Item9AA3housesBoatOfGarten20190245DET
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Item 9 21/02/2020
CAIRNGORMS NATIONAL PARK AUTHORITY
DEVELOPMENT PROPOSED: Erection of three houses (Phase 3) at Land To South West Of Tigh Mhuileann Boat Of Garten
REFERENCE: 2019/0245/DET
APPLICANT: Mr David Greer
DATE CALLED-IN: 5 August 2019
RECOMMENDATION: APPROVE SUBJECT TO CONDITIONS
CASE OFFICER: Robbie Calvert, Graduate Planner
CNPA Planning Committee Application Site
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Item 9 21/02/2020
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Item 9 21/02/2020
SITE DESCRIPTION, PROPOSAL AND HISTORY
Site Description
The application site at Tigh Mhuileann currently comprises a mixture of grazing land, woodland, an existing 1970s detached bungalow and timber garage. It is located approximately 950m to the north of Boat of Garten, on the opposite side of the minor road C1128 to an existing sawmill operated by BSW timber. A watercourse enters the site at the south western corner which connects to Milton Loch, with all watercourses feeding into the River Spey Special Area of Conservation (SAC). On the south and west, the site is bounded by grazing land. A high voltage 132kV pylon line runs along the southern border of the site, which is currently being by installing underground cables. Low voltage lines run along the western and northern boundary markers.
Access is proposed from the C1128 minor road that runs from Boat of Garten to the A95 along the eastern site boundary of associated application (2019/0215/DET) via a new access point. To the south east of the site runs the core path from Boat to Drumullie (Core path ref: LBS71).
The application site measures approximately 0.58 Ha. The site slopes gently from northeast to southwest and has a linear mound on its northern edge which separates it from the A95. To the eastern side of the application is an Aspen and Birch woodland which wraps around to the southern edge of the site. The woodland is approx. 0.6ha in size and is classified as native woodland in the Native Woodland Survey of Scotland.
The site is part of a proposed wider development with an associated application for the demolition of an existing house and garage and erection of nine houses (2019/0215/DET) on land to the east.
Proposal
- The drawings and documents associated with this application are listed below and are available on the Cairngorms National Park Authority website unless noted otherwise: http://www.eplanningcnpa.co.uk/online- applications/applicationDetails.do?activeTab=summary&keyVal=PVI464SI0CH00
Title | Drawing Number | Date on Plan* | Date Received |
---|---|---|---|
Site Layout Plan | BSW 3 005 | June, 2019 | 12/11/19 |
Revision A | |||
Site Section Plan | BSW 3 003 | June, 2019 | 12/11/19 |
Revision A | |||
Location Plan Phase 3 | BSW 3 004 | June, 2019 | 12/11/19 |
Revision A | |||
Landscape Plan | Landscape | 05/02/20 | 06/02/20 |
Masterplan Final | |||
Revision 4 |
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Item 9 21/02/2020
Title | Drawing Number | Date on Plan* | Date Received |
---|---|---|---|
General Arrangement | AA6178/EW/02 | 23/01/19 | 30/01/20 |
Revision C | |||
Drainage Layout | AA6178/EW/03 | 23/01/19 | 30/01/20 |
Revision C | |||
Landscape Sections | Landscape | 29/10/19 | 12/11/19 |
Sections | |||
Revision I | |||
Tree Protection Plan | Tree | 29/10/19 | 12/11/19 |
Protection | |||
Plan Revision I | |||
Environmental Protection Plan | AA6178/EW/04 | 01/11/19 | 12/11/19 |
Revision A | |||
Passing Places and Road Width | AA6178/EW/10 | 23/01/19 | 12/11/19 |
Plan | |||
Croft House Elevations | BSW 3 015 | June, 2019 | 15/07/19 |
Croft House Roof and Floor | BSW 3 01 | June, 2019 | 15/07/19 |
Plans | |||
Croft House Sections | BSW 3 014 | June, 2019 | 15/07/19 |
Fair and Square Elevations | BSW 3 012 | June, 2019 | 15/07/19 |
Fair and Square Roof and | BSW_3_010 | June, 2019 | 15/07/19 |
Floor Plans | |||
Fair and Square Sections | BSW 3 011 | June, 2019 | 15/07/19 |
2 Bay Garage Plans and | BSW_3_023 | June, 2018 | 15/07/19 |
Elevations | |||
Supporting Design Statement | 17/06/19 | 15/07/19 | |
Extended Phase I Survey | February | 15/07/19 | |
Report | 2019 | ||
Landscape Character Area | 12/11/19 | ||
Drainage Impact Assessment | AA6178/8.4/DIA | 30/10/19 | 12/11/19 |
Landscape Design Statement | 12/11/19 | ||
Landscape and Mitigation | October, | 12/11/19 | |
Proposals | 2019 | ||
Landscape and Visual Impact | October, | 12/11/19 | |
Assessment | 2019 | ||
Construction Method | AA6178 | October, | 12/11/19 |
Statement | 2019 | ||
Housing Need and Demand | 12/11/19 | ||
Assessment | |||
Traffic Statement | AA6178 | 25/10/19 | 31/10/19 |
