ARC Paper 2 Annex 1 Strategic Risk Register
Risk Register
Risk A1
- Theme: All
- Risk category: Resources — financial
- Risk description: Public sector finances constrain capacity to allocate sufficient resources to deliver corporate plan.
- Mitigation/controls in place:
- Preventative: Ongoing liaison with Scottish Government through our sponsorship team, Peatland Action Team, and Rural Communities Team highlighting achievements of CNPA.
- Preventative: Corporate plan prioritised around anticipated Scottish Government budget allocations, taking on Board expectation of funding constraints.
- Remedial: Focus resource on diversification of income streams to alternative, non-public income generation.
- Remedial: Continuing to support “delivery bodies” such as Cairngorms Nature, Cairngorms Trust in securing inward investment.
- Current likelihood: 4
- Current impact: 3
- Risk score: 12
- Trend: Static
- Comment: Allocations for 2026⁄27 financial year provide a good settlement sufficient to cover planned delivery against corporate plan objectives. Mitigation actions have supported positive risk management. Risk decreasing while recognising allocations remain subject to approval of Scottish budget, with residual risk around in year adjustments. Award of £1.045 million from NRF together with significant NLHF funding to 2029 confirms success of mitigation approaches. Election result suggests continuation of allocations for 2026⁄27 financial year, while engagement with new Minister and monitoring of national financial position updates from Government will be needed. Resource impacts of the wildfire are still be assessed and discussions have taken place with Scottish Government about impacts on Park Authority budgets.
- Planned actions:
- Preventative: Ongoing liaison with Scottish Government through our sponsorship team and the Peatland Action Team, highlighting achievements of CNPA.
- Preventative: prepare briefing on work and priority investment for post-election in line with development of new 2027 to 2032 Corporate Plan and NPPP.
- Remedial: scenario planning on forward budget modelling to prepare options for future resource allocations within final allocations, based on funding parameters suggested by sponsorship team.
- Due date: Ongoing
- Risk appetite: Open
- Target likelihood: 4
- Target impact: 3
- Target risk score: 12
- Risk owner: David Cameron
- Date last updated: 11/09/2026
Risk A24
- Theme: All
- Risk category: Resources — financial
- Risk description: Risk of C2030 match funding not being secured — current match funding in bid not fully committed and/or for one year only in many areas.
- Mitigation/controls in place:
- Preventative: Ongoing liaison with Scottish Government through our sponsorship team and the Peatland Action Team, highlighting achievements of CNPA and importance of Peatland Restoration funding to inward investment by NLHF.
- Remedial: Discussions with Transport Scotland on funding for active travel design work.
- Remedial: consider offsetting expenditure reductions to offset any funding gaps within programme
- Remedial: ongoing exploration with partners to secure C2030 programme funding
- Current likelihood: 4
- Current impact: 4
- Risk score: 16
- Trend: Static
- Comment: Funding for 2026⁄27 Peatland Restoration has been secured in line with requirements. This provides a suitable level of match funding for the C2030 programme, in line with the programme’s 5‑year budget. Peatland restoration delivery profile is healthy, with expectation that sufficient will be spent within the year to meet required contribution to C2030 delivery. Contractor for RIBA stages 3 and 4 design work now appointed. Transport Scotland annual funding cycles do not fit the project delivery requirements and alternate financial solutions are needed to complete work. Additional award of funding for 2026⁄27 is now in application process, with contract activity being maintained through other programme finances. Positive progress in securing external funding for C2030 for transport and nature projects. Discussions with HIE progressing well toward securing budgeted contribution plus potentially a slight increase (to £600k).
- Planned actions:
- Preventative: continued focus over 2026 on match funding position and consequent impacts to ensure C2030 programme plans and financing of them fully aligned by end of year.
- Preventative: high profile and ongoing focus for SMT in engaging in influencing to secure the match funding needed from partners; project managers aware of relevant project match funding position and tasked with seeking additional match funding where appropriate.
- Preventative: consideration of new, wider match funding opportunities.
- Remedial: Fully updated C2030 budget development in Q1 of 26⁄27 to identify any remaining specific issues or remedial work.
- Remedial: Use of planned park authority contributions as interim measures to bridge temporary phasing shortfalls.
