230630ResourceCtteePaper5H&SCMinutes
Cairngorms National Park Authority Ughdarras Pàirc Nàiseanta a’ Mhonaidh Ruaidh Resources Committee Paper 5
30 June 2023
Page 1 of 4
CAIRNGORMS NATIONAL PARK AUTHORITY HEALTH & SAFETY MEETING
19 January 2023
Minutes
In Attendance:
Kate Christie Pip Mackie Mark Pocock Colin Simpson Beccy Stanton Lisa Maclsaac Emma Stewart Alan Smith
Review of Minutes and previous actions:
- Minutes reviewed as per action log. And outstanding actions carried forward. CS updated us that SMT had decided not to put CNPA managed sites on the strategic risk register as felt this was adequately covered elsewhere.
Electronic sign in system
- Beccy presented the new system to the H&SC, confirming that it had been approved by SMT and was being communicated to staff via SCF the following week. Questions/discussion covered:- a. Will fire marshalls get specific training on how the app and system works
and their roles in this regard. **Yes – which will be combined with an on-site session re enhanced fire marhsall matters.**
b. What about when reception isn’t manned? There is no guarantee that
reception will have a receptionist based there at all times. Staff in the extension will still have to look out for visitors and ask them to use the system to sign in.
c. Suggestion that a fire drill should be carried out soon after the system is
implemented for lessons learnt and suggested tweaks to the system. BS and MP confirmed that they were setting aside a week to get all fire policies and risk assessments up to date, and incorporating
the new sign in system. Once this was done, a fire drill will be arranged. d. Discussion about whether or not each person’s profile should include their vehicle reg so that their presence could be identified by a quick visual of the carpark. Agreed this did not add any value — some staff may uae a different vehicle, or may be parked outwith the CNPA parking spaces to couldn’t be identified anyway. e. Discussion about whether or not we should set an automated time out so that if anyone forgot to sign out, the system would wipe that at say midnight so records would be “clean” the next day. There was some concern about “wiping” them without establishing where they were, but it was suggested that there is a reminder notification sent to folk who have not signed out. BS explained that when the cleaners leave the building they so a sweep to make sure there is no one still in the building. Some discussion if there should be a system in place whereby line managers chase up staff who have not signed out to ensure they are safe. Is this proportionate – will be onerous for line managers. KC to get SMT views. Agreed there would be a prompt for people who have not signed out and that the prompts should go both to their work and personal mobile. BS to investigate if this is possible. f. There was discussion about number and location of muster points. It was greed best to only have one muster point for all staff/visitors, that being the lawn opposite the Parklands office. BS & MP to ensure staff comms includes change of muster point location g. There was a discussion about who long we should retain sign-in/out data. On Lisa’s advice, it was agreed that we did not need to retain for more than 3 months
Facilities Matters
- Facilities Team raised the following:- a. Staff need to be remined about updating their PPE register **ES/CS to
raise with their staff**
b. Safeshores – trackers for Peatland Team are now all working. Issue is that
devices log in/out, SOS works and call centre can locate devices, but we can't check and see where team members are at any point with the Garmin device, but it's a safer device as works even were satellite signal is poor. Ranger managers keen to be able to check team member location. **MP to review the devices for the Ranger team re mapshare.**
c. Front door is still being left unlocked/open. **MP and BS to investigate
a mechanism to resolve – need a power source though, or we could give all staff a key to the extension. KC to explore with SMT**
d. Issue with terrace door being left unlocked. **Staff to be reminded to
lock doors - BS/MP to action**
e. The winter office tool box talk has now been circulated to all staff.
Covers when/who will do path clearance during a snow event.
f. Some discussion about whether or not admin team need to do food
handling training. They don't prepare food – just collect it from supplier,
put in fridge, remove cling film when ready to be eaten and let staff know when extra food is left. Suggest left over food should be binned at end of day. KC to discuss with admin team. Pip to see if there is any low level training available to cover food handling, rather than food preparation
Visitor Services matters
- AS advised we are getting a few e‑vans for the ranger team. Use/safety will be monitored
Peatland matters.
- Team aren’t going to be out and about until snow clears – possibly March time.
- Matt is going to do a training session with the team on the safehores devices so all are clear about how to use them
- Trainee Peatland officer joining in March – will need a device
AOB
- Fire Marshall training: — feedback is that the course is not very good. PM has seen what other NPAs are doing and none are doing any enhanced training for fire marshalls. Currently we have an ELMS course available which all staff can do, and suggestion is that this course plus the on-site fire-marshall specific tour will be sufficient. Agreed
Risk Assessments
- H&SC members to advise Mark P when they’ve updated a RA for final check by Mark
Action log
Actions from this meeting – 19/01/23
Action | Responsible person and Status |
---|---|
Various actions with regards new electronic sign-in system (para 2) | BS, MP, KC |
Staff to update PPE register | ES and CS |
Investigate mapshare on lone working devices | MP |
Resolve issues of front door being left unlocked | MP. BS.KC |
Remind staff to lock terrace doors | MP. BS |
Explore options for food handling training | PM |
Actions outstanding from previous meetings
Meeting Date | Action | Responsible person |
---|---|---|
14/09/22 | Line managers to be remined about personal risk assessments noting tick risk, and identifying appropriate PPE | KC |
Personal Risk Assessment should identify need for hard hats | KC | |
H&SC should have sight of team specific risk assessments | CS and ES | |
19/07/22 | 4 x 4 training for new Peatland staff to include person who has missed it to date | In hand. Waiting on new PO’s to join and training will include them as well |
Safeshores devices to new staff and training for all users | On going | |
Infrastructure inspection and maintenance plan to be implemented | On going | |
Additional loch mechanism for main door extension to be investigated | On going | |
16/12/21 | All to advise MP once RAs have been updated, so MP can ensure consistency of templates | Ongoing |
19/03/19 | Ballater Panic alarm — the alarm is to be moved to the CNPA office when the office is reconfigured. A peep hole will be put in the internal door of the office, as currently staff are not able to see who is at the door if the knock | MP (on hold pending work to commence reconfiguration of office). MP to get a quote anyway to hold on record. |