Geo-environmental | MM11842.RI.CT.S | February, | 22/08/19 |
Investigation Part I | DM.SG | 2019 | |
Geo-environmental | 1926594361 | 31/01/2019 | 22/08/19 |
Investigation Part 2 | |||
Geo-environmental | MM11842 | 13/09/18 | 22/08/19 |
Investigation Part 3 | |||
Bat Roost Assessment and | 19/015/TIL/R01 | 19/06/19 | 15/07/19 |
Activity Survey | Revision 1.2 | ||
*Where no specific day of month has been provided on the plan, the system defaults to the Ist of the | |||
month. |
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Item 9 21/02/2020
Plans of the proposals are included within Appendix 1.
The site is part of a wider proposed development with an associated application for the demolition of an existing house and garage and erection of nine houses (2019/0215/DET) on land to the east. The application seeks full planning permission for the erection of three residential units including plot layout, path links, infrastructure and landscaping. The proposed residential units are 3 detached houses with 3 associated detached parking garages, private driveway, SUDS system and path links. The location of the main access road, septic tank and soakaway are covered in the associated application 2019/0215/DET to the east. There are no proposed changes to ground levels.
Vehicle access will be provided through a new 5.5m wide adopted spur road from the C1128. Internal tracks leading to houses will be 4m wide and constructed with a rolled dust finish on type‑1 sub base. New paths within the site will link to paths that require separate planning consent to link to the BSW sawmill to the east and a longer path linking to Milton Loch and Boat of Garten.
The site will be connected to the public mains water supply and take electricity from a low voltage underground line that serves the existing buildings on site. Foul water from each property will be conveyed via a private foul drainage network to a shared septic tank and soakaway system designed for a population equivalent of 50 people. This is proposed to be located to the south of the site, outside of the red line of the application but within the blue line.
The private tracks will be drained using filter drains.
Surface water from the properties will be collected and transferred to 5 raingardens, providing a minimum of 1.5 m² stormwater storage per plot and natural filtration services. During high flow events overflow pipes will also carry excess water into perforated precast concrete manhole rings acting as additional storage and infiltration.
The house types are a range modern timber framed buildings intended to reflect a range of vernacular buildings. The walls and roofs of both houses and garages are clad in timber with slate roof materials.
A total of 10 car parking spaces have been provided, 3 of which have been indicated as visitor parking.
The application was originally supported by the following information: a) Design Statement; b) Ecological Survey and Assessment Report; and c) Bat Roost Assessment and Survey.
During the progression of the application, the agent has provided additional and amended information in response to queries raised during the consultation process, which is summarised as follows: a) Amended and additional plans: including amended general arrangements, drainage layout, typical roadworks details, proposed masterplan, landscape masterplan, tree protection plan and proposed site sections; additional plans for
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Item 9 21/02/2020
landscape design rationale, environmental protection measures and existing layout and services. b) Soils Investigations Report: supplementing the Drainage Impact Assessment c) Drainage Impact Assessment and amended Drainage Impact Assessment. d) Transport Assessment and amended Transport Assessment. e) C1128 Road Passing Places Assessment. f) Housing Need and Demand Assessments: supplemented by an engagement event with the local community with a drop-in session held at the Boat of Garten Village Hall. The study concludes severe lack of affordable housing in Boat of Garten and that the development meets demand for both 3 – 4 bedroom houses and 1 – 2 bedroom houses. This supplemented by details of the affordable housing requirements of the Rural Housing Fund that would be used to fund the project. g) Landscape and Visual Impact Assessment: that concludes that the proposals will have a low impact on the landscape at local level only and a low impact on visual receptors close to the site.
History
The site has a long-established use for agriculture and for the residential use of the current house, Tigh Mhuileann. The neighbouring BSW sawmill has expanded to its current size since 1973.
