Annu­al report and accounts 2025⁄26 …an out­stand­ing nation­al park, enjoyed and val­ued by every­one, where nature and people thrive together…

AITH­ISG BHLIADH­NAIL AGUS CUN­NTAS­AN 2025⁄26 …sàr phàirc nàiseanta, a tha a’ còrdadh ris a h‑uile duine agus air a bheil iad uile a’ cur luach, agus far a bheil nàdar agus daoine a’ soirbheacha…

Page 1 of 122

Laid before the Scot­tish Par­lia­ment by the Cab­in­et Sec­ret­ary for Rur­al Affairs, Land Reform and Islands, in pur­su­ance of Sec­tion 26 of the Nation­al Parks (Scot­land) Act 2000. The Annu­al Report and Accounts 2025 – 26 are being laid before Scot­tish Par­lia­ment by the Cab­in­et Sec­ret­ary for Rur­al Affairs, Land Reform and Islands in pur­su­ance of Sec­tion 22(5) of the Pub­lic Fin­ance and Account­ab­il­ity (Scot­land) Act 2000.

SG/2026/221: Cairngorms Nation­al Park Author­ity Report and Accounts 2025⁄26

Page 2 of 122

CON­TENTS

Page

1 PER­FORM­ANCE REPORT 1.1 Key Per­son­nel and Spon­sor­ing Body 3 1.2 Chief Executive’s For­ward 5 1.3 The Park Author­ity 7 1.4 Stra­tegic Aims and Pri­or­it­ies 2025⁄26 and bey­ond 14 1.5 Key issues and Risks 17 1.6 Fin­an­cial Per­form­ance Sum­mary 18 1.7 Oper­at­ing Per­form­ance Sum­mary 25

2 ACCOUNT­AB­IL­ITY REPORT 2.1 Gov­ernance Report 49 2.1.1 Dir­ect­ors’ Report 49 2.1.2 State­ment of Nation­al Park Authority’s Respons­ib­il­it­ies 56 2.1.3 State­ment of Board’s Respons­ib­il­it­ies 56 2.1.4 State­ment of the Account­able Officer’s Respons­ib­il­it­ies 57 2.2 Gov­ernance State­ment 58 2.3 Remu­ner­a­tion and Staff Report 67 2.4 Par­lia­ment­ary Account­ab­il­ity Dis­clos­ures 87 2.5 Inde­pend­ent Auditor’s Report to the Mem­bers of the Cairngorms Nation­al Park Author­ity, the Aud­it­or Gen­er­al for Scot­land and the Scot­tish Gov­ern­ment 89

3 FIN­AN­CIAL STATEMENTS 3.1 State­ment of Com­pre­hens­ive Net Expendit­ure 93 3.2 State­ment of Fin­an­cial Pos­i­tion 94 3.3 State­ment of Cash Flows 95 3.4 State­ment of Changes in Tax­pay­ers’ Equity 96 3.5 Notes to the Fin­an­cial State­ments 97

APPENDIX 1 Accounts Dir­ec­tion 121

Page 3 of 122

1 PER­FORM­ANCE REPORT

PER­FORM­ANCE OVERVIEW

Cairngorms Nation­al Park Author­ity presents this Annu­al Report and Accounts for the year from 1 April 2025 to 31 March 2026 in accord­ance with The Nation­al Parks (Scot­land) Act 2000.

The accounts have been pre­pared on a going con­cern basis as the Board and Account­able Officer believe that future liab­il­it­ies will be met from a com­bin­a­tion of cash budget alloc­a­tion from the Scot­tish Gov­ern­ment, future grants from part­ner agen­cies, and income from chargeable activities.

This over­view out­lines the struc­ture of the Author­ity, and its aims and pur­poses; it provides a sum­mary of the Authority’s per­form­ance dur­ing the year and the impact and man­age­ment of key risks.

1.1 Key Per­son­nel and Spon­sor­ing Body

Spon­sor­ing body Envir­on­ment and Forestry Dir­ect­or­ate, Nat­ur­al Resources Divi­sion, Scot­tish Government

The Board The Nation­al Park Author­ity Board is made up of nine­teen Board mem­bers: (1) five elec­ted by the com­munity, (2) sev­en appoin­ted by Scot­tish Min­is­ters, and (3) sev­en appoin­ted fol­low­ing nom­in­a­tions by the Loc­al Authorities.

The Board is led by the Con­vener and Deputy Con­vener. Mem­bers in 2025⁄26 from each of these three appoint­ment routes are:

Board mem­bers (1) Kenny Deans (ward 1) Paul Gibb (ward 5) John Kirk (ward 3) Lauren Mac­Cal­lum (ward 2) Elean­or Mack­in­tosh (ward 4), Deputy Convener

Page 4 of 122

(2) Sandy Brem­ner, Con­vener Jack­ie Brier­ton Peter Cos­grove Han­nah Grist Dr Fiona McLean Steve Mickle­wright Duncan Miller

(3) Chris Beat­tie (Angus) (resigned 13/06/2025) Geva Black­ett (Aber­deen­shire) Rus­sell Jones (High­land) Bill Lob­ban (High­land) Ian McLar­en (Angus) (appoin­ted 22/09/2025) Anne Ross (Aber­deen­shire) Derek Ross (Moray) Michael Wil­li­ams (Perth & Kinross)

The Board agrees the over­all dir­ec­tion of the Author­ity and over­sees the work of the Chief Exec­ut­ive and Nation­al Park staff. The exec­ut­ive man­age­ment of the Author­ity is under­taken by an Exec­ut­ive team com­pris­ing the Chief Exec­ut­ive and three Directors.

Chief Exec­ut­ive and Account­able Officer Grant Moir

Dir­ect­ors Dav­id Camer­on — Cor­por­ate Ser­vices and Deputy Chief Exec­ut­ive Officer Andy Ford — Nature and Cli­mate Gav­in Miles – Plan­ning and Place

Page 5 of 122

1.2 Chief Executive’s Forward

It is my pleas­ure to present the Cairngorms Nation­al Park Authority’s Annu­al Report and Accounts, cov­er­ing the year from 1 April 2025 to 31 March 2026.