- Due date: Ongoing
- Risk appetite: Open
- Target likelihood: 4
- Target impact: 2
- Target risk score: 8
- Risk owner: David Cameron
- Date last updated: 11/09/2026
Risk A25
- Theme: Nature & conservation
- Risk category: Strategic delivery
- Risk description: The Authority’s range of powers combined with strategic partnerships is insufficient to deliver outcomes on wildlife crime. Wildlife crime is difficult to evidence and populations are affected by a variety of interrelated factors.
- Mitigation/controls in place:
- Preventative: licencing arrangements contribute to more effective control framework.
- Preventative: Tracker/satellite monitoring deployed for some raptors. Data gathering to highlight presence/absence
- Remedial: NPPP development processes used to explore partnership attitudes, engagement and powers. Targeted, tangible intervention at known drivers of population decline.
- Current likelihood: 3
- Current impact: 4
- Risk score: 12
- Trend: Static
- Comment: Action on wildlife crime depends on the development, delivery and design of strategic partnerships. Financial constraints within the public and third sectors is likely to reduce the level of resource available to tackle this issue. No direct correlation between intervention and population increases due to complexity of factors, but tangible efforts demonstrate commitment to the issue.
- Planned actions:
- Remedial: Development/strengthening of strategic partnerships.
- Due date: Ongoing
- Risk appetite: Open
- Target likelihood: 3
- Target impact: 2
- Target risk score: 6
- Risk owner: Andy Ford
- Date last updated: 20/01/2025
Risk A26
- Theme: All
- Risk category: Systems development
- Risk description: Supporting speed of organisational change prevents required development and embedding of effective support systems. The speed / scale of operational demand for support from corporate systems is such that we are more reactive and focused on project specific issues rather than proactively designing effective, generic support systems. However, that ongoing fire-fighting and immediate advice prevents us having sufficient time to design, develop and implement new systems to better suit the new organisation.
- Mitigation/controls in place:
- Remedial: recruitment of additional staff to corporate function during 22⁄23 and 23⁄24.
- Remedial: project management training provided
- Remedial: development of improved systems/ways of working through better use of M365 applications
- Remedial: Implement new finance system to support wider digitisation of systems and effective financial reporting.
- Preventative: design and implement project initiation controls supporting more managed timelines and fuller, earlier consideration of project plans.
- Current likelihood: 3
- Current impact: 3
- Risk score: 9
- Trend: Static
- Comment: Initial mitigation actions now in place and embedding, including project initiation controls. New finance system installed on schedule by 31/03/25; new project initiation control system implemented during 2025. Further reinforcement of operation of controls now underway for 26⁄27 operational plan. Managers group also reviewing future streamlining approaches.
- Planned actions:
- Remedial: apply resource to development of improved systems/ways of working including streamlining and clarifying systems
- Remedial: provide training — procurement and in wider assessment of project impacts at initiation stage.
- Remedial: ongoing roll-out and embedding of project initiation guidance.
- Due date: 31/03/2027
- Risk appetite: Open
- Target likelihood: 3
- Target impact: 2
- Target risk score: 6
- Risk owner: David Cameron
- Date last updated: 11/05/2026
Risk A13/A18
- Theme: All
- Risk category: Technical
- Risk description: CNPA IT services are not sufficiently robust/secure/or well enough specified to support effective and efficient service delivery. Increasing demand for knowledge around Microsoft 365 and cyber security is outstripping the team’s knowledge/skill-set.
- Increasing ICT dependency for effective and efficient operations is not adequately backed up by ICT systems support.
- Use of AI increases risk of cyber security threats such as spear-phishing.
- Mitigation/controls in place:
- Preventative: Daily review of Scottish Cyber Coordination Centre threat summaries, with follow up action taken (eg patching) as appropriate.
- Preventative/remedial: Collaboration with LL&TNPA provides support.
- Preventative: advisory internal audit commissioned Jan 26 to support planning of future systems development
- Preventative: Transition to Sharepoint complete; R‑drive now a read-only repository, reducing risk of threats from outside the organisation.
- Preventative: implement Cyber Security Plus controls
- Consideration given to effectiveness of shared services with LL&TNPA.
- Current likelihood: 5
- Current impact: 3
- Risk score: 15
- Trend: Escalating
- Comment: Movement into Microsoft 365 deployment and cloud based systems continues to evolve and become embedded. Cyber Essentials accreditation now in place and systems operating to those standards. Development of the IT operational risk register has identified potential for structural improvement. These considerations to be developed further: action to be taken on advisory audit and business continuity planning once advice is received. Cyber essentials accreditation has been renewed.