There are a small number of historic planning applications relating to the application site. Planning permission was granted on 14/05/2004 for change of use to public sales/display area, office and parking (04/00061/FULBS).
In 2018, Planning Permission in Principle was sought for the demolition of house, erection of 9 houses, composed of 4No. semi-detached and 5No. detached houses. (8/02776/PIP). The application was withdrawn on 29/06/2018.
An application for the demolition of an existing house and garage and erection of nine houses (2019/0215/DET) on land to the east of the site running concurrently with this application.
Habitats Regulations Assessment (HRA)
A Habitats Regulations Assessment has been undertaken to consider the effects of the proposal upon the conservation objectives of the Natura Sites on the River Spey Special Area of Conservation (SAC) and the following Special Areas of Conservation: Boat of Garten woods, Abernethy Forest, Kinveachy Forest, Craigmore Wood, Cairngorms and Anagach Woods.
The proposal was not considered to have an effect, either direct or indirect on the following species within the SPAs: Scottish crossbill, Capercaillie, osprey, dotterel, golden eagle, merlin and peregrine falcon. The assessment highlighted the need to assess the proposal against its likely effect on the River Spey SAC. It was concluded that subject to mitigation measures identified in the appropriate assessment and
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Item 9 21/02/2020
applied through conditions to any consent, the proposal will not adversely affect the integrity of the River Spey SAC. A copy of the HRA is attached at Appendix 2.
DEVELOPMENT PLAN CONTEXT
Policies
National Policy | Scottish Planning Policy 2014 | |
---|---|---|
Strategic Policy | Cairngorms National Park Partnership Plan 2017 — 2022 | |
Local Plan Policy | Cairngorms National Park Local Development Plan (2015) | |
Those policies relevant to the assessment of this application are marked with a cross | ||
POLICY I | NEW HOUSING DEVELOPMENT | X |
POLICY 2 | SUPPORTING ECONOMIC GROWTH | |
POLICY 3 | SUSTAINABLE DESIGN | X |
POLICY 4 | NATURAL HERITAGE | X |
POLICY 5 | LANDSCAPE | X |
POLICY 6 | THE SITING AND DESIGN OF DIGITAL COMMUNICATIONS EQUIPMENT | |
POLICY 7 | RENEWABLE ENERGY | |
POLICY 8 | SPORT AND RECREATION | |
POLICY 9 | CULTURAL HERITAGE | |
POLICY 10 | RESOURCES | X |
POLICY 11 | DEVELOPER CONTRIBUTIONS | X |
All new development proposals require to be assessed in relation to policies contained in the adopted Local Development Plan. The full wording of policies can be found at: http://cairngorms.co.uk/uploads/documents/Park Authority/Planning/LDP15.pdf
The site lies outwith the settlement boundary of Boat of Garten as designated by the Local Development Plan 2015. However, Policy 3: Other Housing in the Countryside supports proposals where they reinforce the existing pattern of development and are necessary for, or improves the operational and economic viability of an active business which has a locational requirement directly linked to the countryside. Policy 1: Affordable Housing Developments supports development of 100% affordable units where it meets a demonstrable local need through community needs assessments, housing needs and demand assessments or other information available at the time of application.
The Local Development Plan 2015 Settlement statement for Boat of Garten states as an objective that new housing can progress in a way that helps the community remain sustainable and is compatible with neighbouring designated sites.
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Item 9 21/02/2020
Planning Guidance
- Supplementary guidance also forms part of the Local Development Plan and provides more details about how to comply with the policies. Guidance that is relevant to this application is marked with a cross.
Policy 1 | New Housing Development Non-Statutory Guidance | X |
---|---|---|
Policy 2 | Supporting Economic Growth Non-Statutory Guidance | |
Policy 3 | Sustainable Design Non-Statutory Guidance | X |
Policy 4 | Natural Heritage Supplementary Guidance | X |
Policy 5 | Landscape Non-Statutory Guidance | X |
Policy 7 | Renewable Energy Supplementary Guidance | |
Policy 8 | Sport and Recreation Non-Statutory Guidance | |
Policy 9 | Cultural Heritage Non-Statutory Guidance | |
Policy 10 | Resources Non-Statutory Guidance | X |
Policy 11 | Developer Contributions Supplementary Guidance | X |
Cairngorms National Park Local Development Plan 2020
- The emerging Cairngorms National Park Local Development Plan (“Proposed Plan”) which will cover the period 2020 – 2025 is currently being progressed. The proposed plan has been through a public consultation process and the formal responses have been assessed and submitted along with all other relevant materials to Scottish Ministers for examination. As the examination of the Proposed Plan is yet to conclude, the Proposed Plan and its contents currently carry limited weight. In addition, proposals and policies which received heavy objection following the public consultation process are afforded even less weight.
