Item5AA20220305DETNethyBridgeHousingCommitteeReport
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Item 5 11/08/2023
CAIRNGORMS NATIONAL PARK AUTHORITY
DEVELOPMENT PROPOSED:
Erection of 21no dwellings at Nethy Bridge Station Yard Station Road Nethy Bridge
REFERENCE: 2022/0305/DET APPLICANT: AW Laing DATE CALLED-IN: 3 October 2022 RECOMMENDATION: Refuse CASE OFFICER: Emma Bryce – Planning Manager
1
CNPA Planning Committee Application Site 0 35 70 140 Meters N Nethy Hotel Birchfield Track River Nethy 00 B Issues Dismantled Railway CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Item 5 11/08/2023 Park 214.1m The Elmpark 026.8 Coul na Kyle The Cottage Ardach Mach Bain Moidants Balachan Culag Mount View Hotel Mousa Tigh Tamarisk House 208.5m Tanera Mor emiddrie Crown copyright and database rights 2023. Ordnance Survey Licence number 100040965 Station Nethy Station Rap nes’s Nethy Bridge 210.7m BRAES Stables Nethy Bridge Hotel 13 Echids River Cottage 211.5m Drochit Balnagowan Cottage Tigh na Bruach Sub Sta Balnagowan Balnagown Milk
2
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Item 5 11/08/2023
SITE DESCRIPTION, PROPOSAL AND HISTORY
Site Description
- The application site lies on the western edge of Nethy Bridge and covers an area of approximately 0.8 hectares. The brownfield site was a former railway station and yard and is bounded by agricultural land to the north and west, residential properties to the east and Station Road to the south, with the River Nethy (which is part of the River Spey SAC) flowing beyond, parallel to the road. The Speyside Way runs along the eastern boundary of the site.
Proposal
- The drawings and documents associated with this application are listed below and are available on the Cairngorms National Park Authority website unless noted otherwise: http://www.eplanningcnpa.co.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=RIXB8QSI0C100
Title | Drawing Number | Date on Plan* | Date Received |
---|---|---|---|
PLANS | |||
Plan — Location Plan | 002 | 01/09/22 | 03/10/22 |
Plan — Site Layout | 124871⁄1001 | 10/05/22 | 26/05/23 |
Plan | |||
Plan — Site Layout — 21 Units | Rt14_D_90_104 | 01/06/22 | 10/02/23 |
Plan — Proposed Site Cross Sections | 124871⁄8001 | 06/09/22 | 26/05/23 |
Plan — Detached Elevations/Plans | 1690 BT1_00_100 | 01/08/22 | 03/02/23 |
Plan — Semi Detached Elevations/Plans | 1690 BT2_00_100 | 01/08/22 | 03/02/23 |
Plan — Detached Garage Details | 1690 BT1_00_100 | 16/01/23 | |
Plan — Proposed Roads Layout 1⁄2 | 124871-PC-1002 | 09/05/22 | 26/05/23 |
Plan — Proposed Roads Layout 2/2 | 124871-PC-1003 | 05/09/22 | 26/05/23 |
Plan — Access Layout | 124871-PC-1004 | 09/05/22 | 06/03/23 |
Plan — Roads Longitudinal Sections 1⁄2 | 124871⁄1005 | 10/05/22 | 03/10/22 |
3
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Item 5 11/08/2023
| Plan — Typical Road Construction Details | 124871-PC-1015 | 09/05/22 | 06/03/23 | | Plan — Proposed Drainage Layout 1⁄2 | 124871⁄2001 | 11/05/22 | 06/03/23 | | Plan — Proposed Drainage Layout 2/2 | 124871⁄2002 | 11/05/22 | 06/03/23 | | Plan — Typical Drainage Construction Details 1⁄2 | 124871-PC-2015 | 09/05/22 | 06/03/23 | | Plan — Typical Drainage Construction Details 2/2 | 124871-PC-2016 | 09/05/22 | 06/03/23 | | Plan — Speyside Way Diversion Strategy | 1690 Rt14_D_90_10 | 01/01/23 | 02/02/23 | | Plan — Roads Longitudinal Sections 2/2 | 124871⁄1006 | 10/05/22 | 06/03/23 | | SUPPORTING DOCUMENTATION | | | | | Other — Drainage Impact Assessment | | 01/09/22 | 03/10/22 | | Other — Flood Risk Assessment | | 01/03/21 | 18/10/22 | | Other — Protected Species Scoping Survey | | 31/01/21 | 16/01/23 | | Other — Content, Design And Location Fingerposts | | | 02/02/23 | | Other — Intermediate Waymarking | | | 02/02/23 |
*Where no specific day of month has been provided on the plan, the system defaults to the 1st of the month.
