity for further development on the site.
- Should the existing permission be varied, a Flood Risk Assessment will be required due to adjacent Medium to High probability flood risk. Consideration will need to be given to any culverts/bridges which may exacerbate flood risk.
- A Drainage Impact Assessment may be required to address surface water flooding. Depending on the size of proposed development, further investigations such as Water Impact Assessment or Flow and Pressure tests will be required.
Boat of Garten
Boat of Garten is a thriving community and the village has a number of services that support the local community and visitors. The Strathspey Railway also stops in Boat of Garten and is a key visitor attraction in the village. No new housing allocations have been identified in the village as a result of environmental constraints. However, small-scale housing proposals, particularly for affordable housing, may still be supported under the Plan’s general Housing policy.
Settlement objectives
- Support the delivery of housing to meet local needs, particularly affordable housing and opportunities for community-owned housing
- Support proposals for small-scale business development
- Support proposals for safe active travel around the village and beyond to Grantown-on-Spey
- Maintain high-quality community facilities
Developer obligations
- Affordable housing: All housing developments should include 25% affordable housing.
- Planning obligations: Contributions will be sought from any housing developments towards:
- Increasing capacity at strategic community leisure facilities serving Boat of Garten
Proposals
EDI: The Steam Railway Station | Allocated for Economic Development | 2.7ha
Land at the station provides an opportunity for further economic development in support of the village.
- Any new development should ensure the enhancement of this important tourism facility.
- A Drainage Impact Assessment will be required for this site.
T1: Boat Of Garten Caravan & Camping Park | Allocated for Tourism | 2.2ha
The existing caravan and camping site supports the provision of tourism accommodation within Boat of Garten and will be protected from adverse development.
- Where appropriate, enhancement opportunities which are compatible with the existing use will be supported.
- A water main runs along the boundary of this site.
Kingussie
Kingussie is the historic capital of Badenoch and a traditional Highland town with a long central High Street. The town has a thriving community and is a focus for local services and facilities. Future development should complement the historic character of the town and enhance economic development and tourism.
Settlement objectives
- Support Kingussie’s role as a service centre for Badenoch
- Support proposals for business development, growth and diversification
- Improve tourist and recreation facilities
- Support the delivery of housing to meet local needs, particularly affordable housing
- Ensure Kingussie’s built heritage is preserved and enhanced
- Support the regeneration of Am Fasgadh
- Increase and enhance flood management and resilience
- Support opportunities that utilise the benefits of the A9 dualling for Kingussie
- Support Kingussie’s status as an exemplar walking and cycling friendly settlement
Developer obligations
- Affordable housing: All housing developments should include 25% affordable housing.
- Planning obligations: Contributions will be sought from any housing developments towards:
- An extension to Kingussie High School
- Increasing capacity at strategic community leisure facilities serving Kingussie
- Other infrastructure considerations: Waste Water Treatment Works capacity
Proposals
HI: Land between Ardbroilach Road and Craig an Darach | Allocated for Housing | Indicative Residential Capacity: 300 units | 19.6ha
The site has capacity for a phased development of 300 dwellings with opportunities for economic development and community uses.
- Any future proposals on the site will need to be supported by a masterplan. The site will provide for housing demand in Kingussie over the Plan period and beyond 2025.
- A Drainage Impact Assessment is required and should assess potential surface water flooding. A water main runs through this site.
- Landscaping and structure planting will be required to ensure integration of the development with the surrounding landscape and ancient woodland surrounding the site.
- Appropriate transport access will be required to service the site from the A86 Trunk Road. Development proposals should incorporate and enhance the area of protected open space along the southern boundary of the site, accessed via Dunbarry Terrace.
H2: Castle Road | Allocated for Housing | Indicative Residential Capacity: 50 units | 3.6ha
The site is allocated for up to 50 dwellings. A masterplan for the whole site will be required as part of any planning application.
- There are small watercourses on the boundary of the site and a Flood Risk Assessment or other supporting information will be required.
- Landscaping and structure planting will be required to ensure integration of the development with the surrounding landscape and ancient woodland to the north of the site.
- A Drainage Impact Assessment is required and should address existing surface water flooding issues. Enhancement of the small watercourses running through the site, which have been historically straightened, is encouraged.
EDI: Woodlands Industrial Estate | Allocated for Economic Development | 7.4ha
The site is an existing Industrial Estate. It is largely developed and in operation with some limited capacity for future economic development to the east of the proposed Strathspey Railway extension.
- Any future proposals should complement existing uses, safeguard the railway extension proposal and seek to enhance the area and its surroundings.