From the approv­al of our pion­eer­ing new fire byelaw to major devel­op­ments in our Cairngorms 2030 pro­gramme and excit­ing pro­gress in our con­ser­va­tion work, it’s been a busy time at the Park Authority.

The byelaw is one of a range of meas­ures we are work­ing on with part­ners to mit­ig­ate the grow­ing risk of wild­fire to com­munit­ies, land­scapes and wild­life across the Nation­al Park. It was developed fol­low­ing extens­ive pub­lic con­sulta­tion and Scot­tish Government’s approv­al in Septem­ber 2025 was a sig­ni­fic­ant mile­stone, pav­ing the way for its intro­duc­tion in April 2026.

Cairngorms 2030’s second full year of deliv­ery was inspir­a­tion­al to say the least. This ambi­tious £42 mil­lion pro­gramme, span­ning 20 pro­jects, aims for the Cairngorms to become the UK’s first net zero nation­al park. With over 90 part­ners involved, it’s incred­ibly reward­ing to see how it’s progressing.

The 2025⁄26 fig­ures for Cairngorms 2030 speak for them­selves: 475 hec­tares of nat­ive wood­land were planted; over 1,800 hec­tares of peat­land are now on the road to recov­ery; more than 2,000 people engaged in our com­munity events; and new school ​‘bike buses’ gave around 70 chil­dren a taste of act­ive travel. Along­side that, a pan­el of people with a pas­sion for the Nation­al Park were recruited to design a new £1m com­munity fund from the ground up. Cairngorms 2030 is sup­por­ted by The Nation­al Lot­tery Her­it­age Fund, with thanks to play­ers of the Nation­al Lottery.

With 25 per cent of the UK’s most threatened spe­cies liv­ing in the Nation­al Park, it is one of the most sig­ni­fic­ant places for nature con­ser­va­tion. The past year saw some not­able pro­gress in our work to pro­tect the icon­ic caper­cail­lie, fresh­wa­ter pearl mus­sel and nar­row-headed ant, bolstered by a £1.2m grant from Scot­tish Government’s Nature Res­tor­a­tion Fund. The invest­ment has also gone towards a catch­ment resi­li­ence strategy for the River Dee and improv­ing tree stock for aspen and nat­ive mont­ane species.

There has been sig­ni­fic­ant pro­gress on the devel­op­ment of the next Loc­al Devel­op­ment Plan with a call for sites and ideas con­sulta­tion and the submission

Page 6 of 122

of the Evid­ence Report to the Report­ers Unit. At the same time the Plan­ning Com­mit­tee has approved a range of devel­op­ments across the Nation­al Park.

At a nation­al level, the passing of the Nat­ur­al Envir­on­ment (Scot­land) Act is a mile­stone for Nation­al Parks in Scot­land. It mod­ern­ises the aims and powers of Scotland’s Nation­al Park Author­it­ies and provides a renewed con­text for the devel­op­ment of the 2027 – 32 Nation­al Park Part­ner­ship Plan that we are focus­sing on devel­op­ing with part­ners over the course of the next year.

We look for­ward to con­tinu­ing to work closely with part­ner organ­isa­tions, com­munit­ies and busi­nesses to look after this pre­cious Nation­al Park for gen­er­a­tions to come.

Grant Moir Chief Exec­ut­ive and Account­able Officer 09 Octo­ber 2026

Page 7 of 122

1.3 The Park Authority

The Cairngorms Nation­al Park is the largest Nation­al Park in the United King­dom and cov­ers 4,525 square kilo­metres, twice the size of Loch Lomond and the Trossachs and 40% lar­ger than the Lake District.

The Park Author­ity is a Non-Depart­ment­al Pub­lic Body sponsored by the Envir­on­ment and Forestry Dir­ect­or­ate, Nat­ur­al Resources Divi­sion, Scot­tish Gov­ern­ment, estab­lished under the Nation­al Parks (Scot­land) Act 2000 with the pur­pose of being a mod­el of sus­tain­able devel­op­ment work­ing towards achiev­ing four stat­utory aims:

  • to con­serve and enhance the nat­ur­al and cul­tur­al her­it­age of the area
  • to pro­mote sus­tain­able use of the nat­ur­al resources of the area
  • to pro­mote under­stand­ing and enjoy­ment (includ­ing enjoy­ment in the form of recre­ation) of the spe­cial qual­it­ies of the area by the pub­lic, and
  • to pro­mote sus­tain­able eco­nom­ic and social devel­op­ment of the area’s communities.

Strategy and busi­ness model The Park Author­ity has a key role in lead­ing the deliv­ery of the Cairngorms Nation­al Park Part­ner­ship Plan (NPPP). The Plan sets the con­text for close co-oper­a­tion and part­ner­ship across pub­lic, private, and vol­un­tary organ­isa­tions in the Park, towards an agreed set of shared pri­or­ity object­ives. The Nation­al Park Part­ner­ship Plan sets out the long-term out­comes for the Park and provides the over­all guide for stra­tegic align­ment between pub­lic agen­cies, private com­pan­ies and com­munity organ­isa­tions with­in the Park who are sig­nat­or­ies to, and part­ners in, deliv­ery of the Cairngorms NPPP. The cur­rent NPPP spans the 5 years from 2022 to 2027; it was approved by the Park Authority’s Board in June 2022 and by Scot­tish min­is­ters in August 2022.

The Park Authority’s Cor­por­ate Plan is derived from the NPPP 2022 – 27. The Cor­por­ate Plan for the peri­od 2023 – 27 was approved by the Board at its meet­ing on 24 March 2023, and by Scot­tish Min­is­ters on 29 June 2023. In the wider Scot­tish con­text, the Park Author­ity will also work on ensur­ing great­er stra­tegic align­ment to ensure deliv­ery of key nation­al strategies, such as cur­rent and future Pro­grammes for Gov­ern­ment, Pub­lic Ser­vice Reform Strategy, and oth­er rel­ev­ant nation­al strategies.

Page 8 of 122

Our stra­tegic work includes being an act­ive mem­ber of the Envir­on­ment and Eco­nomy Lead­ers’ Group, togeth­er with input to a range of nation­al lead­er­ship and stake­hold­er groups.