The application seeks permission for a residential development of 21 affordable homes with associated infrastructure. The proposal is for 3, three bedroom detached properties, 9, three bedroom semi-detached properties and 9, two bedroom semi-detached properties. The dwellings will be two storeys, finished in white rendered blockwork and timber effect cladding. Windows will be aluminium clad timber and roof areas will be clad in slate. Rainwater goods will all be uPVC.
The site will be accessed via Station Road. The layout proposes a spine road with houses to either side with two small turning heads, one to the northwest and one at the northeast end where the site terminates. A SuDS pond / basin will be located to the south east of the site adjacent to the entrance. The Speyside Way will be realigned to accommodate the development and will follow the proposed footway from the north of the site through to the Station
4
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Item 5 11/08/2023
Road junction. In terms of drainage, roof run-off will be via down pipes into a surface water sewer and surface water drainage for plots will be captured by a series of road gullies and drained into the surface water sewer which will discharge into the detention basin. A flow control device will monitor the discharge rate into the river. Plots 14 – 16, which lie at the north end of the site, off the proposed unadopted road, will be drained into a private soakaway. All remaining areas, such as footways and gardens, will be free draining or comprise permeable surfaces.
Plans of the proposals are included in Appendix 1.
The following information has been submitted in support of the application:
a) Drainage Impact Assessment; b) Flood Risk Assessment; c) Protected Species Scoping Survey; d) Speyside Way Diversion Strategy, Intermediate Waymarking and Fingerpost Details.
History
14/01529/S42 – Application for Section 42 to vary time on application 07/00231/FULLBS for a further year – planning permission granted 19/05/2014.
07/00231/FULBS – Erection of bunkhouse – planning permission granted 17/04/2009.
04/318/CP and 10/380/CP – Erection of Visitor Centre (including craft workshops, retail, and cafeteria), 6 no. dwellinghouses and garages and associated access road and parking areas – planning permissions granted 17/11/2005 and 14/01/2011. The second permission was started in 2011 and remains a live consent.
HABITATS REGULATIONS APPRAISAL
A Habitats Regulations Appraisal [HRA] has been undertaken to consider the effects of the proposals upon the conservation objectives of the Natura Sites as listed within the document attached at Appendix 2.
The HRA identifies that there is the potential for impacts to the River Spey SAC, Abernethy Forest SPA and Craigmore Wood SPA due to potential pollution, disturbance during the construction stage and long term disturbance as a result of the potential increase in recreation in areas utilised by capercaillie. However, it is concluded that any adverse impacts to the site
5
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Item 5 11/08/2023
integrity of the River Spey SAC can be avoided by the provision of an approved Pollution Prevention Plan. There will be no adverse effects to the site integrity of Abernethy Forest SPA and Craigmore Wood SPA given the high level of recreational use and the unlikely impact the occupants of the development will have (see Annex 1).
