220624RiskAssessmentPlanningCommitteeSiteVisitLaurelBank
Risk Assessment
CNPA Planning Committee Site Visit to Laurel Bank, Aviemore 24 June 2022
Task / Work activity /operation Description: | Location: | Date of assessment: | Review date: |
---|---|---|---|
CNPA Planning Committee Site Visit to Laurel Bank site, Aviemore | Land 80M SW Of Mountain Café 111 Grampian Road Aviemore | 15 June 2022 | |
24 June 2022 | |||
Site visit will commence at 0930 hours. | Assessors: | Signature: | |
Emma Bryce | Emma Bryce |
Number | Hazards: e.g. Trailing cable | Persons & numbers exposed | Harm: e.g. Tripping over cable and spraining ankle. | Risk Rating Without Controls | Controls: E.g. re route cable or cover with cable tidy | Risk Rating With Controls |
---|---|---|---|---|---|---|
C L R | C L R | |||||
1 | Exposure to Covid 19 virus | Members of the CNPA Planning Committee, Staff & Members of Public | Becoming ill with Covid19 | 4 1 4 | 1. Site visit will be outside to reduce any risks of transmission. | 4 1 4 |
2 | Road and traffic on site or enroute to site | Members of the CNPA Planning Committee, Staff & Members of Public | RTA’s and collisions | 4 1 4 | 1. The site visit itself does not involve any road crossings or on road walking. The site can be viewed from the traffic free, public footpath running to the east and south of the site 2. People walking to the site visit may cross Grampian Road which is regularly crossed by pedestrians. A nearby pedestrian crossing has been identified in the briefing for members and the public. 3. Participants will be briefed to take care given the proximity of the site to Grampian Road and to use the public footpath. | 4 2 8 |
3 | Weather extremes | Members of the CNPA Planning Committee | Exposure | 3 1 6 | 1. Weather forecast will be checked prior to the date. | 2 1 2 |
Committee, Staff & Members of Public | of cold/wet/wind or warm weather | 2. Advise members to wear appropriate clothing for the weather conditions. 3. Members can return to mode of transport whenever they choose. 4. Site visit will be cancelled if forecast is extreme or shortened or cancelled if weather conditions on site are extreme. 5. Site visit is of short duration. |
Page 1 of 2
Further Recommendations
Additional controls that would further reduce the risk if Implemented in the future. | Date to be Actioned by | Date Completed |
---|---|---|
PPE Requirement
[PPE images were here but cannot be rendered in Markdown]
Risk Rating Key
Likelihood (L) | x | Consequence © | = | ® Overall Risk Rating |
---|---|---|---|---|
1 Very Unlikely | 1 Insignificant | 1 – 25 Unacceptable | ||
2 Unlikely | 2 Minor | 10 – 16 Tolerable | ||
3 Fairly Likely | 3 | 3 Moderate | 5 – 9 Adequate | |
4 Likely | 4 Major | 1 – 4 Acceptable | ||
5 Very likely | 5 Catastrophic |
Checked by: Gavin Miles Signature: Gavin Miles Position: Head of Strategic Planning
Page 2 of 2