Our com­mit­ment Our vis­ion, mis­sion state­ment and prin­ciples, are led by our Board and staff, and are cent­ral to our pur­pose and stra­tegic context:

Our vis­ion – an out­stand­ing Nation­al Park, enjoyed and val­ued by every­one, where nature and people thrive together.

Our mis­sion – to lead the way in deliv­er­ing for the Cairngorms Nation­al Park by bring­ing people togeth­er towards a com­mon pur­pose, enhan­cing the Park for every­one and inspir­ing new gen­er­a­tions to be Park Champions.

Our prin­ciples – the Park Authority’s prin­ciples are:

  • Pas­sion and dedication
  • Com­munity
  • Pion­eer­ing
  • Inspir­ing leadership

Our cul­ture – to be the best small pub­lic body in Scotland.

We aspire to be the best small pub­lic body in Scot­land. Our staff sur­vey res­ults, under­taken every two years through ​“The Best Com­pan­ies Sur­vey”, have shown that we are a people-ori­ented organ­isa­tion per­form­ing well. We are lis­ted amongst the Top 100 Not for Profit Organ­isa­tions in the UK.

We will con­tin­ue to build on our Organ­isa­tion­al Devel­op­ment Strategy to embed a high-per­form­ance, high-achiev­ing and high-qual­ity cul­ture that is focused on its staff, our organ­isa­tion­al prin­ciples, and on equal­it­ies. The Park Author­ity will con­tin­ue to be innov­at­ive and quick to act and will empower staff to deliv­er the strategies put in place by our Board.

Aims and objectives The Park Authority’s object­ives for the year were formed around the themes of Nature & Cli­mate, People, and Place:

Page 9 of 122

Nature & climate Wood­land expan­sion Peat­land res­tor­a­tion Nature restoration:

  • fresh­wa­ter restoration
  • rap­tor conservation
  • caper­cail­lie conservation
  • re-intro­duc­tion of species

People Cre­ation of paths and long-dis­tance routes Pro­vi­sion of ranger ser­vices Improve­ment of vis­it­or infra­struc­ture For­mu­lat­ing approaches to act­ive travel

Place Mon­it­or­ing the Cairngorms Loc­al Devel­op­ment Plan Deliv­er­ing hous­ing Con­trib­ut­ing to the devel­op­ment of the well­being eco­nomy plan Cre­ation of a sus­tain­able tour­ism action plan

In addi­tion to deliv­ery of our estab­lished object­ives, we con­tin­ue to give stra­tegic focus to our work towards a sus­tain­able, nature-based eco­nomy in the Cairngorms, while at the same time, deliv­er­ing urgent action to address cli­mate change.

Per­form­ance against these object­ives was strong. 475 hec­tares of nat­ive wood­land were planted; over 1,800 hec­tares of peat­land are restored. With fin­an­cial sup­port from Scot­tish Government’s Nature Res­tor­a­tion Fund, we made sig­ni­fic­ant pro­gress in our work to pro­tect the caper­cail­lie, fresh­wa­ter pearl mus­sel and nar­row-headed ant. The invest­ment also sup­por­ted the devel­op­ment of a catch­ment resi­li­ence strategy for the River Dee and the improve­ment of tree stock for aspen and nat­ive mont­ane spe­cies. Beavers, intro­duced to the Park dur­ing 2023, con­tin­ue to thrive.

A new and pion­eer­ing fire byelaw was approved dur­ing the year. Sub­stan­tial path works were car­ried out, and ranger ser­vices were act­ive sup­port­ing vis­it­ors through­out the year. The ranger team was aug­men­ted by sea­son­al staff and appren­tices between April and October.

Page 10 of 122

Deliv­ery of the Cairngorms 2030 pro­gramme, fun­ded by the Nation­al Lot­tery Her­it­age Fund (NLHF), con­tin­ued into its second full year of activ­ity, with impress­ive deliv­ery across all of the pro­jects mak­ing up the programme.

Our plan­ning team were engaged with the devel­op­ment of the next Loc­al Devel­op­ment Plan and the sub­mis­sion of the Evid­ence Report to the Report­ers Unit.

Over­all, the Park Authority’s respons­ib­il­ity for funds under man­age­ment, primar­ily made avail­able by Scot­tish Gov­ern­ment, increased from £13.9m in 2024⁄25 to £17.7m in 2025⁄26.

Look­ing Forward This dynam­ic, respons­ive organ­isa­tion­al eth­os will con­tin­ue. The Park Author­ity will con­tin­ue to look at new ways of oper­at­ing that deliv­er our com­mit­ments in the cur­rent Nation­al Park Part­ner­ship Plan. This will include con­tinu­ing our suc­cess in look­ing for altern­at­ive fund­ing oppor­tun­it­ies, includ­ing applic­a­tions to funds such as the Nation­al Lot­tery Her­it­age Fund, and spon­sor­ship oppor­tun­it­ies. It also includes col­lab­or­at­ing with part­ners to deliv­er improved ser­vices. We con­tin­ue to strive for more effi­cient and sus­tain­able intern­al work­ing prac­tices through deliv­er­ing against our Organ­isa­tion­al Devel­op­ment Strategy.

Fund­ing for 2026⁄27 from Scot­tish Gov­ern­ment – grant-in-aid, fund­ing for peat­land res­tor­a­tion and for nature res­tor­a­tion — has increased by £0.676m over that awar­ded for 2025⁄26, allow­ing the Park Author­ity to expand its deliv­ery, par­tic­u­larly in respect of nature res­tor­a­tion and con­ser­va­tion. Over 2026⁄27, we will fur­ther build our capa­city to deliv­er peat­land res­tor­a­tion and, through this work, act on cli­mate change. The Sea­son­al Ranger Ser­vice will con­tin­ue for a sixth year, while we aug­ment this sup­port for vis­it­ors with cap­it­al invest­ment in vis­it­or infrastructure.

In 2023⁄24 we were awar­ded £10.8 mil­lion by the Nation­al Lot­tery Her­it­age Fund (NLHF) to deliv­er the Cairngorms 2030 Pro­gramme. This is a 5‑year pro­ject that will deliv­er £42m of activ­ity in the Park. Pro­jects cov­er con­ser­va­tion, rur­al regen­er­a­tion, access, and sus­tain­able trans­port, amongst oth­er areas of work. 2026⁄27 will be the third full year of the pro­ject, which com­menced in mid-Janu­ary of 2024, and will con­tin­ue until Janu­ary 2029.

