Skip to content
Please be aware the content below has been generated by an AI model from a source PDF.

Item7Appendix1Plans20200105DET

CAIRNGORMS NATION­AL PARK AUTHOR­ITY Plan­ning Com­mit­tee Agenda Item 7 Appendix | 12/06/2020

AGENDA ITEM 7

APPENDIX I

2020/0105/DET

PLANS

age Wks Path Moun­tain Base Sta­tion Path 0m 10m 20m 30m FB Ord­nance Sur­vey Crown Copy­right 2020. All Rights Reserved. Licence num­ber 100022432 Applic­a­tion site: Coire Cas Car Park, Cairngorm Moun­tain, Glen­more, Aviemore Applic­ant: Cairngorm Moun­tain (Scot­land) Lim­ited Pro­pos­al: Install­a­tion of addi­tion­al tube slides and exten­sion to exist­ing tube slide Day Lod Promapv2LAND­MARK INFORM­A­TION Crown Copy­right 2020. All Rights Reserved. Ord­nance Sur­vey Cr num­ber Plot­ted Scale 1:1250. Paper Size — A4 Ryden

Cairngorm Moun­tain Waste Water Treat­ment Plant Lower Cas Car park Cas Car park 0 Funicu­lar Base Sta­tion Daylodge A North KEY Exten­sion and realign­ment of exist­ing slide Pro­posed addi­tion­al new slides Scale 1:1000 0 m 25 m 50 m 75 m 100 m

V PLAN 1:400 TUBBY STRAIGHT — 30.00m D NOT IN SCALE TYP­IC­AL SEC­TIONS (dimen­sions in mil­lim­iters) STRAIGHT TYP­IC­AL SEC­TION 300020001500 1500 0% Ground pre­par­a­tion edges PARA­BOL­IC TYP­IC­AL SEC­TION 0% ‑60004000- ‑2000- Ground pre­par­a­tion edges PARA­BOL­IC TYP­IC­AL SEC­TION2006000- ‑4000 +631,00 NOT IN SCALE TUBBY UP-HILL WOODEN­PATH-NP70-STRIPS 1400 30 1200×1100 50 06++ 30 20 90- ‑350375 9000 1400 0960 0% 1400 Ø1300 Ground pre­par­a­tion edges 170 +++061400 50 9035006++++ 06 +90 1000 1000 1000 1000 2000- 2000 0 00129+ Notes: The indic­ated pro­file con­cerns only the tubby slopes. The indic­ated pro­file must be exten­ded and pre­pared for the all zones called ” ground pre­par­a­tion edges” (blue area). In this draw it is indic­ated how the ground must be pre­pared, it is indic­ated also how must be done the wooden foot­bridge, that links the tubby slides with the con­vey­or belt. This draw, is a pre­lim­in­ary draw to advise the cus­tom­er and his engin­eers how to make the exec­ut­ive plans. The draw and all the inform­a­tion refer to the Tubby slide, so for the sur­round­ing items (example walls, walk­ways, drain­ing, etc.) feel free to make as the cus­tom­er engin­eer advise. SOIL INDIC­A­TION The top lay­er of soil for the Tubby slides and the uphill slope must be done like one of the fol­low­ing options: A) Cm. 10 of clay soil, if using the Neve­plast net or NSF20 under­lay­er. B) Sta­bil­ized gravel, if using a NSF20 under­lay­er. (in Europe it is used the same under lay­er mater­i­al that is used for the roads under­neath the asphalt.) For all pre­par­a­tion area, it is import­ant that the top soil is homo­gen­eous, smooth, com­pact and rolled without rough­ness. For a bet­ter man­age­ment of the track (by the super­visors), we advise to sur­vey the tun­nel with cam­er­as and place the video at the start­ing area. PRE­LIM­IN­ARY arti­fi­cial snow fun neve­plast SCOT­LAND — CAIRNGORM — TUBBY EVO DRAW­ING N°: 20200206 PRE­LIM­IN­ARY LAY­OUT — TAB_01 PRE­LIM­IN­ARY DRAW­ING BY NEVEPLAST