- Proposals for further development on the site would require a Drainage Impact Assessment, which should address existing surface water flooding issues. Enhancement of the small watercourses running through the site, which have been historically straightened, is encouraged. A water trunk main runs through this site.
EDI: Council Depot | Allocated for Economic Development | 0.9ha
The council depot provides much needed economic development in the community and should be protected from adverse development or any reduction in facilities which support the wider economy.
- Medium to High probability flood risk exists on part of the site. A Flood Risk Assessment will be required to accompany any further development proposals.
- A Drainage Impact Assessment is required and should assess surface water flooding.
ED2: McCormacks Garage | Allocated for Economic Development | 0.1ha
A small area of land that is currently occupied by a garage. Allocated to protect the site from adverse uses not compatible with economic development.
- Medium to High probability flood risk lies adjacent to the site. A Flood Risk Assessment or other supporting information will be required to accompany any further development proposals.
- Sewer mains cross this site.
T1: Kingussie Golf Club Caravan Park | Allocated for Tourism | 2.7ha
An existing established caravan and camping site which plays an important role in supporting the provision of tourism accommodation within Kingussie.
- The site should be protected from adverse uses which are not compatible with tourism development. There is some capacity for further development, particularly on the south western part of the site. Any future development must be for tourism uses and compatible with the existing operational business.
- Medium to High probability flood risk across parts of the site. A Flood Risk Assessment will be required to accompany any further development proposals to identify the functional floodplain and inform site layout.
- A Drainage Impact Assessment may be required to assess surface water flooding issues. Enhancement of the small watercourses running through the site, which have been historically straightened, is encouraged.
- Landscaping and structure planting will be required to ensure integration of the development with the surrounding landscape and ancient woodland on the site.
Newtonmore
Newtonmore is a traditional highland village located in south Badenoch. The village contains a number of local services and is also home to the Highland Folk Museum which attracts many visitors to the village.
Settlement objectives
- Support and enhance local services
- Support opportunities to increase the attraction of Newtonmore for tourism and recreation
- Support proposals for business growth, diversification and development
- Support the delivery of housing to meet local needs
- Increase and enhance flood management and resilience
- Support opportunities that utilise the benefits of the A9 dualling for Newtonmore
Developer obligations
- Affordable housing: All housing developments should include 25% affordable housing.
- Planning obligations: Contributions will be sought from any housing developments towards:
- An extension to Kingussie High School
- Increasing capacity at strategic community leisure facilities serving Newtonmore
- Other infrastructure considerations: Waste Water Treatment Works capacity
Proposals
H1: Land between Ardbroilach Road and Craig an Darach | Allocated for Housing | Indicative Residential Capacity: 300 units | 19.6ha
The site has capacity for a phased development of 300 dwellings with opportunities for economic development and community uses.
- Any future proposals on the site will need to be supported by a masterplan. The site will provide for housing demand in Kingussie over the Plan period and beyond 2025.
- A Drainage Impact Assessment is required and should assess potential surface water flooding. A water main runs through this site.
- Landscaping and structure planting will be required to ensure integration of the development with the surrounding landscape and ancient woodland surrounding the site.
- Appropriate transport access will be required to service the site from the A86 Trunk Road. Development proposals should incorporate and enhance the area of protected open space along the southern boundary of the site, accessed via Dunbarry Terrace.
EDI: Rear of Café | Allocated for Economic Development | 1.3ha
Land to the rear of the café provides some opportunity for low-impact economic development to support the sustainability of the community.
- Medium to High probability flood risk adjacent to the site. A Flood Risk Assessment or other supporting information will be required to identify the functional floodplain and developable area.
- A Drainage Impact Assessment would be required to accompany development proposals.
- Landscaping and structure planting will be required to ensure integration of the development with the surrounding landscape.
ED2: Industrial Park | Allocated for Economic Development | 4ha
The existing industrial estate/business park will be protected and developments which consolidate the economic provision of this site will be supported providing they demonstrate that a safe and convenient access can be achieved.
- Medium to High probability flood risk exists over a large part of the site. A Flood Risk Assessment or other supporting information will be required to identify the functional floodplain and developable area for any further development proposals.
- A Drainage Impact Assessment would be required to address any further development proposals.
H1: Land between Perth Road and Station Road | Allocated for Housing | Indicative Residential Capacity: 120 units | 11.9ha
The site is allocated for a total of 120 dwellings. There is currently an existing planning consent on part of the site for 81 dwellings.
- As a visually prominent site, the design of any detailed proposals must take account of the sensitive setting of the village, and should be designed in a way which promotes the highest standards of access, layout, building design and public realm.
- Medium to High probability flood risk exists in the southern part of the site. A Flood Risk Assessment will be required to identify the developable area for any further development proposals.