Page 11 of 122

Our budget for the 2026⁄27 fin­an­cial year, approved by the Board in March 2026, provides total funds under man­age­ment for the year ahead of £21.3m: a fore­cast increase of £3.5m over that in 2025⁄26.

Per­form­ance monitoring The vari­ous aspects of the Park Authority’s per­form­ance – fin­an­cial, organ­isa­tion­al, and oper­a­tion­al — are repor­ted over the course of the year to the Authority’s Board and its sub-com­mit­tees. These reports are avail­able on our web­site Cairngorms | Meetings.

A graph­ic­al rep­res­ent­a­tion of the pro­gress made on the Authority’s aims (as recor­ded in the Nation­al Park Part­ner­ship Plan) is provided in the Per­form­ance Review sec­tion of this report (pages 44 – 46). The Red / Amber / Green (RAG) rat­ing describes the Park Authority’s assess­ment of how well deliv­ery is pro­gress­ing towards these tar­gets. A sum­mary of this per­form­ance by theme is shown below:

Object­iveDescrip­tionRAG rat­ing
Nature and climateWood­land expansionGreen
Peat­land restorationGreen
Nature res­tor­a­tionAmber
PeopleCre­ation of paths and long-dis­tance routesGreen
Pro­vi­sion of ranger servicesGreen
Improve­ment of vis­it­or infrastructureGreen
For­mu­lat­ing approaches to act­ive travelGreen
PlaceMon­it­or­ing the Cairngorms Loc­al Devel­op­ment PlanGreen
Deliv­er­ing housingAmber
Con­trib­ut­ing to the devel­op­ment of the well­being eco­nomy planGreen
Cre­ation of a sus­tain­able tour­ism action planGreen

Ongo­ing work to pro­gress deliv­ery includes:

  • Com­ple­tion of the Cairngorms Nature Index
  • Col­la­tion of data on gamebird releases and their impact
  • Com­munity wealth building
  • Invest­ment in access­ib­il­ity services

By the nature of the Park Authority’s role, in seek­ing to lead col­lab­or­at­ive effort to tackle the big issues for the Cairngorms, per­form­ance is rarely entirely controllable

Page 12 of 122

by the Park Author­ity. Rather, achieve­ment of object­ives requires effect­ive lead­er­ship and influ­en­cing, and col­lab­or­a­tion and engage­ment with our part­ners, com­bined with our dir­ect invest­ment of fin­ance and staff resources, to address our priorities.

Risk man­age­ment Risk man­age­ment, togeth­er with con­sid­er­a­tion of issues arising that may impact the deliv­ery of our stra­tegic cor­por­ate pri­or­it­ies, is cent­ral to our man­age­ment activ­it­ies with­in the Park Author­ity. The Man­age­ment Team reviews stra­tegic risks at least quarterly, and we have developed and embed­ded risk man­age­ment prac­tices, togeth­er with pro­ject man­age­ment pro­cesses, to take full cog­nis­ance of these core aspects of effect­ive organ­isa­tion­al and stra­tegic con­trol arrangements.

The Park Authority’s Stra­tegic Risk Man­age­ment Strategy and asso­ci­ated Stra­tegic Risk Register, in tan­dem with our cor­por­ate per­form­ance and mon­it­or­ing sys­tem, details the key issues and risks around deliv­ery of our Cor­por­ate Plan togeth­er with the stra­tegic object­ives and key per­form­ance indic­at­ors set out in that plan. The Board receives detailed reports and com­ments on key issues and risks twice annu­ally, with the Board’s Audit and Risk Com­mit­tee review­ing stra­tegic risk man­age­ment between these Board meetings.

Sig­ni­fic­ant pro­jects also have their own embed­ded risk registers and risk mit­ig­a­tion plans, for example, we have estab­lished sep­ar­ate risk registers to sup­port the deliv­ery of the Cairngorms 2030 Pro­gramme. More inform­a­tion on risk and intern­al con­trols can be found in the Gov­ernance State­ment with­in this doc­u­ment and in our Risk Man­age­ment Strategy.

The key risks faced by the Park Author­ity included:

  • Fin­an­cial resources: poten­tial con­straints arising from pres­sure on pub­lic sec­tor fin­ances; delay in the pro­vi­sion of match fund­ing to sup­port key aspects of our Cairngorms 2030 pro­gramme; dif­fi­culties in plan­ning future pro­grammes with­in the con­text of annu­al­ised budgets and poten­tial fin­an­cial con­straints. We con­tin­ue to liaise with Scot­tish Gov­ern­ment through our spon­sor­ship team and the Peat­land Action Team, high­light­ing our achieve­ments and align­ing our deliv­ery to the aims of the Gov­ern­ment. Our cor­por­ate plan is pri­or­it­ised around anti­cip­ated Scot­tish Gov­ern­ment budget alloc­a­tions and includes mit­ig­a­tion against expec­ted funding

Page 13 of 122

con­straints. We con­tin­ue to sup­port part­ners such as Cairngorms Nature and the Cairngorms Trust in secur­ing inward investment.

  • Oper­a­tion­al devel­op­ment: improve­ment of cor­por­ate sys­tems. There has been sig­ni­fic­ant organ­isa­tion­al change as a res­ult of the imple­ment­a­tion of new digit­al sys­tems. The organ­isa­tion has adap­ted well to these pos­it­ive changes.
  • Tech­nic­al issues: cyber-secur­ity issues with asso­ci­ated threats of fraud and theft. We carry out daily review of the Scot­tish Cyber Coordin­a­tion Centre threat sum­mar­ies and take appro­pri­ate fol­low-up action. Dur­ing the year we main­tained the stand­ards required for Cyber-secur­ity plus accred­it­a­tion and we con­tin­ued to devel­op the matur­ity of our secur­ity systems.
  • Repu­ta­tion­al issues: the good repu­ta­tion of the Author­ity as a found­a­tion for col­lab­or­a­tion with stake­hold­ers. We man­age stake­hold­er expect­a­tions through:
  • Tar­geted communications
  • Fur­ther devel­op­ment of stake­hold­er relationships.
  • Devel­op­ment / strength­en­ing of stra­tegic partnerships.
  • Ongo­ing assess­ment of oper­a­tion­al risk man­age­ment and mit­ig­a­tion in our communications.
  • Work­force man­age­ment: main­tain­ing a work­force that is suf­fi­ciently flex­ible to respond to chan­ging stra­tegic pri­or­it­ies and to changes in the scale of oper­a­tions. We have developed and updated our work­force man­age­ment strategy; intern­al con­sulta­tion on this pro­pos­al will inform the future deliv­ery of this strategy.