EXIST­ING TUBBY SLIDE EXIST­ING GROUND PRO­FILE TUBBY SLIDE PRO­FILE LVL REF. +618.00 EXIST­ING LEVELSEXIST­ING PAR­TIAL DIS­TANCES CUR­RENT INCLIN­A­TIONS % EXIST­ING LEVELSEXIST­ING PAR­TIAL DIS­TANCES CUR­RENT INCLIN­A­TIONS % 6.00 +626.00 18.31 5% LON­GIT­UD­IN­AL PRO­FILES 1:300 EXIST­ING GROUND PRO­FILE TUBBY SLIDE PRO­FILE LVL REF. +315,00 EXIST­ING LEVELSEXIST­ING PAR­TIAL DIS­TANCES CUR­RENT INCLIN­A­TIONS % EXIST­ING LEVELSEXIST­ING PAR­TIAL DIS­TANCES CUR­RENT INCLIN­A­TIONS % 0.30 2.00 +631,50 +631,50 +631,10 +629.30 2.00 2.00 6.00 0% 20% 30% 4.00 25% +631,50 50 50 10 +629,30 2.00 2.00 6.00 4.00 0% 20% 30% 25% +628,30 +628,30 STRAIGHT MIN­ITUBBY — 30m TUBBY CURVES — 69m EXIST­ING SLIDE 26.00 19% 29.00 20% 1.40 30.00 1.40 32.80 PATH START ARRIVAL STRAIGHT TUBBY STRAIGHT — 52m PATH START 10.36 +625.00 2.44 30 30 380 +628. +628 +627. 11.81 8% 2.00 2.00 8.00 0% 25% 42% +624.50 3.11 +624.00 0.43 +623.00 +622.00 3.93 4.12 5.38 25% 24% 19% 80 8.00 28% +622 4.00 28% +621. +621.00 0.41 STRAIGHT 28.00 0% 27.03 0% +635.75 +621.00 PARA­BOL­IC 1 & 2 +623,10 +622.00 26.00 19% 26.00 19% NOT IN SCALE NEVESPLAST UNDER­LAY­ER GRASS GROUND PRE­PAR­A­TION TYP­IC­AL SEC­TION MIXED CLAY SOIL OR MIXED AGRI­CUL­TUR­AL LAND MUST BE AT LEAST 2.50m IN HIGHT BETWEEN THE EXIST­ING TUBBY SLIDE AND THE TOP OF THE WOODEN STRUC­TURE 3.23 2.64 3.44 3.12 THIS IS ONLYPRE­LIM­IN­ARY LAY­OUT ALL THE STRUC­TURES MUST BE DESIGNED BY CLIENT’S TECH­NI­CIANS ACCORD­ING TO OUR INDIC­A­TIONS Notes: The indic­ated pro­file con­cerns only the tubby slopes. The indic­ated pro­file must be exten­ded and pre­pared for the all zones called ground pre­par­a­tion edges” (blue area). In this draw it is indic­ated how the ground must be pre­pared, it is indic­ated also how must be done the wooden foot­bridge, that links the tubby slides with the con­vey­or belt. This draw, is a pre­lim­in­ary draw to advise the cus­tom­er and his engin­eers how to make the exec­ut­ive plans. The draw and all the inform­a­tion refer to the Tubby slide, so for the sur­round­ing items (example walls, walk­ways, drain­ing, etc.) feel free to make as the cus­tom­er engin­eer advise. SOIL INDIC­A­TION The top lay­er of soil for the Tubby slides and the uphill slope must be done like one of the fol­low­ing options: A) Cm. 10 of clay soil, if using the Neve­plast net or NSF20 under­lay­er. B) Sta­bil­ized gravel, if using a NSF20 under­lay­er. (in Europe it is used the same under lay­er mater­i­al that is used for the roads under­neath the asphalt.) For all pre­par­a­tion area, it is import­ant that the top soil is homo­gen­eous, smooth, com­pact and rolled without rough­ness. For a bet­ter man­age­ment of the track (by the super­visors), we advise to sur­vey the tun­nel with cam­er­as and place the video at the start­ing area. DETAIL 1:100 PRE­LIM­IN­ARY arti­fi­cial snow fun neve­plast SCOT­LAND — CAIRNGORM — TUBBY EVO DRAW­ING N°: 20200206 PRE­LIM­IN­ARY LAY­OUT — TAB_02 PRE­LIM­IN­ARY DRAW­ING BY NEVE­PLAST +623,10 10.00 20% +621.00 +621,00 14.00 0% 26.00 19% STRAIGHT +621,00 +620.00

×

We want your feedback

Thank you for visiting our new website. We'd appreciate any feedback using our quick feedback form. Your thoughts make a big difference.

Thank you!