CONSULTATIONS
Summary of the Main Issues Raised by Consultees
SEPA advised that potential impact upon groundwaters from such a large sewage discharge meant stringent treatments standards and significant investigatory and monitoring work was required for SEPA to issue a license for the foul drainage system. The following information was requested: a) Installation of three boreholes/piezometers recording location, groundwater quality depth of groundwater and flow direction, hydraulic gradient, aquifer permeability, description of unsaturated zone and consideration of the presence and concentration of various substances in the effluent. b) Details of proposed SUDs systems.
When re-consulted on proposals SEPA highlighted in the Drainage Layout drawing, no. AA6178/EW/03 Rev A, the septic tank and soakaway appear to be located outside the application boundary and reiterated advice previously provided.
SNH advised on possible impacts significant effect on the River Spey SSSI/SAC and impacts on Capercaillie from potentially increased recreational use and disturbance in Boat of Garten Woods:
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Item 9 21/02/2020
a) River Spey SAC: the proposal is likely to have a significant effect on the River Spey SAC unless waste water arrangements are in place that ensure that neither the water course or the River Spey SAC are negatively impacted upon by nutrients or other pollution arising from the septic tank or soakaway. b) Capercaillie on balance it was concluded that recreational disturbance to Capercaillie Boat of Garten Wood would not increase as a result of the proposal and is therefore unlikely to have a significant effect either directly or indirectly. An appropriate assessment of this element is therefore not required.
When re-consulted on proposals SNH concluded that there would likely be a significant effect on the freshwater pearl mussel and otter features of the River Spey SAC and therefore objected to the proposal unless it is made subject to conditions that ensure foul water drainage proposals are satisfactorily designed, implemented and managed in order to minimise any risk of pollution which may affect internationally important natural heritage interests. In accordance with the Habitats Regulations Appraisal carried out by CNPA if the appropriate mitigation is followed, there will not be an adverse effect upon the integrity of the River Spey SAC.
Scottish Water advised that they had no objection to the proposal.
The Highland Council (Transport Planning Team) object to the application, advised that the information submitted with it was inadequate and requested more information in order to fully assess the impacts of the proposal.
Following a number of stages of further information being submitted and reviewed, The Highland Council Transport Planning team continue to object for the following reasons: a) Car parking for detached houses does not meet Council guidelines. b) No proposals have been provided to demonstrate that path connection to Boat of Garten can be delivered and the site is not accessible by public transport. c) Surface water drainage system for roads not adequate for adoption.
Other issues requiring resolution were highlighted as follows: a) Condition should be included to maintain visibility recommended visibility splay from the access road junction to the C1128. b) Condition required to ensure C1128 from the access road to the a95 junction is a minimum of 5.5 metres wide. c) Individual driveways for the dwellings at the entrance of the site to the north- east are amended to have an angle of no less than 75°. d) Turning head to be enlarge for refuse vehicles as a part of the Road Construction Consent (RCC) process. e) Passing places be added to private tracks to prevent damages to verges. f) Layout for two houses at the southern bounds be amended so residents do not have to reverse into adjacent driveways. g) All road construction details be treated as indicative and be agreed through the RCC process.
- The Highland Council (Flood Risk Management Team) initially objected to the drainage strategy for the site, but following the submission of further information,
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Item 9 21/02/2020
withdrew the objection subject to a suitably worded condition requiring final detailed drainage design be submitted for review and approval.
The Highland Council (Forestry Team) objected to the proposed development pending further information to identify the impact of proposals on trees. The forestry officer was consulted on additional details provide but has not commented further. However, the CNPA’s heritage team are satisfied that conditions can be applied to protect trees and manage impacts.
CNPA Landscape Officer advised that overall the approach of landscaping of the site is welcomed, sitting well within the wider landscape contributing to both visual amenity and enhancing biodiversity. They request conditions on landscape planting, establishment, ground preparation and long-term management to include the aspen woodland to the north of the site.
CNPA Ecology Officer is satisfied that conditions can be applied to address potential impacts on species, habitats and protected sites.
CNPA Outdoor Access Officer supports the inclusion of facilities to promote active travel.