Page 14 of 122

PER­FORM­ANCE REPORT: PER­FORM­ANCE ANALYSIS

This sec­tion provides inform­a­tion on the per­form­ance of the organ­isa­tion over the year ended 31 March 2026, our aims and pri­or­it­ies, our achieve­ments and fin­an­cial results.

1.4 Stra­tegic Aims and Pri­or­it­ies 2025⁄26 and beyond

We con­trib­ute to deliv­ery of the long-term out­comes in the Cairngorms Nation­al Park Part­ner­ship Plan 2022 – 27 (NPPP) through work­ing to achieve our agreed Cor­por­ate Plan stra­tegic objectives.

Our stra­tegic aims and pri­or­it­ies are set out across the three themes of Nature and cli­mate, People, and Place. Each of these themes sets out a num­ber of pri­or­ity out­comes in line with the Cairngorms Nation­al Park Part­ner­ship Plan. Cor­por­ate Ser­vices and Com­mu­nic­a­tions sup­port the main themes and their out­comes. The Plan was approved by Scot­tish Min­is­ters in August 2022.

Nature – a car­bon neg­at­ive and biod­iversity rich Nation­al Park with bet­ter func­tion­ing, bet­ter con­nec­ted and more resi­li­ent eco­sys­tems. Out­comes:

  1. Moor­land is more diverse,
  2. Wood­land is expanding,
  3. Peat­lands are restored,
  4. Rivers are reconnected,
  5. Spe­cies are recovering,
  6. Farm­ing is car­bon neutral.

People – a well­being eco­nomy that works for all the people of the Cairngorms. Out­comes:

  1. Com­munit­ies are empowered,
  2. Well­being comes first,
  3. Green jobs are growing,
  4. The Cairngorms is a Park for All,
  5. Volun­teer­ing is on the rise,
  6. Young people stay and thrive.

Page 15 of 122

Place – a place that people want to live in, work in and vis­it that works for all. Out­comes:

  1. Hous­ing is more affordable,
  2. Trans­port is more sustainable,
  3. Com­munit­ies are connected,
  4. Vis­it­or facil­it­ies are first class,
  5. Cul­tur­al her­it­age is celebrated.

Sup­port themes The deliv­ery of these themes and pri­or­it­ies is sup­por­ted by the Com­mu­nic­a­tions and Cor­por­ate Ser­vices teams. Our Com­mu­nic­a­tions team works with vis­it­ors, com­munit­ies, and stake­hold­ers to raise the pro­file of the Park and cre­ate a con­nec­tion and com­mit­ment to care for it. Our Cor­por­ate Ser­vices team ensures the deliv­ery of effect­ive, effi­cient, and sus­tain­able ser­vices in addi­tion to pro­mot­ing the highest stand­ards of gov­ernance, both with­in the Park Author­ity itself and also in work­ing with com­munity and vol­un­tary organ­isa­tions involved in deliv­ery of NPPP priorities.

Cor­por­ate services The aim of the Cor­por­ate Ser­vices team is to deliv­er effect­ive, effi­cient, and sus­tain­able ser­vices, pro­mot­ing the highest stand­ards of gov­ernance to sup­port deliv­ery of the Cor­por­ate Plan and Cairngorms Nation­al Park Part­ner­ship Plan by the Park Author­ity and our com­munity and char­ity part­ners. We also play an act­ive role in the Envir­on­ment and Eco­nomy Lead­ers’ Group.

Pri­or­it­ies:

  • Imple­ment the Organ­isa­tion­al Devel­op­ment Strategy and embed the organ­isa­tion­al and cul­tur­al improve­ments to make the Park author­ity the best small pub­lic body in Scotland.
  • Ensure that our accom­mod­a­tion and its infra­struc­ture sup­port the deliv­ery of the Organ­isa­tion­al Devel­op­ment Strategy.
  • Deliv­er ongo­ing ser­vice improve­ment, includ­ing the devel­op­ment of appro­pri­ate shared ser­vices, to the Park Author­ity, oth­er pub­lic bod­ies and the com­munity and char­it­able organ­isa­tions we support.
  • Pro­mote and sup­port the highest stand­ards of gov­ernance and man­age­ment, includ­ing equal­it­ies actions, with­in the Park Author­ity, oth­er pub­lic bod­ies and the com­munity and char­it­able organ­isa­tions we support.

Page 16 of 122

  • Sup­port and con­trib­ute to Scot­tish Gov­ern­ment stra­tegic deliv­ery, includ­ing on Pub­lic Ser­vice Reform and long-term resource planning.

Com­mu­nic­a­tions and engagement Com­mu­nic­at­ing with a wide range of stake­hold­ers – from loc­al res­id­ents to vis­it­ors, busi­nesses and land man­agers – is vital for the work of the Park Author­ity. It sup­ports the work being under­taken across the organ­isa­tion to deliv­er on the Nature and cli­mate, People, and Place pri­or­it­ies out­lined in our Nation­al Park Part­ner­ship Plan. Our role is to raise the pro­file of the Nation­al Park and cre­ate mean­ing­ful con­nec­tions between key audi­ences and the land­scape of the Cairngorms. We are seek­ing to build a com­munity of people who act­ively sup­port and care for the Nation­al Park and who bene­fit from doing so.

