Item7Appendix1(c)Plans20190012MSC
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Agenda Item 7 Appendix IC 26/04/2019
AGENDA ITEM 7
APPENDIX IC
2019/0012/MSC (FARMHOUSE)
PLANS
X 2m path Plot 63 ot 75 Plot 74 ot 73 Plok 2 pati Plot 64 Plot 45 Plot 65 Plot 44 Plot 43 Plot 66 Plot 42 Plot 71 Plot 67 Plot 41 Plot 68 7251 ght of Access Maintained Heather Cottage Plot 69 Plot 70 Pawprints X 0 5 10 Plot 01 Plot 02 Pumping Station A Plot 37 Plot 36 Plot 35 Plot 34 6744 Plot 33 Plot 38 Plot 46 Plot 40 Club House 209.15 AOD MINIMUM FLOOR LEVEL 208.55 AOD FUNCTIONAL FLOOD PLAIN 50 100m
Bracewell Stirling CONSULTING 38 WALKER TERRACE, TILLICOULTRY, FK13 6EF TEL: 01259 750301
5 NESS BANK, INVERNESS, IV2 4SF TEL: 01463 233760
FARMHOUSE RESTORATION DALFABER FARM, AVIEMORE NORTH TITLE LOCATION PLAN SCALE DATE 18.12.2018 BY SS 1:1250 PURPOSE PLANNING PAPER A4 DWG NO.-REV 3920/K2/01 – 19-LOC
A 20 10 212.40 3B 97 Handed 24 29000 212.40 Plot 41 6250 212.60 212.40 6250 212.20 212.40 212.20 6250 212.20 212.40 Plot Development Plan Scale: (1:200 @ A3) 212.20 3B 100 3B 97 Handed 1200 5900 212.20 212.20 2400 12000 Plot 39 12000 212.20 Plot 38 3500 212.30 Plot 40 EXISTING FARMHOUSE FFL AS EXISTING eather ottage 7251 Location Plan Scale: (1:2500 @ A3) Club 1000 210.10 LEGEND Site Boundary Plot boundary Defined with marker posts Potential Developable Area Minimum dimension Building footprint Plot access formed with porous paviors Finished floor level @round/road level 0.9m wide paved footpath and platt pressed pc conc 1.8 x 2.4m wide paved patio area pressed pc conc Private refuse storage area 1.8 x 1.8 paved hard standing 1.5 timber palisade fencs surround Rotary drier location Post and wire and rylock fence as detail. Hedge/shrub adjacent to post and wire and rylock fence as approved detail. Surveyed Trees — Retained Un-surveyed Trees — Retained Trees cut back to suit Building Footprint, but presumption to retain. Trees to be Removed 2.0m wide swale Proposed woodland structure planting Proposed amenity shrub planting NOTE; For detailed specification of tree planting refer to approved drawings: 216/P14, P15 & P16 Proposed deciduous tree planting Proposed coniferous tree planting Proposed deciduous tree planting within plots Proposed coniferous tree planting within plots A 23.01.18 CO-ORDINATED WITH LANDSCAPE STRATEGY PLAN REV DATE DESCRIPTION SS DRN
Bracewell Stirling CONSULTING 38 WALKER TERRACE, TILLICOULTRY, FK13 6EF TEL: 01259 750301
5 NESS BANK, INVERNESS, IV2 4SF TEL: 01463 233760
HOUSING DEVELOPMENT DALFABER FARM, AVIEMORE N TITLE RESIDENTIAL PLOT DEVELOPMENT FARMHOUSE PLOT BLOCK AND LOCATION PLAN SCALE A3@1:200 1:200 0 2m 4m 6m 12m DWG NO.-REV DATE 18.12.2018 PURPOSE PLANNING BY SS PAPER A3 3920/K2/01 – 19FH
FRONT ELEVATION (Scale 1:100@A3) GABLE ELEVATION (Scale 1:100@A3) 1:100 0 1m 2m 3m 6m REAR ELEVATION (Scale 1:100@A3) Description of Proposed Works INITIAL SURVEY Bat Survey: Prior to any works or secondary surveys commencing within the curtilage of the existing farmhouse, a full bat roost survey is to be carried out and a report prepared outlining the findings, identifying any necessary mitigation, should there be evidence of existing roosts. Thereafter an application for a licence is to be submitted to Scottish Natural Heritage. Structural Survey: Engineer to prepare a design for the safe propping of the exiting structure prior to commencing works.. Walls to be subject to a full structural engineer’s survey and made structurally sound throughout. DOWNTAKING Roof: All metalwork to be carefully removed. Slate roof covering to be removed and checked for