Boat of Garten Community Council did not comment on this application but commented on the associated application 2019/2015/DET. The issues addressed are directly applicable to this application and should be read in parallel with this application.
REPRESENTATIONS
- No representations were made for this application however representation made for the associated application 2019/2015/DET. The issues addressed are directly applicable to this application and should be read in parallel with this application.
APPRAISAL
- The main planning considerations are: the principle of development, the impact upon landscape, layout and design, the environmental impacts, access and servicing and developer contributions.
Principle of Housing
- Policy 1.5: New Housing Development (Affordable Housing Developments) of the Cairngorms National Park Local Development Plan 2015 provides support for development of 100% affordable housing where it meets a demonstrable local need shown through community needs assessments, housing needs and demand assessments or other information available at the time of application. This application is for 100% affordable housing in an area with an identified need for affordable housing. Policy 1.3b: New Housing Development (Other Housing in the Countryside) supports housing proposals on a rural brownfield site. Part of the application site is on a site of an existing house. The principle of the proposal is considered to be
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Item 9 21/02/2020
acceptable in accordance with the requirements of Policy 1: New Housing Development of the Cairngorms National Park Local Development Plan 2015, subject to the other planning considerations outlined below.
Landscape Issues, Layout and Design
Policy 5: Landscape of the Cairngorms National Park Local Development Plan 2015 presumes against development which does not conserve and enhance the landscape character and special qualities of the National Park and in particular the setting of the proposed development. This is reinforced by Policy 3: Sustainable Design, which seeks to ensure that all new development is sympathetic to the traditional pattern and character of the surrounding areas, local vernacular and local distinctiveness.
The overall the approach to landscaping of the site is considered appropriate, sitting well within the wider landscape contributing to both visual amenity and enhancing biodiversity. This is supported by submitted Landscape Visual Impact Assessment that concluded that proposals will have a low impact on the landscape at local level only and a low impact on visual receptors close to the site.
Subject to appropriate planning conditions to ensure the approval of final details of landscaping, layout and design, the proposal is considered to accord with Policy 3: Sustainable Design and Policy 5: Landscape of the Cairngorms National Park Local Development Plan 2015.
Environmental Impacts
Policy 4: Natural Heritage of the Cairngorms National Park Local Development Plan 2015 seeks to ensure that there are no adverse effects on European Protected Species and other biodiversity interests.
The Habitats Regulations Appraisal (HRA) for the application concludes that the development will not result in an increase in disturbance to Capercaillie so will not have an impact on European SPA sites designated for Capercaillie. The HRA also concludes that with the use of an appropriate condition to control waste water discharge, the proposal will not have adverse effects on the site integrity of the River Spey SAC.
Further conditions can be applied to ensure that impacts on other species and habitats are avoided and necessary mitigation measures incorporated in the development so the application is considered to comply with Policy 4: Natural Heritage of the Cairngorms National Park Local Development Plan 2015.
Flooding and Surface Water Drainage
- Local Development Plan Policy 10: Resources requires that all development should be free from significant risk of flooding, not increase the risk of flooding elsewhere, not add to the area of land requiring flood prevention measures and not affect the ability of the functional flood plain to store or move flood waters. This policy also requires that all development should avoid detrimental impacts on the
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Item 9 21/02/2020
water environment, with existing and potential impacts up and downstream of the development, particularly in respect of potential flooding, to be addressed. It presumes against unnecessary culverting of watercourses and any unnecessary engineering works in the water environment. This policy also requires that surface water be treated in accordance with the SUDS manual.
- The proposals will not increase flood risk and incorporate appropriate SUDS. Although Highland Council Transport Planning team continue to object to the detail of surface water drainage form roads, this is on the basis that the details are not to an adoptable standard. A condition can be applied to ensure that details are submitted for approval that comply with the council’s requirements. Subject to an appropriate condition regarding amended details of detailed drainage design and roads drainage infrastructure the proposed development is considered to comply with Policy 10: Resources of the Cairngorms National Park Local Development Plan 2015.
Servicing and Access
Policy 3: Sustainable Design and Policy 10: Resources of the Cairngorms National Park Local Development Plan 2015 set out the need for new development to be satisfactorily serviced and without harm to resources or the environment.
The principle of a road access to the site form the C1128 minor road is considered acceptable subject to maintenance of an appropriate visibility splay. The internal layout of new road for adoption and private access tracks is also considered acceptable. The Highland Council Transport Planning Team continue to object to the fine detail of a number of elements of road infrastructure including the location of visitor car parking and adopted road turning head in addition to the roads drainage. Some of the issues they raise will be addressed through the separate Roads Construction Consent (RCC) process that the applicant will need to apply for separately. The road turning head, revised parking provision for visitors cars and additional passing places on private tracks can be addressed through a condition for a revised roads layout plan.