Pri­or­it­ies:

  • Deliv­er the Com­mu­nic­a­tion and Engage­ment Strategy and increase aware­ness, engage­ment and involve­ment with the Nation­al Park.
  • Coordin­ate engage­ment for our Cairngorms 2030 pro­gramme and tell the story as it pro­gresses, help­ing stake­hold­ers see their role in tack­ling the nature and cli­mate crises.
  • Ensure high-qual­ity intern­al com­mu­nic­a­tions that help deliv­er the key pri­or­it­ies of the Cor­por­ate Plan.
  • Cel­eb­rate a diverse range of per­spect­ives and exper­i­ences in our com­mu­nic­a­tions, help­ing the Cairngorms become a ​‘Park for All’ where every­one is welcome.

Page 17 of 122

1.5 Key Issues and Risks

Stra­tegic delivery Deliv­ery of the Nation­al Park Part­ner­ship Plan will test the poten­tial for enhanced approaches to con­ser­va­tion and the pro­tec­tion of endangered spe­cies. Unreal­ist­ic expect­a­tions of what the Park Author­ity and its part­ners can achieve in the face of the sig­ni­fic­ant risks presen­ted by cli­mate change, spe­cies extinc­tion, flood man­age­ment and fire are being man­aged through com­mu­nic­a­tion and collaboration.

Fin­an­cial resources The Scot­tish Government’s con­tin­ued con­cerns over future years’ fund­ing levels con­tin­ues to be a key risk for the Park Author­ity. While we acknow­ledge that con­straints on pub­lic sec­tor fin­ances may restrict our capa­city to alloc­ate suf­fi­cient resources to deliv­er the cor­por­ate plan and may also affect the avail­ab­il­ity of part­ner­ship fund­ing for shared activ­it­ies, the favour­able fund­ing alloc­a­tions awar­ded for 2026⁄27 give cause for optim­ism that we have a secure basis for deliv­ery through the remainder of the cur­rent Cor­por­ate Plan to March 2027 and beyond.

Human resources Deliv­ery of extern­ally fun­ded pro­jects has become an intrins­ic part of our oper­a­tion­al plan­ning so that we main­tain the capa­city of the organ­isa­tion to achieve pro­ject out­comes, while work­ing in an increas­ingly com­pet­it­ive and restric­ted recruit­ment cli­mate. These pro­jects are enabling the Park Author­ity to extend its influ­ence by tak­ing on new types of work. The Author­ity is work­ing to improve the know­ledge and skills of col­leagues con­trib­ut­ing to these new activ­it­ies. Pay pres­sures are being man­aged in line with Scot­tish Gov­ern­ment policy, and in col­lab­or­a­tion with staff and unions.

We recog­nise that the Authority’s increas­ing breadth of activ­ity and range of extern­al fin­ance carry a stra­tegic risk that future organ­isa­tion­al work­force require­ments will be sig­ni­fic­antly dif­fer­ent to the struc­ture that is cur­rently in place. A revised work­force man­age­ment strategy has been developed to guide the man­age­ment and evol­u­tion of our staff group over the com­ing years.

Page 18 of 122

Tech­nic­al issues The Author­ity recog­nises its depend­ency on inform­a­tion tech­no­logy for effect­ive and effi­cient oper­a­tions. The incid­ence of cyber­crime increases the need for invest­ment in both secur­ity meas­ures and resourcing of IT ser­vices. Busi­ness con­tinu­ity plan­ning remains a focus.

Repu­ta­tion The Park Author­ity acknow­ledges the import­ance of its rela­tion­ships with stake­hold­ers. Much of the Authority’s work is car­ried out in part­ner­ship with organ­isa­tions and com­munit­ies with­in the Park and the good repu­ta­tion of the Author­ity is a found­a­tion for this col­lab­or­a­tion. Our com­mu­nic­a­tions strategy and plans are developed to man­age the sens­it­iv­ity and nuances of our rela­tion­ships as these impact our repu­ta­tion. An oper­a­tion­al risk register focused on our repu­ta­tion and com­mu­nic­a­tion risks sup­ports our effect­ive man­age­ment of the repu­ta­tion and risk asso­ci­ated with this work.

1.6 Fin­an­cial Per­form­ance Summary

This sec­tion provides a sum­mary of the Park Authority’s fin­an­cial per­form­ance for the year against the Board approved budget and grant-in-aid awar­ded by the Scot­tish Government.

The Park Author­ity is expec­ted to man­age its budget in accord­ance with the Frame­work Agree­ment made with Scot­tish Gov­ern­ment, and the Scot­tish Pub­lic Fin­ance Manu­als, and to deliv­er an out­turn for the fin­an­cial year with­in Scot­tish Government’s budget lim­its. The com­ment­ary and tables below show how the budgets agreed by the Board have been applied dur­ing the year with com­par­is­ons to pre­vi­ous years’ income and expenditure.

Income The main source of our fund­ing for the year was grant-in-aid fund­ing from our spon­sor­ing body, the Envir­on­ment and Forestry Dir­ect­or­ate, Nat­ur­al Resources Divi­sion, of the Scot­tish Government.

We also acted as Account­able Body for the Nation­al Lot­tery Her­it­age Fund (NLHF) sup­port­ing sig­ni­fic­ant ongo­ing pro­jects: the deliv­ery phase of the Frame­work which com­pleted in June 2024, and the deliv­ery phase of Cairngorms 2030 where work began in Janu­ary 2024.

Page 19 of 122

The grant-in-aid set­tle­ment rep­res­ents an agreed budget with our spon­sor­ing depart­ment with an agreed level of fund­ing sup­port rep­res­ent­ing the Park Authority’s alloc­a­tions of Depart­ment­al Expendit­ure Lim­its (DEL), which cov­ers all expendit­ure net of income from all oth­er sources. DEL is fur­ther split between cash alloc­a­tions to meet oper­a­tion­al cost (resource or RDEL), cap­it­al expendit­ure (cap­it­al or CDEL) and non-cash alloc­a­tions. The non-cash alloc­a­tion cov­ers depre­ci­ation and impair­ment of non-cur­rent assets (cap­it­al­ised tan­gible and intan­gible assets), togeth­er with right-of-use assets (rent­al prop­er­ties, leased vehicles and leased office equip­ment) car­ried in the State­ment of Fin­an­cial Pos­i­tion at the year end.