- Planned actions:
- Action to be taken on advisory audit and business continuity planning: report now in place which highlights a significant action plan to be addressed.
- A review of IT staff role descriptions now completed; renewed focus on IT action plans will flow from that.
- Work on the information management plan will produce greater resilience of data and access to key information when complete.
- Due date: Ongoing
- Risk appetite: Cautious
- Target likelihood: 4
- Target impact: 2
- Target risk score: 8
- Risk owner: David Cameron
- Date last updated: 11/05/2026
Risk A22
- Theme: All
- Risk category: Technical
- Risk description: Business Continuity Plans (BCP) are inadequate to deal with significant impacts to normal working arrangements and result in service failure.
- Mitigation/controls in place:
- Preventative: Development of hybrid working methods and cloud computing approaches have improved the organisation’s resilience.
- Remedial: develop updated business continuity plan and embed its provisions
- Current likelihood: 5
- Current impact: 4
- Risk score: 20
- Trend: Static
- Comment: Advisory audit on IT provision now commissioned and report under consideration. Outputs from this will plug into wider BCP which will be completed by 2026⁄27 year end.
- Planned actions:
- Preventative: proposed consultancy to develop new BCP
- Due date: 31/03/2027
- Risk appetite: Open
- Target likelihood: 3
- Target impact: 1
- Target risk score: 3
- Risk owner: David Cameron
- Date last updated: 11/05/2026
Risk A23
- Theme: All
- Risk category: Reputation
- Risk description: Reputational damage may result from:
- Unrealistic expectations of what the Park Authority and its partners can achieve in the face of the significant risks presented by climate change, species extinction, flood management and fire; and/or
- Disagreement between the Park Authority and stakeholder groups within the Park.
- Disinformation circulated about the Park Authority’s actions
- Mitigation/controls in place:
- Preventative: Existing strategic partnerships and stakeholder relationships help to create a wider understanding of the factors that are within, and those that are outside the control of the Park Authority and its partners.
- Preventative: communications strategy development and implementation to ensure Park Authority’s messages and information are widely received and understood by appropriate audiences
- Current likelihood: 3
- Current impact: 3
- Risk score: 9
- Trend: Static
- Comment: Scoring reviewed following overview of NPPP delivery to be submitted to board in September, with likelihood decreased from 4 to 3. Stakeholder relationship database now designed and under development. Effective Wildfire Byelaw communications with strongly positive reactions to those communications helping enhance positive reputation. ‑Ongoing assessment of operational risk sense reputational management management and mitigation in our. Overall of risks currently in a managed position. Future consultation in next NPPP for 2027 to 2032 will open further dialogue with all stakeholders. Need to consider resources needed to deliver on wildfire management post Abernethy and the potential for expectations on the Park Authority to fix national issues.
- Planned actions:
- Preventative: Management of expectations through:
- Targeted communications
- Further development of stakeholder relationships.
- Development/strengthening of strategic communications.
- Development of stakeholder relationship database
- Clear positioning on the Park Authority’s role/level of involvement in significant issues
- Preventative: Management of expectations through:
- Due date: Ongoing
- Risk appetite: Minimal
- Target likelihood: 3
- Target impact: 3
- Target risk score: 9
- Risk owner: Grant Moir
- Date last updated: 11/09/2026
Risk A27
- Theme: All
- Risk category: Strategic delivery
- Risk description: The Park Authority does not adequately respond or adapt to changes in funding or policy environment at Scottish Government policy levels; from external funding sources; or in evolution of private finance investment.
- Mitigation/controls in place:
- Preventative: allocate senior time to engagement with Scottish Government in policy discussion and development, identifying and responding to risk implications.
- Preventative: proactively identify opportunities for private investment and structures to support their investment to complement and support NPPP and corporate objectives.
- Preventative: prioritise time allocation to policy evolution, such as Public Service Reform
- Current likelihood: 3
- Current impact: 2
- Risk score: 6
- Trend: Decreasing
- Comment: Positive relationships developed at senior levels on engagement with the Park Authority and our financial requirements. Work progressing on development of a private finance framework. Need identified to begin planning for end of C2030 financing period and replacement of NLHF funding within the Park Authority’s resource mix. Senior staff are fully engaged at a leadership level in Public Service Reform and wider policy evolution.