DEVELOPMENT PLAN CONTEXT
Policies
National Policy | National Planning Framework 4 (NPF4) Scotland 2045 | |
---|---|---|
POLICY 1 | Tackling the climate and nature crises | |
POLICY 2 | Climate mitigation and adaptation | |
POLICY 3 | Biodiversity | |
POLICY 4 | Natural places | |
POLICY 9 | Brownfield, vacant and derelict land, and empty buildings | |
POLICY 14 | Design, quality and place | |
POLICY 15 | Local living and 20 minute neighbourhoods | |
POLICY 16 | Quality homes | |
POLICY 17 | Rural homes | |
POLICY 20 | Blue and green infrastructure | |
POLICY 22 | Flood risk and water management | |
POLICY 29 | Rural development | |
Strategic Policy | Cairngorms National Park Partnership Plan 2022 – 2027 | |
Local Plan Policy | Cairngorms National Park Local Development Plan (2021) | |
Those policies relevant to the assessment of this application marked with a cross | ||
POLICY 1 | NEW HOUSING DEVELOPMENT | X |
POLICY 2 | SUPPORTING ECONOMIC GROWTH | |
POLICY 3 | DESIGN AND PLACEMAKING | X |
POLICY 4 | NATURAL HERITAGE | X |
POLICY 5 | LANDSCAPE | X |
POLICY 6 | THE SITING AND DEISGN OF DIGITAL COMMUNICATIONS EQUIPMENT | |
POLICY 7 | RENEWABLE ENERGY | |
POLICY 8 | OPEN SPACE, SPORT AND RECREATION | |
POLICY 9 | CULTURAL HERITAGE | |
POLICY 10 | RESOURCES | X |
POLICY 11 | DEVELOPER OBLIGATIONS | X |
- All new development proposals require to be assessed in relation to policies contained in the adopted Development Plan which comprises National Planning Framework 4 (NPF4) and the Cairngorms National Park Local Development Plan 2021. The full wording of policies can be found at:
6
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Item 5 11/08/2023
https://www.gov.scot/publications/national-planning-framework‑4/documents/
and at:
Planning Guidance
- Supplementary guidance also forms part of the Local Development Plan and provides more details about how to comply with the policies. Guidance that is relevant to this application is marked with a cross.
Policy 1 | Housing Supplementary Guidance | X |
---|---|---|
Policy 2 | Supporting Economic Growth Non-Statutory Guidance | |
Policy 3 | Design and Placemaking Non-Statutory Guidance | X |
Policy 4 | Natural Heritage Non-Statutory Guidance | X |
Policy 5 | Landscape Non-Statutory Guidance | X |
Policy 7 | Renewable Energy Non-Statutory Guidance | |
Policy 8 | Open Space, Sport and Recreation Non-Statutory Guidance | |
Policy 9 | Cultural Heritage Non-Statutory Guidance | |
Policy 10 | Resources Non-Statutory Guidance | X |
Policy 11 | Developer Obligations Supplementary Guidance | X |
CONSULTATIONS
Summary of the Main Issues Raised by Consultees
Scottish Water has no objection to the proposed development but suggest the applicant completes a Pre-Development Enquiry (PDE) form ensuring the development can be serviced. There is currently sufficient capacity in the Aviemore Water Treatment Works to service the proposed development. There is also sufficient capacity in the Nethy Bridge Wastewater Treatment Works to service the development, however the applicant must complete the Pre-Development Enquiry (PDE) form ensuring the development can be serviced.
Scottish Water records indicate that there is live infrastructure (a rising foul sewer within the site boundary) that may impact on existing Scottish Water assets. The applicant should be aware that any conflict with assets identified
7
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Item 5 11/08/2023
will be subject to restrictions on proximity of construction. Written permission must be obtained before any works are started within the area of any assets.
SEPA object to the planning application and recommend refusal. The site lies within the functional floodplain based on the SEPA Flood Maps and is therefore at medium to high risk of flooding from the River Nethy. Following the adoption of NPF4, avoidance of flood risk areas in the 200 year, plus a climate change scenario, is now a requirement and must be assessed in line with the most up to date guidance. In this instance a 34% climate change uplift is required to be included in any design flow calculated for the site. Given this is an ungauged catchment, a range of different methods is used to carry out flood risk calculations and in line with NPF4, a precautionary approach should be taken regarding the calculated probability of flooding as a best estimate, not a precise forecast. The submitted Flood Risk Assessment has used different methods resulting in quite different flow estimates and predicted flood extents. The lowest flow estimate only reaches the boundary of the site, while other estimates show the site completely flooded. The significant difference in the resulting flood extents demonstrates the modelling is very sensitive to changes in flow extents and therefore it is not appropriate to accept the lowest flow. The flood risk assessment work undertaken to support the application unfortunately does not provide enough information to demonstrate that the site could be developed in line with NPF4 requirements. The evidence of historic extreme flooding of the site in addition to the hydrological uncertainty outlined above, also justifies a cautious approach in accordance with NPF4. It is considered that no further modelling would provide any additional information that would alter this opinion and as such SEPA object in principle to the development.