The grant-in-aid set­tle­ment for 2025⁄26 (includ­ing fund­ing for peat­land res­tor­a­tion and from the Nature Res­tor­a­tion Fund) was again favour­able and increased in total by £3.1m. The resource alloc­a­tion increased by £1.5m, while cap­it­al increased by £1.6m. A suc­cess­ful year’s peat­land res­tor­a­tion pro­gramme cost less than anti­cip­ated, and the Peat­land cap­it­al grant drawn down in the year was vol­un­tar­ily reduced by £0.360m at the Spring Budget Revi­sion (SBR); in addi­tion, £0.137m of fund­ing for peat­land res­tor­a­tion, which was drawn down but not required has been deferred and will be applied as advance fund­ing for the 2026⁄27 res­tor­a­tion programme.

The fol­low­ing income and expendit­ure account provides a sum­mary of our actu­al fin­an­cial per­form­ance, cash, and non-cash, for the year against the final budget approved by the Board on 28 March 2025.

Page 20 of 122

Income and expenditure

Out­turn £’000Budget £’000Vari­ance £’000
Income
Grant-in-aid Resource funding8,1417,916225
Grant-in-aid Resource fund­ing peatland6506500
Grant-in-aid Cap­it­al fund­ing general1,7501,7500
Grant-in-aid Cap­it­al fund­ing peat­land recovery3,4833,000483
Grant-in-aid Cap­it­al fund­ing nature recovery1,195220975
Grant from spon­sor­ing department15,21913,5361,683
Com­munity Led Loc­al Devel­op­ment (CLLD)3523502
Cairngorms 2030*1,6454,078(2,433)
Oth­er oper­a­tion­al income324158166
Total oth­er gen­er­ated income**2,3214,586(2,265)
Total income17,54018,122(582)
Expendit­ure
Staff and Board costs***(7,399)(7,378)(21)
Run­ning costs(1,125)(975)(150)
Oper­a­tion­al plan delivery(2,282)(3,254)972
Peat­land restoration(3,514)(3,020)(494)
Nature Res­tor­a­tion(1,195)(220)(975)
Cairngorms 2030*(1,425)(2,973)1,548
Com­munity Led Loc­al Devel­op­ment (CLLD)(290)(280)(10)
Depre­ci­ation (non-cash)(340)(350)10
Total oper­at­ing expenditure(17,570)(18,450)880
Net oper­at­ing expenditure(30)(328)298
Fin­ance expendit­ure (interest on leases)(30)-(30)
Fin­ance income14110041
Sur­plus trans­ferred to state­ment of tax­pay­ers’ equity81(228)309
Cap­it­al assets purchased(236)(108)(128)
Pay­ments to decrease lease liability(194)-(194)
Less depre­ci­ation (non-cash)340350(10)
Out­turn vs budget presen­ted to Board(9)14(23)

* budget includes the Park Authority’s con­tri­bu­tion to the Cairngorms 2030 pro­gramme ** includes pro­ject staff costs recovered *** includes pro­ject staff costs

Page 21 of 122

Oper­at­ing income Income from all oth­er sources, includ­ing part­ner fund­ing, was £0.668m high­er than that received in 2024⁄25. Of this, £0.548 was attrib­ut­able to a year-on-year increase in pro­ject income (includ­ing staff costs recovered) from NLHF.

Over­all total income has increased by 70% over the five years since 2021⁄22; grant-in-aid has also increased by 70%, as is shown in the graph below.

Total income 5 years to 2025⁄26 Chart data: Years 21⁄22, 22⁄23, 23⁄24, 24⁄25, 25⁄26 Val­ues (Grant in aid): 12,000, 13,000, 14,000, 15,000, 16,000 Val­ues (oth­er sources of income): 2,000, 3,000, 4,000, 5,000, 6,000

The sources of oth­er gen­er­ated income are vari­able depend­ing on the stages of pro­gress of ongo­ing pro­jects dur­ing a fin­an­cial year, and changes to the emphas­is and object­ives in the cor­por­ate plan. For the five years since 2021⁄22, the split of the income, includ­ing com­pleted pro­jects, sig­ni­fic­ant ongo­ing pro­jects and oper­a­tion­al plan activ­ity is shown below.

Oper­at­ing income 5 years to 2025⁄26 Chart Data: Cairngorms 2030: 21⁄22: 0 22⁄23: 0 23⁄24: 0 24⁄25: 0 25⁄26: ~1600 CLLD: 21⁄22: 0 22⁄23: ~350 23⁄24: ~350 24⁄25: ~350 25⁄26: ~350 Staff costs recovered: 21⁄22: ~200 22⁄23: ~500 23⁄24: ~1000 24⁄25: ~2600 25⁄26: ~1400 Oper­a­tion­al plan: 21⁄22: ~5000 22⁄23: ~4000 23⁄24: ~3500 24⁄25: ~1500 25⁄26: ~2100 Cairngorms Caper­cail­lie: 21⁄22: ~500 22⁄23: ~1500 23⁄24: ~2500 24⁄25: ~300 25⁄26: ~200 LEAD­ER: 21⁄22: ~1000 22⁄23: 0 23⁄24: 0 24⁄25: 0 25⁄26: 0 Great Place Badenoch: 21⁄22: ~1000 22⁄23: 0 23⁄24: 0 24⁄25: 0 25⁄26: 0

Page 22 of 122

Between 2021⁄22 and 2024⁄25 Income from oper­a­tion­al plan activ­it­ies reduced con­sist­ently, reflect­ing the change in emphas­is from short-term invest­ment towards sig­ni­fic­ant ongo­ing pro­jects sup­por­ted by the Nation­al Lot­tery Her­it­age Fund, and the realign­ment of oper­a­tion­al plan object­ives as the Author­ity moved towards Cairngorms 2030. To an extent, it also reflec­ted the reduc­tion in fund­ing avail­able from oth­er pub­lic sec­tor bod­ies, or bod­ies fun­ded by cent­ral gov­ern­ment. This year, how­ever, the Park Author­ity is grate­ful to have received spon­sor­ship in sup­port of its nature and cli­mate delivery.

