Skip to content
Please be aware the content below has been generated by an AI model from a source PDF.

Formal Board Paper 1 Annex 1.20 Digital infrastructure

Cairngorms Nation­al Park Author­ity Ùgh­dar­ras Pàirc Nàiseanta a’ Mhon­aidh Ruaidh

Paper 1

Form­al Board Paper 1 Annex 1.20 13 March 2026

Annex 1.20

Live­able places

Sched­ule 20: Digit­al infrastructure

Cairngorms Nation­al Park Loc­al Devel­op­ment Plan: Evid­ence Report March 2026

Sched­ule 20: Digit­al infrastructure

March 2026

Sched­ule contents

Require­ments addressed in this sched­ule Links to evid­ence Sum­mary of evid­ence Policy con­text Nation­al Plan­ning Frame­work 4 Legis­la­tion and nation­al doc­u­ments Nation­al Park Author­ity doc­u­ments Loc­al author­ity doc­u­ments Com­munity action plans Baseline This sec­tion provides baseline inform­a­tion on the fol­low­ing matters:

  • Fixed broad­band infrastructure
  • Broad­band con­nectiv­ity in the Cairngorms Nation­al Park
  • Fixed Broad­band implic­a­tions for the Pro­posed Plan
  • Mobile net­work coverage
  • Mobile net­work cov­er­age implic­a­tions for the Pro­posed Plan
  • Tele­com­mu­nic­a­tions masts
  • Oth­er digit­al infra­struc­ture Evid­ence gaps Sum­mary of stake­hold­er engage­ment Sum­mary of implic­a­tions for Pro­posed Plan State­ments of agree­ment State­ments of dispute

Cairngorms Nation­al Park Loc­al Devel­op­ment Plan: Evid­ence Report 2026 Live­able places | Sched­ule 20: Digit­al infrastructure

Require­ments addressed in this schedule

Table 1 Inform­a­tion required by the Town and Coun­try Plan­ning (Scot­land) Act 1997, as amended (CNPA003), regard­ing the issues addressed in this schedule.