NatureScot agree with the conclusions of the Habitats Regulations Appraisal that any effects to the site integrity of the River Spey SAC can be avoided provided that a pollution prevention plan is agreed prior to any development commencing. There are unlikely to be any adverse effects to the site integrity of the Abernethy Forest SPA and Craigmore Wood SPA due to those factors considered in the HRA.
The Highland Council Transport Planning Team originally objected to the proposals, however following discussions with the applicant and the submission of revisions the team have withdrawn their objections however, this is subject to no objections from the Highland Council’s Flood Risk Management Team, SEPA or Scottish Water to the proposed surface water drainage and SuDS arrangements and the inclusion of conditions requiring either a temporary or permanent 20mph speed limit to be implemented on the C1139 approaches to the site; the necessary statutory processes to change the speed limit to 20mph includes the new street and should be in place before the completion of the development and; design details for the provision of a pedestrian link alongside the C1139 from the village to the site. The team
8
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Item 5 11/08/2023
also recommend an informative clarifying that roads and footways will need to be designed to adoptable standards and a Road Construction Consent (RCC) application be made to the Council prior to the construction of these. Changes to levels across the site and design details can also be addressed through the RCC process.
The Highland Council Flood Risk Management Team object to the proposed development on the grounds of flood risk. There has been significant work undertaken by the applicants and SEPA to explore the disparity between the submitted Flood Risk Assessment and SEPA’s strategic flood maps. SEPA maintains its objection (see above) and therefore, given SEPA’s level of expertise as a flood risk authority and its detailed flood risk analysis of the site, the Team supports this decision and maintains its objection to the proposals.
The Highland Council Corporate Address Gazetteer Team provided no response.
The Highland Council Archaeologist has no concerns regarding the proposed development and as such requires no mitigation.
The Highland Council Contaminated Land Officer states that the site has an historic use as a railway yard and tracks which may have led to contamination. Submitted survey work, reports and strategies have concluded that following some surface soil removal, there is no risk to human health or the wider environment. However, there has recently been a number of changes to the guidance that is applicable to the re-development of contaminated land. It is therefore recommended and a condition requiring a review of these reports is undertaken to demonstrate that sufficient work has been completed with regards to current guidance and that there will be no contamination risks remaining on site. Should additional work be required this should be in the form of a Supplementary Investigation Strategy approved by the Council’s Contaminated Land Team.
The Highland Council Environmental Health Officer provided no response.
The Highland Council Waste Management Team provided no response.
CNPA Landscape Adviser is satisfied that conditions requiring full details of landscaping proposals, tree planting and future management will provide sufficient clarity for the site.
CNPA Ecology Adviser has no objections subject to conditions requiring pre-construction surveys for breeding birds and otter with associated Species Protection Plans, a Pollution Prevention Plan and biodiversity enhancements.
9
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Item 5 11/08/2023
CNPA Outdoor Access Officer initially expressed concern regarding the impact on the Speyside Way. The applicant has submitted additional information which addresses some of the concerns including an appropriate diversion of the Speyside Way during construction and the addition of directional signage and interpretation boards.
Nethy Bridge Community Council welcome much needed affordable housing, however, they are concerned that the dwellings are two storeys rather than one and a half storeys. There is some anecdotal disappointment from potential neighbours regarding overlooking. See Appendix 3.
REPRESENTATIONS
- The application was advertised when it was submitted. Two letters of objection and a letter of support have been received. Copies of these representations can be found in Appendix 4. The grounds of objection are summarised as follows:
a) Some of the proposed houses will overlook and result in a loss of privacy to adjacent properties; b) The development will result in the loss of mature (25 year old) trees; c) Loss of access to the Speyside Way; d) Intensification of use on the site will result in road safety issues.
APPRAISAL
- The main planning considerations are considered to be: the principle of the development; layout, amenity and design; landscape issues; environmental issues; access and servicing; flooding and surface water drainage; infrastructure and developer contributions.
Principle
NPF4 Policy 9: Brownfield, vacant and derelict land, and empty buildings, encourages the sustainable reuse of brownfield land while Policy 16: Quality homes and Policy 17: Rural homes, both support development proposals that provide high quality, affordable homes in locations where there is an identified local need.