- Planned actions:
- Finalise private finance framework
- Public Service Reform actions on place based action and staff deployment flexibility; action on corporate services costs base.
- Due date: 31.03.26
- Risk appetite: Cautious
- Target likelihood: 2
- Target impact: 2
- Target risk score: 4
- Risk owner: David Cameron
- Date last updated: 11/05/2026
Risk A28
- Theme: All
- Risk category: Resources — staffing
- Risk description: The Park Authority’s workforce is not adequately flexible to respond to changing strategic priorities or to changing operational scale
- Mitigation/controls in place:
- Preventative: workforce management strategy updated and regularly reviewed to take a 5+ year forward view.
- Preventative: continued investment in training and development for staff supporting performance in current roles and succession/development plans.
- Preventative: establish an appropriate mix of permanent and fixed term staff to allow for flexibility in future structures.
- Remedial: retain scrutiny of all vacancies and identification of opportunities to adapt vacancies toward future needs.
- Current likelihood: 3
- Current impact: 3
- Risk score: 9
- Trend: Static
- Comment: Workforce management strategy reviewed by board at business session, October 2025. This will now guide associated policy development work following full internal consultation. Mitigation actions progressing to plan. Resources Committee review of Workforce Management and wider Organisational Development and People Strategy 15 May, followed by staff consultation through remainder of May and June 2026.
- Planned actions:
- Consultation on workforce management strategy.
- Development of organisational policies supporting delivery of workforce management objectives.
- Due date: 31.12.26
- Risk appetite: Open
- Target likelihood: 3
- Target impact: 3
- Target risk score: 9
- Risk owner: David Cameron
- Date last updated: 11/05/2026
Risk A29
- Theme: All
- Risk category: Systems development
- Risk description: NPPP delivery responsibilities are not sufficiently clear across the partnership and Park Authority is expected to address more than it is capable to deliver.
- Mitigation/controls in place:
- Preventative: reinforce specific partner delivery responsibilities through performance management systems and reporting.
- Preventative: reinforce NPPP delivery linkages through grant contract terms.
- Current likelihood: 3
- Current impact: 4
- Risk score: 12
- Trend: Static
- Comment: NPPP Performance Management dashboard now complete.
- Planned actions:
- Partner engagement and clarity of responsibility to be addressed as aspect of development of 27 – 32 NPPP.
- Due date: 31.12.26
- Risk appetite: Open
- Target likelihood: 3
- Target impact: 2
- Target risk score: 6
- Risk owner: Gavin Miles
- Date last updated: 11/05/2026
Risk A30
- Theme: All
- Risk category: Technical
- Risk description: Evolution of the Park Authority’s range of activities and projects results in unidentified and unmitigated exposure to legal implications and associated liabilities
- Mitigation/controls in place:
- Preventative: undertake risk analysis overview of 2025⁄26 operational plan to identify any delivery areas with potential exposure; develop and deliver mitigation action plan
- Current likelihood: 2
- Current impact: 4
- Risk score: 8
- Trend: Decreasing
- Comment: Evidence that project initiation processes is working in drawing out potential legal implications of project plans. Continued evidence of widening scope of activity and innovation in finding delivery solutions which continues to require attention. Impact of risk assessed as down while likelihood increased. Internal review undertaken and project initiation approach embedding within the organisation.
- Planned actions:
- Monitor effectiveness of system and level of any issues arising. New actions on this risk are embedded within the actions on project initiation and internal control systems noted against other risks.
- Due date: 31.12.26
- Risk appetite: Open
- Target likelihood: 3
- Target impact: 1
- Target risk score: 3
- Risk owner: David Cameron
- Date last updated: 11/09/2026
Risk A31
- Theme: Place
- Risk category: Strategic delivery
- Risk description: Uncertainties on finance, procurement, contractor capacity and partnership development combine to prevent achievement of key Cairngorms 2030 community transport infrastructure enhancements.
- Mitigation/controls in place:
- Preventative: pressure on external funders to make decisions within necessary timetable
- Preventative: revised procurement approach to simplify requirements and minimise perceived contractor risk
- Preventative: establish over-arching agreements with partners
- Preventative: engage at senior levels with Scottish Government to ensure there is clarity in public policy with regard to workforce management actions and staffing levels
- Current likelihood: 3
- Current impact: 4
- Risk score: 12
- Trend: Decreasing
- Comment: Progress over 2025 in managing these external risks to programme delivery has been generally successful with consequential declining risk profile. Ongoing contact with external funders to secure funding for 2026⁄27. Development of memorandum of agreement with key local authority partner.