The ability for residents to travel to nearby facilities without the need for private car has been an important consideration in this application. The full details of footpath provision toward Boat of Garten and the BSW sawmill site have not been provided with the application, but both are capable of being delivered on land within the control of the applicant. A suspensive condition that prevents development until detailed consents for those paths have been approved and a further consent that prevents occupation of any dwellings until the construction of those paths have been completed, will provide assurance that these necessary parts of infrastructure are provided as part of the overall development.
Subject to appropriate conditions, the proposed development is considered to comply with Policy 3: Sustainable Design of the Cairngorms National Park Local Development Plan 2015.
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Item 9 21/02/2020
Developer Contributions
- Policy 11: Developer Contributions of the Cairngorms National Park Local Development Plan 2015 sets out that where development gives rise to a need to increase or improve public services, facilities or infrastructure or mitigate adverse effects then the developer will normally be required to make a fair and reasonable contribution towards additional costs or requirements. The development is not predicted to have an impact on the capacity of Boat of Garten Primary School or Grantown Grammar School and no contribution is considered necessary. The proposed development is considered to comply with Policy 11: Developer Contributions of the Cairngorms National Park Authority Local Development Plan 2015.
Other Issues Raised in Consultations and Representations
- A number of concerns and comments were raised in relation to the path connection to Milton Loch. That path is not part of this planning application and further detail planning application will be required to be determined before any consent for it is issued and before development of this proposal could start.
CONCLUSION
- The proposed development is for 100% affordable housing in a location where it will help meet local need. The site is considered to be capable of being developed and serviced in this way without significant landscape or environmental effects. There are a number of points of detail that have not been sufficiently addressed through the application, but conditions can be applied to ensure they are fully resolved at appropriate stages either prior to development, prior to occupation or during the construction and maintenance of the development. Subject to those conditions, the proposed development is considered to fully comply with Local Development Plan policies and we recommend approval of the application.
RECOMMENDATION
That Members of the Committee support a recommendation to APPROVE the Demolition of house, erection of 9 houses, formation of access track and path at Tigh Mhuileann Boat Of Garten Highland PH24 3BG subject to the following conditions:
- Those conditions listed below in bold text are suspensive conditions, which require to be discharged prior to implementation of the development.
Conditions
- **No development shall commence until the full details of foul water treatment and discharge that demonstrates no significant effect on the River Spey SAC have been submitted to and approved in writing by the CNPA acting as planning authority in consultation with SEPA. The details must include a full groundwater investigation undertaken in accordance with SEPA guidance (WAT-RM-04 Indirect Sewage Discharges to
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Item 9 21/02/2020
- Groundwater section 1.1) and the outcome of the investigations must satisfy requirements under the Water Environment (Controlled Activities) (Scotland) Regulations 2011 (CAR) for any discharges to land or the water environment from private foul drainage systems.
Reason: To ensure that foul water drainage proposals are satisfactorily designed, implemented and managed in order to minimise any risk of pollution which may affect natural heritage interests including the River Spey Special Area of Conservation in accordance with Policy 3 Sustainable Design and Policy 4: Natural Heritage, of the Cairngorms National Park Local Development Plan 2015. No development shall commence until detailed planning permission has been granted for footpaths at least 1.5 metres wide connecting to Boat of Garten and to the sawmill off the C1128.
Reason: To ensure that satisfactory arrangements for the active travel are provided in accordance with Policy 3: Sustainable Design.
- No development shall commence until full details of the final drainage scheme have been submitted to and approved in writing by the CNΡΑ acting as Planning Authority in consultation with the Highland Council Transport Planning and Flood Management teams.
The approved drainage scheme shall be implemented and maintained in accordance with the approved details in full prior to the occupation of any dwellings within the development. Reason: To ensure that satisfactory arrangements for the disposal of surface water are provided in accordance with Policy 3: Sustainable Design, Policy 4: Natural Heritage and Policy 10: Resources of the Cairngorms National Park Local Development Plan 2015.
- No development shall commence on site until a revised Road Layout Plan has been submitted to and approved in writing by the Cairngorms National Park Authority acting as Planning Authority in consultation with the Highland Council Transport Planning Team. The approved road layout plan shall thereafter be implemented in full.
Reason: To