Policy 1: New Housing Development of the Cairngorms National Park Local Development Plan 2021 supports new housing within identified settlement boundaries. The site is an unallocated, brownfield site within the settlement boundary of Nethy Bridge and has an extant permission for craft workshops, café and six large dwelling houses. Policy 1, paragraph 1.4 seeks a mix of
10
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Item 5 11/08/2023
dwelling types and sizes to help secure a balanced housing stock with an emphasis on smaller dwellings. The proposal will provide modest 2 and 3 bedroom homes commensurate to the needs of the type of household that will occupy them. This in turn will assist in addressing the on-going issue of the lack of the right type of housing which meets local community needs.
Policy 1, paragraph 1.5 seeks the provision of affordable housing within housing developments of at least 25%. The proposed development has modestly sized two and three bedroomed properties as semi-detached units as well as some three bedroomed detached properties, with floor areas of 85, 102 and 123 square metres respectively. The properties have been designed to meet standard affordable housing specifications required by affordable housing providers, but at this stage, there is no agreed contract for properties to be taken on by an affordable housing provider. A condition would ensure that a minimum of 25% of the units are affordable in order to comply with policy, but it is possible that more properties would be taken by providers.
The principle of the proposed development is considered to be acceptable, subject to compliance with other relevant NPF4 and Local Development Plan policies.
Layout, Amenity and Design
NPF4 Policy 14: Design, quality and place supports development where it is consistent with the six qualities of successful places; healthy, pleasant, connected, distinctive, sustainable and adaptable. Policy 1: New Housing Development and Policy 3: Design and Placemaking of the Cairngorms National Park Local Development Plan 2021 seek to reinforce and enhance the character of the existing settlement and encourage new development to be sympathetic to the traditional pattern and character of the area, whilst encouraging innovative design and finishes. The proposed layout takes reference from the constraints of the existing landform with properties addressing a central spine road, terminating at the northeast end of the site in the form of a small turning head serving two of the detached, slightly larger properties. This is the point where the site will adjoin the Speyside Way. The proposed SuDS basin will be located to the south of the site adjacent to the access and will introduce a landscaped feature at the public interface of the site. The proposals are considered to comply with Policies 1 and 3 in this respect.
In terms of residential amenity Policy 3: Design and Placemaking of the Cairngorms National Park Local Development Plan 2021 seeks to ensure that new developments are designed to protect the amenity currently enjoyed by neighbours and that they provide sufficient private amenity ground and off-street parking. Each of the proposed dwellings will be set within reasonably
11
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Item 5 11/08/2023
sized plots with a sufficient distance between them and existing properties to ensure there will be no issues of overlooking and loss of privacy and an adequate level of amenity will be afforded to future occupants. Each dwelling will have its own private garden and car parking provision.
To ensure existing residential amenity of adjacent properties is protected during construction, it is recommended that a condition requiring appropriate noise and mitigation measures are in place to minimise any potential disturbance. It is considered that the proposal is in accordance with Policy 3 in this respect.
Finally, regarding design, Policy 3: Design and Placemaking of the Cairngorms National Park Local Development Plan 2021 requires that all new development delivers high standards of placemaking and sustainable design that contributes to making a sense of place and promotes good health and well being. It should minimise the effect of climate change and make sustainable use of resources. In terms of density, the number of dwellings proposed across the site is considered to be appropriate given the size of the site and its development capacity. The proposed dwellings will be a mix of detached and semi-detached, two storey houses which will be contemporary in design but incorporating traditional proportions and features with materials referencing traditional finishes. Accordingly, the proposed development complies with Policy 3 in terms of design.
Landscape Issues
Policy 5: Landscape of the Cairngorms National Park Local Development Plan 2021 presumes against development which does not conserve and enhance the landscape character and special qualities of the National Park and in particular, the setting of the proposed development. This is reinforced by Policy 3: Design and Placemaking which seeks to ensure that all new development is sympathetic to the traditional pattern and character of the surrounding areas, local vernacular and local distinctiveness.
