230811PlanningCommitteeSiteVisitNethyBridgeRiskAssessment
Risk Assessment
CNPA Planning Committee Site Visit to Nethy Bridge Station and Yard, off Station Road, Nethy Bridge, II August 2023
Task / Work activity /operation Description: | Location: | Date of assessment: | Review date: |
---|---|---|---|
CNPA Planning Committee Site Visit to site off Station Road, Nethy | Nethy Bridge Station | 2 August 2023 | 2/8/2023 |
Bridge | and Yard, off Station | ||
11 August 2023 | Road, Nethy Bridge | ||
Site visit will commence at 0930 hours. |
Assessors: | Signature: |
---|---|
Emma Bryce | Emma Bryce |
Number | Hazards: | Persons & | Harm: | Risk Rating | Controls | Risk Rating | |||||
---|---|---|---|---|---|---|---|---|---|---|---|
e.g. | numbers | e.g. Tripping | Without | e.g. re route cable or cover with cable tidy | With | ||||||
Trailing | exposed | over cable | Controls | Controls | |||||||
cable | and spraining | ||||||||||
ankle. | C | L | R | C | L | R | |||||
1 | Exposure | Members of the | Becoming ill | 3 | 1 | 3 | 1. Site visit will be outside to reduce any risks of transmission. | 3 | 1 | 3 | |
to Covid | CNPA Planning | with Covid19 | |||||||||
19 virus | Committee, Staff | ||||||||||
& Members of | |||||||||||
Public | |||||||||||
2 | Road and | Members of the | RTA’s and | 4 | 1 | 4 | 1. The site visit is at a quiet location of Nethy Bridge that is off | 4 | 1 | 4 | |
traffic on | CNPA Planning | collisions | road. Access from other parking sites is via pavements or | ||||||||
site or | Committee, Staff | roads with slow-moving traffic. | |||||||||
enroute to | & Members of | 2. Participants will be briefed to take care. | |||||||||
site | Public | ||||||||||
3 | Weather – | Members of the | Exposure | 3 | 1 | 6 | 1. Weather forecast will be checked prior to the date but long | 2 | 1 | 2 | |
extremes | CNPA Planning | range forecast is for mild, dry weather. | |||||||||
of | Committee, Staff | 2. Advise members to wear appropriate clothing for the weather | |||||||||
cold/wet/ | & Members of | conditions. | |||||||||
wind or | Public | 3. Members can return to mode of transport whenever they | |||||||||
choose. | |||||||||||
warm | 4. Site visit will be cancelled if forecast is extreme or shortened | ||||||||||
weather | or cancelled if weather conditions on site are extreme. | ||||||||||
5. Site visit is of short duration. | |||||||||||
4 | Uneven | Members of the | Slips, trips & | 3 | 1 | 3 | Site can be viewed from relatively flat and even ground and | 3 | 1 | 3 | |
ground | CNPA Planning | falls | will not move to uneven ground or slopes. | ||||||||
Committee, Staff | |||||||||||
& Members of | |||||||||||
Public |
Further Recommendations Additional controls that would further reduce the risk if | Date to be | Date Implemented in the future. | Actioned by | Completed — — - | — — - | — — -
PPE Requirement
Risk Rating Key Likelihood (L) x | Consequence © | = | ®Overall Risk Rating — — - | — — - | — — - | — — - 1 Very Unlikely | 1 Insignificant | | 17 – 25 Unacceptable 2 Unlikely | 2 Minor | | 10 – 16 Tolerable 3 Fairly Likely | 3 Moderate | | 5 – 9 Adequate 4 Likely | 4 Major | | 1 – 4 Acceptable 5 Very likely | 5 Catastrophic | |
Checked by: Gavin Miles
Signature: Gavin Miles
Position: Head of Strategic Planning