- Planned actions:
- Preventative: Management Team Policy Day overview of programme status; evaluation of 2029 outcomes; identification of key actions and risk mitigations
- Due date: March 2026
- Risk appetite: Cautious
- Target likelihood: 3
- Target impact: 2
- Target risk score: 6
- Risk owner: Gavin Miles
- Date last updated: 18/02/2026
Risk A32
- Theme: All
- Risk category: Resources — staffing
- Risk description: Delivery opportunities and external funding offers are lost as a consequence of constraints on staffing levels imposed by public policy and workforce management controls underpinned by external and non-core income.
- Mitigation/controls in place:
- Preventative: ensure internal workforce management policy and management procedure operates appropriately within the agreed national policy position
- Preventative: seek to move to a more dynamic and flexible staffing position allowing deployment of staff resource toward emerging priorities
- Current likelihood: 4
- Current impact: 3
- Risk score: 12
- Trend: Decreasing
- Comment: Staffing levels managed against committed full time equivalent figure provided to Scottish Government in 2025 return. Multi-year workforce management and financial forecasts established to guide actions.
- Planned actions:
- Monitoring of quarterly employment statistics against target figure.
- Due date: Ongoing
- Risk appetite: Cautious
- Target likelihood: 2
- Target impact: 2
- Target risk score: 4
- Risk owner: David Cameron
- Date last updated: 11/05/2026
Risk A3
- Theme: All
- Risk category: Resources — staffing
- Risk description: There are perceived gaps in our skill set with respect to: procurement processes, recruitment of technical staff, ability to undertake necessary due diligence on output from consultants and contractors.
- Risks that procurement and wider skill set capacities are insufficient to meet the evolving needs of the organisation.
- Lack of expertise and experience in managing construction projects may compromise the effectiveness and efficiency of planned delivery.
- Financial risks associated with the letting of contracts where partnership funding is likely to be dependent on the achievement of satisfactory standards.
- Mitigation/controls in place:
- Preventative: Recruitment of Procurement Officer
- Preventative: Support secured from Scotland Excel (and from Central Government Procurement Shared Services (CGPSS) if required).
- Preventative: Consider delivery through partners with construction project delivery experience where appropriate to delivery objectives.
- Remedial: use of legal support or other outsourced support where required
- Current likelihood: 4
- Current impact: 2
- Risk score: 8
- Trend: Managed
- Comment: This risk now appears under effective management. As a relatively small organisation, staff turnover will have significant impacts on position. Recruitment to new Procurement Officer post achieved. Programme of improvement in procurement processes, procedures and controls well underway, including establishment of new Procurement Strategy. Construction projects of the size anticipated within the C2030 programme are new to the organisation. We need to improve our knowledge of Construction Design Management Regulations (CDM) and contracts (NEC4). We lack experience in producing briefs and reviewing tenders of this size and type. Improvements in our skill set will also benefit: peatland restoration, river restoration, construction of paths, active travel projects.
- Planned actions:
- Preventative: explore back up arrangements — shared services and commercial back up including increasing scale of our operations if supported by shared service income from third parties
- Preventative: Staff retention approaches and link to organisational development.
- Remedial: Continued focus on training and development of staff
- Due date: 31/03/2026
- Risk appetite: Cautious
- Target likelihood: 4
- Target impact: 2
- Target risk score: 8
- Risk owner: David Cameron
- Date last updated: 11/05/2026
Risk A4
- Theme: All
- Risk category: Resources — staffing
- Risk description: Increasingly competitive and restricted recruitment climate prevents staff with the required experience and skill sets being secured. Planning and other specialist staff (IT, procurement, finance) requirements impacted by national labour/skills shortages and/or salary structures not sufficiently competitive to attract or retain key staff.
- Mitigation/controls in place:
- Preventative: focus on training and development and internal succession planning, in turn bringing recruitment into less experienced/less highly skilled markets and developing pipeline of qualified staff
- Preventative: consideration given to job design, creating roles with more seniority (higher grades), and flexibility of offer regarding part-time/job share.