soundness and set aside for re-use or replacement as necessary. Rainwater goods carefully removed and surveyed for size and profile. Fixing sockets to be raked back and cleaned. All roof timbers to main roof and dormer cheeks to be surveyed for size and profile prior to removal. Abutment to skews and chimneys to be raked back and cleaned. Timberwork: All timberwork, windows and doors to be removed and any fixing sockets in stonework to be raked back and cleaned. Stonework: All stone lintels to be checked for structural integrity and mechanically strengthened by non-visible means where required. All chimneys, pots, caps and skews to be checked for soundness, cleaned or replaced and re-bedded. Exiting harling to be carefully removed from walls to expose stonework. Stonework beds and joints to be raked back and cleaned and re-pointed with lime mortar. Exposed stone to front elevation to have all joints raked back, cleaned and re-pointed with lime mortar pointing, for fair faced finish. Ground Floor: Floor/solum to be excavated to a minimum depth of 300mm and all non-inert matter removed. Exposed surface to be sprayed with a fungicide. Formation of new openings: Structural engineer to design all supporting prop work prior to slapping out. Selected stonework from downtaking to be set aside for reuse. RENOVATION Walls: All walls to have danp proof course inserted. New openings Jambs to be formed from selected downtakings and bedded in lime mortar. Tooled face stone lintels, mullions and cills to be used where these are to be exposed. Walls to be externally finished with through coloured harl with the exception of the front elevation, which is to be fair faced stone as existing. Ground Floor: Floor slab formed with 150mm concrete on damp proof membrane on blinding. Roof: GABLE ELEVATION (Scale 1:100@A3) Roof timbers to be placed to match existing profile and sarked and felted to take selected/replacement slate. Junctions of all abutments dormer cheeks and valleys to be made good in code 5 lead and ridge to be formed in zinc on timber roll. Chimneys: Chimneys to be relined with stainless steel flexible liners. Rainwater good: Rainwater goods to be replaced with cast metal to match existing profile and finished in black. Windows and doors: Windows to be replaced with timber framed double glazed units to a similar profile and finished in white. Doors to be replaced with composite timber finished glazed units. Internal works: Internal wall linings, partitions and intermediate floor to be formed in timber frame, insulated to comply with current Building Standards. Energy: Heating to be designed to incorporate low to zero carbon technology. REV DATE DESCRIPTION DRN
Bracewell Stirling CONSULTING 38 WALKER TERRACE, TILLICOULTRY, FK13 6EF TEL: 01259 750301
5 NESS BANK, INVERNESS, IV2 4SF TEL: 01463 233760
HOUSING DEVELOPMENT DALFABER FARM, AVIEMORE TITLE ELEVATIONS PROPOSED PLOT 40 SCALE AS SHOWN DWG NO.-REV DATE 28/11/2017 PURPOSE PLANNING BY AB PAPER A3 3920/K2/02 – 24
LOUNGE HALL VESTIBULE WC UYILITY GROUND FLOOR PLAN (Scale 1:100@A3) NIA: 132 sq.m Total: 164 sq.m KITCHEN 88 DINING DRESSING ENSUITE D ENSUITE BEDROOM 2 ST BEDROOM 3 BATHROOM 00 00 00 ROOF PLAN (Scale 1:200@A3) FAMILY Π MASTER BEDROOM LANDING BEDROOM 4 1:200 0 2m 4m 6m 12m FIRST FLOOR PLAN (Scale 1:100@A3) ΝΙΑ: 132 sq.m Total: 164 sq.m 1:100 0 1m 2m 3m 6m Description of Proposed Works INITIAL SURVEY Bat Licence No activities may be undertaken within the vicinity of the farmhouse which may disturb bats, without a licence having been secured from SNH. Prior to any works or secondary surveys commencing