20250034 DET Site Visit Lettoch Nethy Risk Assessment 13 June 2025
Risk Assessment
CNPA Planning Committee Site Visit to Land 160M South of Lynstock Park, Nethy Bridge, 13 June 2025
Task / Work activity /operation Description:
CNPA Planning Committee Site Visit
13 June 2025 Site visit will commence at 09:30 hours.
Location:
Land 160M South of Lynstock Park Nethy Bridge
Date of assessment: 19 May 2025
Assessors: Katherine Donnachie
Review date:
Signature: Katherine Donnachie
Number | Hazards: e.g. Trailing cable | Persons & numbers exposed | Harm: e.g. Tripping over cable and spraining ankle. | Risk Rating Without Controls | Controls | Risk Rating With Controls | ||||
---|---|---|---|---|---|---|---|---|---|---|
C | L | R | C | L | R | |||||
1 | Road and traffic on site or enroute to site | Members of the CNPA Planning Committee, Staff & Members of Public | RTA’s and collisions | 4 | 1 | 4 | 1. Due to limited parking at the site, Members will travel to the site together by pre-arranged minibus. The site visit will commence from a parking area set off the public road. The road is a quiet one and the group will cross it when safe to enter the site. 2. Participants will be briefed to take care. | 4 | 1 | 4 |
2 | Weather — extremes of cold/wet/wind or warm weather | Members of the CNPA Planning Committee, Staff & Members of Public | Exposure | 3 | 1 | 6 | 1. Weather forecast will be checked prior to the date. 2. Advise members to wear appropriate clothing for the weather conditions. 3. Members can return to mode of transport whenever they choose. 4. Site visit will be cancelled if forecast is extreme or shortened or cancelled if weather conditions on site are extreme. 5. Site visit is of short duration. | 2 | 1 | 2 |
3 | Uneven ground | Members of the CNPA Planning Committee, Staff & Members of Public | Slips, trips & falls | 3 | 1 | 3 | 1. Site can be viewed from relatively even ground. It is an agricultural grazed field which can be walked over easily. 2. Members will be advised to wear appropriate footwear. | 3 | 1 | 3 |
Page 1 of 2
Further Recommendations
Additional controls that would further reduce the risk if Implemented in the future. | Date to be Actioned by | Date Completed |
---|---|---|
PPE Requirement
Risk Rating Key
Likelihood (L) x Consequence © = ®Overall Risk Rating
1 Very Unlikely 1 Insignificant 17 – 25 Unacceptable
2 Unlikely 2 Minor 10 – 16 Tolerable
3 Fairly Likely 3 Moderate 5 – 9 Adequate
4 Likely 4 Major 1 – 4 Acceptable
5 Very likely 5 Catastrophic
Checked by: David Berry Signature: David Berry Position: Head of Planning
Page 2 of 2