The site is a brownfield site, formerly a railway station and yard with some rough grassland and scrub regeneration that is not of significant landscape value. As such the site provides a ‘blank canvas’ in terms of landscaping. No formal landscaping scheme has been developed for the site and therefore a condition is recommended requiring a comprehensive landscaping plan incorporating appropriate tree and shrub planting around the peripheries of the site and streetscape. This will assist in reducing the visual impact of the development on adjacent existing properties and will also contribute to enhancing the local landscape character. Suitable landscaping will also be required around the SuDS pond to maximise the visual connection to the
12
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Item 5 11/08/2023
surrounding area and adjacent river banks. This will also enhance the landscape setting and support biodiversity.
- Subject to suitably worded conditions to ensure the submission and approval of an appropriate landscape plan along with the proper establishment and long term management of this landscaping scheme, the proposed development is considered to comply with Policy 3: Design and Placemaking and Policy 5: Landscape of the Cairngorms National Park Local Development 2021.
Environmental Issues
Policy 1: Tackling the climate and nature crises of NPF4 requires that significant weight is given to the global climate and nature crisis when consideration is given to new development. Policy 3: Biodiversity seeks to ensure that development will conserve, restore and enhance biodiversity. Policy 4: Natural Places seeks to protect, restore and enhance natural assets including protected areas.
Policy 4: Natural Heritage of the Cairngorms National Park Development Plan 2021 seeks to restrict development that would have an adverse impact on protected species and where this cannot be avoided that appropriate mitigation measures are provided.
The site lies adjacent to the River Nethy, which forms part of the River Spey SAC, and Abernethy Forest SPA and Craigmore Wood SPA. A Habitats Regulations Appraisal has been undertaken by CNPA to assess any impacts on the qualifying interests. NatureScot has been consulted and agree with the conclusion reached and the recommendations made. These require suspensive conditions to be attached to any consent granted to ensure appropriate mitigation is undertaken and there will be no adverse effect on the site’s integrity. These include surveys for protected species and the submission of a Species Protection Plan. No information has been submitted detailing how works will be carried out to minimise the risk of pollution from sediment or other potential pollutants and therefore a condition is recommended requiring the submission and approval of a Pollution Prevention Plan.
The site currently has a relatively low biodiverstity value, but appropriate landscaping and tree planting as well as design and management of the SuDS pond will deliver some biodiversity enhancement and can be increased through other simple measures covered by condition.
13
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Item 5 11/08/2023
- Subject to the imposition of these recommended conditions, the proposed development will comply with the terms of Policies 1, 3 and 4 of NPF4 and Policy 4 Natural Heritage of the Cairngorms Local Development Plan 2021.
Access and Servicing
Policy 13: Sustainable Transport of NPF4 supports developments that provide direct, easy, segregated and safe links to local facilities via walking, wheeling and cycling networks before occupation. Policy 15: Local Living and 20 minute neighbourhoods supports development which contributes to local living and the Place Principle and where, among other things, there is the opportunity for sustainable modes of transport including high quality walking, wheeling and cycling networks. Policy 3: Design and Placemaking of the Cairngorms National Park Local Development Plan 2021 seeks to promote sustainable transport methods and active travel and maximise opportunities for responsible outdoor access.
The development provides a road layout with extended footways and is within acceptable walking and cycling distance from local amenities and public transport links. The Highland Council Transport Planning team require a dedicated pedestrian footway along the north side of Station Road (the C1139) which links the site with the village to improve connectivity and provide a safer route for pedestrians and vulnerable road users. It is recommended a condition requiring the detailed design of such a pedestrian link be submitted and approved should consent be granted. The Council intends to implement a 20mph speed limit throughout the village. Should planning permission be granted an appropriately worded condition will be required to ensure the applicants take responsibility for the village wide 20mph speed limit to incorporate the new street. The new road and footways associated with the development will be adopted by the Council and as such Road Construction Consent (RCC) will be required. This is a separate process, however the Council recommend an informative advising the applicant of this and that no works can commence until the RCC is formally approved.
The Speyside Way currently runs directly through the site. During the construction phase of the development, it will be diverted to the west of the site and temporarily fenced off. Temporary signage will also be erected to ensure users are fully aware of the diversion. Once the development is complete, the route will again run through the site. Notice boards at both ends of the site will be erected and a waymarking fingerpost will be located at the entrance to the development with two directional blades clearly indicating the revised final route.