within the curtilage of the existing farmhouse, a full bat roost survey is to be carried out and a report prepared outlining the findings, identifying any necessary mitigation, should there be evidence of existing roosts. Thereafter an application for a licence is to be submitted to Scottish Natural Heritage. Structural Survey: Engineer to prepare a design for the safe propping of the exiting structure prior to commencing works.. Walls to be subject to a full structural engineer’s survey and made structurally sound throughout. DOWNTAKING Roof: All metalwork to be carefully removed. Slate roof covering to be removed and checked for soundness and set aside for re-use or replacement as necessary. Rainwater goods carefully removed and surveyed for size and profile. Fixing sockets to be raked back and cleaned. All roof timbers to main roof and dormer cheeks to be surveyed for size and profile prior to removal. Abutment to skews and chimneys to be raked back and cleaned. Timberwork: All timberwork, windows and doors to be removed and any fixing sockets in stonework to be raked back and cleaned. Stonework: All stone lintels to be checked for structural integrity and mechanically strengthened by non-visible means where required. All chimneys, pots, caps and skews to be checked for soundness, cleaned or replaced and re-bedded. Exiting harling to be carefully removed from walls to expose stonework. Stonework beds and joints to be raked back and cleaned and re-pointed with lime mortar. Exposed stone to front elevation to have all joints raked back, cleaned and re-pointed with lime mortar pointing, for fair faced finish. Ground Floor: Floor/solum to be excavated to a minimum depth of 300mm and all non-inert matter removed. Exposed surface to be sprayed with a fungicide. Formation of new openings: Structural engineer to design all supporting prop work prior to slapping out. Selected stonework from downtaking to be set aside for reuse. RENOVATION Walls: All walls to have danp proof course inserted. New openings Jambs to be formed from selected downtakings and bedded in lime mortar.Tooled face stone lintels, mullions and cills to be used where these are to be exposed. Walls to be externally finished with through coloured harl with the exception of the front elevation, which is to be fair faced stone as existing. Ground Floor: Floor slab formed with 150mm concrete on damp proof membrane on blinding. Roof: Roof timbers to be placed to match existing profile and sarked and felted to take selected/replacement slate. Junctions of all abutments dormer cheeks and valleys to be made good in code 5 lead and ridge to be formed in zinc on timber roll. Chimneys: Chimneys to be relined with stainless steel flexible liners. Rainwater good: Rainwater goods to be replaced with cast metal to match existing profile and finished in black. Windows and doors: Windows to be replaced with timber framed double glazed units to a similar profile and finished in white. Doors to be replaced with composite timber finished glazed units. Internal works: Internal wall linings, partitions and intermediate floor to be formed in timber frame, insulated to comply with current Building Standards. Energy: Heating to be designed to incorporate low to zero carbon technology. REV DATE DESCRIPTION DRN
Bracewell Stirling CONSULTING 38 WALKER TERRACE, TILLICOULTRY, FK13 6EF TEL: 01259 750301
5 NESS BANK, INVERNESS, IV2 4SF TEL: 01463 233760
HOUSING DEVELOPMENT DALFABER FARM, AVIEMORE TITLE PLANS PROPOSED PLOT 40 SCALE AS SHOWN DATE 28/11/2017 PURPOSE PLANNING BY AB PAPER A3 3920/K2/02 – 25 DWG NO.-REV