- Current likelihood: 3
- Current impact: 2
- Risk score: 6
- Trend: Managed
- Comment: Evidence of reducing number of applicants and candidate lists for vacancies ongoing, while trend in unsuccessful recruitment exercises has been acted on with no recent unsuccessful recruitment. Successful recent recruitment in difficult sectors including procurement and planning. Salary structures reviewed with three year pay position now agreed.
- Planned actions:
- Remedial: contingency planning for example around out-sourcing of aspects of delivery eg establish call-off framework for consult planning services.
- Due date: 31/03/2025
- Risk appetite: Open
- Target likelihood: 3
- Target impact: 2
- Target risk score: 6
- Risk owner: David Cameron
- Date last updated: 12/05/2025
Risk A5
- Theme: All
- Risk category: Resources — staffing
- Risk description: Scottish Government Main Group award 2023⁄25 creates significant financial pressure on the Park Authority’s resource budget for 2024⁄25, with the potential to affect positive relationships with the Union, staff morale and motivation, recruitment and retention.
- Mitigation/controls in place:
- Preventative: development of pay models to identify the potential cost to the Park Authority of following the Main Group position & consider the impact of potential pay strategies on the developing budget position for 2024⁄25;
- Preventative: consider pay award dates and staged awards as tools to meet expectations while maintaining affordability
- Preventative: Staff and financial resources considered during budget development process for 24⁄25.
- Current likelihood: 3
- Current impact: 3
- Risk score: 9
- Trend: Managed
- Comment: Pay models developed are being accommodated within the budget based on indicative Grant-in-Aid funding for 2024⁄25.
- Planned actions: N/A
- Due date: Open
- Risk appetite: Open
- Target likelihood: 3
- Target impact: 3
- Target risk score: 9
- Risk owner: David Cameron
- Date last updated: 20/01/2025
Risk A9.3
- Theme: All
- Risk category: Resources — staffing
- Risk description: Our Corporate and Operational Planning systems do not adapt to delivery of major funded programmes alongside delivering ‘core’ national park objectives. This leads to workforce stretch between 3rd party funding delivery and ‘core’ corporate plan activities with increased risks of stress and reduced morale.
- Mitigation/controls in place:
- Preventative: Strategic and operational plans developed with externally funded project delivery as intrinsic elements of plans to ensure delivery capacity is considered fully.
- Preventative: Importance of staff management and task prioritisation reinforced through leadership meetings.
- Preventative: Focus on fewer, larger impact projects (C2030).
- Remedial: Performance Development Conversations (PDCs) being deployed regularly with all staff to check on staff workloads, with 2 way flows of communications enabled through that process on staff workload and capacity.
- Preventative: Staff and financial resources for C2030 considered alongside operational plan activity as part of budget development process for 24⁄25.
- Current likelihood: 3
- Current impact: 3
- Risk score: 9
- Trend: Managed
- Comment: Additional recruitment has alleviated key staff pressure points. Fixed term staff contracts reviewed throughout the year. Staff survey results (23÷24) positive. Impact score of 3 reflects the risks inherent in the likely intensity of work during initial stages of C2030. Likelihood of risk therefore held static. Impact of measures and risk profile will continue to be closely monitored through staff management processes.
- Planned actions: N/A
- Due date: Open
- Risk appetite: Open
- Target likelihood: 3
- Target impact: 3
- Target risk score: 9
- Risk owner: David Cameron
- Date last updated: 20/01/2025
Risk A12
- Theme: All
- Risk category: Resources — staffing
- Risk description: Scottish Government pay remit for 24⁄25 is lower than desired pay award. Pay expectations of staff may not be met, leading to issues with pay alignment with other NDPBs and consequent effect on staff morale and motivation
- Mitigation/controls in place:
- Preventative: Development and submission of business case for pay alignment in keeping with SG national two-year sectoral pay award.
- Current likelihood: 2
- Current impact: 2
- Risk score: 4
- Trend: Managed
- Comment: SG remuneration Group turned down initial business case. Amended business case submitted and approval received end Aug 24. Staff consultation underway to end Oct. Seasonal staff position resolved satisfactorily. Awards for coming three years agreed.
- Planned actions: N/A
- Due date: 31/12/2024
- Risk appetite: Open
- Target likelihood: 2
- Target impact: 1
- Target risk score: 2
- Risk owner: David Cameron
- Date last updated: 20/01/2025