Policy 3: Design and Placemaking of the Cairngorms National Park Local Development Plan 2021 also states that all new development must include an appropriate means of access, egress and space for off street parking.
14
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Item 5 11/08/2023
The proposed new access arrangements are acceptable given that the introduction of the village wide 20mph speed limit reduces the minimum visibility requirements for the site access (25 metres in each direction from a 2.4 metre set back). The implementation of this speed limit however has not yet been confirmed. As such, to ensure the new access arrangements and associated visibility splays are appropriate, a condition is recommended requiring a 20mph speed limit (either a permanent or temporary depending on whether the village wide 20mph speed limit is forthcoming) is in place prior to the commencement of any works on the site. Proposed parking provision for each plot is considered sufficient and accords with the Council’s guidelines.
Subject to the recommended conditions it is considered that the proposals comply with Policy 13: Sustainable Transport and Policy 15: Local Living and 20 minute neighbourhoods of NPF4 and Policy 3: Design and Placemaking of the Cairngorms National Park Local Development Plan 2021.
Contaminated Land
Policy 10: Resources of the Cairngorms National Park Local Development Plan 2021 states that development affecting contaminated land will be considered favourably where assessments are undertaken to identify actual and potential impacts, on site and off site, of all stages of development proposals on the risks to human health and to the Park’s biodiversity, geodiversity, hydrology and other special qualities.
The proposed development was previously used as a railway station and yard and as such there may still be ground contamination issues on the site. Given this, a suitably worded suspensive condition is recommended that a scheme to identify and address potential contamination issues should be submitted. Therefore, subject to a suspensive condition, the proposal is considered to comply with Policy 10: Resources of the Cairngorms National Park Local Development Plan 2021.
Flooding and Surface Water Drainage
- NPF4 Policy 2: Climate mitigation and adaptation requires that development is sited and designed to adapt to current and future risks from climate change. Policy 22: Flood Risk and Water Management promotes avoidance as a first principle and reducing the vulnerability of existing and future development to flooding. Development at risk of flooding or in a flood risk area will only be supported if the proposal is for the redevelopment of previously used sites and where long term safety and resilience can be secured in accordance with relevant SEPA advice.
15
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Item 5 11/08/2023
Policy 10: Resources of the Cairngorms National Park Local Development Plan 2021 requires that all development should be free from medium to high risk flooding, not increase the risk of flooding elsewhere, not add to the area of land requiring flood prevention measures and not affect the ability of the functional flood plain to store or move flood waters. Developments should incorporate SUDs as proportionate to the scale and nature of the development. The policy also requires that all development should avoid unacceptable detrimental impacts on the water environment.
The surface water drainage proposals accompanying the proposal are considered to be acceptable in principle subject to their relationship with the functional flood plain.
SEPA, object to the proposal on the grounds that the proposed development would place people or property at risk of flooding contrary to both NPF4 Policy 22 and the LDP Policy 10. Highland Council’s Flood team have objected to the application because of SEPA’s objection. The applicant’s flood engineers (Envirocentre) are of the opinion that the site would be free from flooding in extreme events and allowing for climate change. This opinion has been verified by a second independent engineer, but SEPA maintain their objection on the basis that a precautionary approach should be taken. The following paragraphs of this are intended to summarise the different approaches as this matter is critical to the determination of the application.
The potential for the river Nethy and/or river Spey to flood and to affect Nethy Bridge is accepted by all parties. SEPA’s flood maps for Nethy Bridge show potential extensive flooding based on their national modelling of indicative flooding. Nethy Bridge is identified as a Potentially Vulnerable Area (PVA) in the Findhorn, Nairn and Speyside flood risk management plan as a result of that national modelling. The flood risk management plan also explains that further detailed flood risk modelling is required for Nethy Bridge and that there are few recent records of flooding in Nethy Bridge. The only significant recorded flooding of note in Nethy Bridge appears to be the flooding of 1829, which pre-dates the formation of the railway later in the 1800’s.
There is no disagreement about the flood of 1829, but some disagreement about the reasons for Nethy Bridge flooding so badly. One of the differences in the catchment noted by local people is that in 1829 the Nethy catchment had a number of sawmills upstream of Nethy Bridge that flooded and washed timber downstream where it blocked the main bridge. They point out that those sawmills no longer provide