- A Drainage Impact Assessment may be required to address surface water flooding. Sewer mains run through this site.
- Landscaping and structure planting will be required to ensure integration of the development with the surrounding landscape.
T1: Highland Folk Museum | Allocated for Tourism | 20.3ha
The Highland Folk Museum plays an important role in supporting the economy by increasing the attraction of Newtonmore for tourism and recreation.
- The site will therefore be protected from adverse development. Future development proposals should enhance the tourism offering and be compatible with the exisitng operational business.
- Medium to High probability flood risk lies within and adjacent to the site. A Flood Risk Assessment may be required to accompany any further development proposals.
- A Drainage Impact Assessment may be required to address any further development proposals and should address existing surface water flooding issues. Enhancement of the small watercourses running through the site, which have been historically straightened, is encouraged.
C1: Ardvonie Car Park | Allocated for Community Uses | 0.2ha
Community car park identified in recognition of the role it serves in supporting the needs of the community. The site will be protected from alternative forms of development.
C2: Car Park | Allocated for Community Uses | 0.2ha
Community car park identified in recognition of the role it serves in supporting the needs of the community. The site will be protected from alternative forms of development.
C3: Land west of Spey Street (Am Fasgadh) | Allocated for Community Uses | 1.9ha
The site lies to the west of Spey Street and adjacent to the railway line. It is identified to support the reuse and redevelopment of the site for community uses.
- Medium to High probability flood risk exists across the site. A Flood Risk Assessment will be required to identify the developable area.
- A Drainage Impact Assessment is required and should assess surface water flooding. Various water and sewer mains cross this site.
C4: Car Park | Allocated for Community Uses | 0.2ha
Community car park identified in recognition of the role it serves in supporting the needs of the community. The site will be protected from alternative forms of development.
Carr Bridge
Carr-Bridge is a village in the north of the National Park located close to the A9 with good rail links. The village is home to one of the National Park’s biggest attractions – Landmark Forest Adventure Park – which attracts many visitors to the area. The village also contains a range of other facilities including hotels, shops and a garage.
Settlement objectives
- Support and maintain local services in Carr-Bridge
- Support the delivery of housing that meets local needs, particularly affordable and mid-market housing
- Support proposals for business, tourism and recreation in the village
- Support proposals for the redevelopment of the Struan House Hotel for uses that benefit the community
- Support proposals for small business units
- Support proposals for safe active travel around the village and beyond to Aviemore
- Support opportunities that utilise the benefits of the A9 dualling for Carr-Bridge
Developer obligations
- Affordable housing: All housing developments should include 25% affordable housing.
- Planning obligations: Contributions will be sought from any housing developments towards:
- Increasing capacity at Carr-Bridge Primary School
- Increasing capacity at strategic community leisure facilities serving Carr-Bridge
- Other infrastructure considerations: Waste Water Treatment Works capacity
Proposals
HI: Carr Road | Allocated for Housing | Indicative Residential Capacity: 47 units | 1.99ha
This site has capacity for 47 dwellings during the Plan period.
- The detail of any development proposals must take account of the woodland setting and should be designed in a way which promotes the highest standards of access, layout, building design and public realm.
- A SuDS scheme must be provided for the site and should be integrated as part of the structural landscape framework for the development, designed to promote habitat enhancement. A Drainage Impact Assessment may be required to address surface water issues.
- Carr Road is narrow and lacks space for a pedestrian sidewalk. Ensuring the inclusion of appropriate mitigation measures, such as traffic calming and the provision of a new footpath link to the primary school, to address the increased level of traffic will be a key requirement of any proposed development.
- Development proposals should seek to protect and integrate with existing path networks. The development must include a comprehensive series of open spaces, all linked by the footpath and cycle network particularly to the woodland outwith its boundary and measures will be taken to ensure the protection of the adjacent woodland.
- Open space should be provided to allow for peripheral planting to screen and frame views into and out of the site as well as a comprehensive tree structure across the whole area, including street and garden trees.
H2: Crannich Park | Allocated for Housing | Indicative Residential Capacity: 23 units | 1.2ha
This site has existing planning permission for 23 dwellings and will contribute towards meeting Carr-Bridge’s housing needs.
- Should the existing permission be amended the following will be required:
- A revised Flood Risk Assessment may be required. No development should take place below 256.5m AOD.
- A National Vegetation Classification survey may be required to accompany any alternative development proposals.
EDI: Land at Railway Station | Allocated for Economic Development | 0.8ha
Land associated with the Railway Station and siding presents an opportunity for investment.
- Development should help promote Carr-Bridge as a tourist destination and help link the railway with the rest of the village.