The LEAD­ER pro­gramme was replaced in 2022⁄23 by the Scot­tish Gov­ern­ment fun­ded Com­munity Led Loc­al Devel­op­ment (CLLD) pro­gramme. The Tomin­toul & Glen­liv­et Land­scape Part­ner­ship closed in 2021⁄22 with a five-year man­age­ment and main­ten­ance (M&M) peri­od set to end in early 2026⁄27. Once the M&M funds set aside at the end of the pro­ject have been spent, no fur­ther fund­ing will be avail­able. The deliv­ery phase of the Cairngorms Caper­cail­lie pro­ject was com­pleted halfway through 2024⁄25. The deliv­ery phase of the Cairngorms 2030 pro­ject com­menced in mid-Janu­ary 2024 with only staff costs incurred to the end of the 2023⁄24 fin­an­cial year. Costs incurred in 2024⁄25 and 2025⁄26 reflect the com­ple­tion of two full years of the 5‑year project.

Oper­at­ing expenditure Over­all, the increase in income is matched by an increase in expendit­ure, irre­spect­ive of source.

Total expendit­ure 5 years to 25⁄26 Chart data: Years 21⁄22, 22⁄23, 23⁄24, 24⁄25, 25⁄26 Val­ues: 10,000, 12,000, 14,000, 16,000, 18,000

Page 23 of 122

Staff costs, includ­ing Board fees, net of recov­er­ies, accoun­ted for 40.0% of total income (2024÷25 44.3%). As a per­cent­age of the grant-in-aid received this was 46.5% (2024÷25 50.9%).

By agree­ment, the Peat­land grant-in-aid was reduced in year by £0.360m, and we ended under­spent on the reduced grant awar­ded by £0.137m. 18 pro­jects were sup­por­ted in 2025⁄26, with an estim­ated 1,800 hec­tares of peat­land brought into res­tor­a­tion, against a tar­get for the year of 1,400ha.

Non-cash A non-cash budget of £0.350m was alloc­ated by Scot­tish Gov­ern­ment for 2025⁄26 (2024÷25 £0.352m) to cov­er depre­ci­ation of cap­it­al­ised intan­gible and tan­gible assets, and right-of-use assets; depre­ci­ation charged to the SoCNE totalled £0.340m for the year.

Expendit­ure 5 years to 2025⁄26 Chart Data (all val­ues approx­im­ate, see chart): | | 21⁄22 | 22⁄23 | 23⁄24 | 24⁄25 | 25⁄26 | | — -| — -| — -| — -| — -| — -| | Board and staff costs | 3000 | 4500 | 5000 | 7000 | 7000 | | Peat­land recov­ery | 2000 | 3000 | 3000 | 4000 | 3500 | | Oper­a­tion­al plan | 3000 | 4000 | 3500 | 3500 | 2500 | | Cairngorms 2030 | 0 | 0 | 0 | 500 | 1500 | | Run­ning costs | 1000 | 1000 | 1000 | 1000 | 1000 | | CLLD | 0 | 300 | 300 | 300 | 300 | | Tomin­toul & Glen­liv­et LP | 500 | 0 | 0 | 0 | 0 | | Cairngorms Caper­cail­lie | 0 | 500 | 1000 | 200 | 0 | | LEAD­ER | 500 | 0 | 0 | 0 | 0 | | Great Place Badenoch | 500 | 0 | 0 | 0 | 0 |

Page 24 of 122

Trans­fer to / from Taxpayer’s funds We are trans­fer­ring £0.081m to Taxpayer’s equity for the year (24÷25: trans­fer from Taxpayer’s equity £0.110m) as sum­mar­ised in the table below.

£’000
Total cash grant-in-aid received15,219
Less net expenditure(14,798)
Net sur­plus before non-cash allocation421
Less depre­ci­ation (non-cash)(340)
Trans­fer for the year to Tax­pay­ers’ Equity81

As shown below, the out­turn for the year is a net over­spend before depre­ci­ation (non-cash) of £9,000, equi­val­ent to (0.06)% of grant-in-aid received, which lies with­in the para­met­ers of our Key Per­form­ance Indic­at­or for annu­al expendit­ure (over­spend of no more than 1%; under­spend of no more than 2%).

£’000Per­cent­age of grant-in-aid
Total cash grant-in-aid received15,219
Less net expenditure(14,798)
Less cap­it­al purchases(236)
Less decrease in cap­it­al ele­ment of lease liab­il­ity (IFRS 16)(194)
Out­turn (net defi­cit) for the year(9)(0.06)%

Changes in non-cur­rent assets Move­ments in non-cur­rent assets are shown in Notes 9,10 and 11.

Char­it­able donations There were no char­it­able dona­tions made in the year or in the pre­vi­ous year.

Rela­tion­ship with sup­pli­ers and partners Our sup­pli­er pay­ment policy observes the Bet­ter Pay­ment Prac­tice Code which seeks to pay sup­pli­ers with­in 10 days of receipt of a val­id invoice in accord­ance with Scot­tish Gov­ern­ment tar­gets. Dur­ing the year to 31 March 2026, the time taken to pay cred­it­ors achieved an aver­age of 22 days (2024÷25: 10 days), with 49.3% (2024÷25: 66.40%) of pay­ments being made with­in the tar­get timescale.

The sig­ni­fic­ant change in this fig­ure year-on-year is primar­ily attrib­uted to the imple­ment­a­tion of new sys­tems with­in the Author­ity. These sys­tems are expected

Page 25 of 122

to decrease the aver­age time taken to pay cred­it­ors once fully embed­ded as well as redu­cing fraud risk for the Author­ity and its suppliers.

Anti-bribery and corruption The Park Author­ity has adop­ted a zero-tol­er­ance policy against fraud, bribery and cor­rup­tion, reflec­ted in clear policies on con­duct expec­ted from staff and on hos­pit­al­ity. There were no reports of fraud dur­ing the year or pre­vi­ous year.

Min­is­teri­al Direction There were no min­is­teri­al dir­ec­tions received from Scot­tish Gov­ern­ment in 2025⁄26.

1.7 Oper­at­ing Per­form­ance Summary

As set out in the pre­lim­in­ary sec­tions of this report, the Park Author­ity has made sig­ni­fic­ant, pos­it­ive pro­gress in the real­isa­tion of our stra­tegic object­ives in this first year of the four-year Cor­por­ate Plan for 2023 – 2027.

The Park Authority’s Board receives quarterly updates from the Chief Exec­ut­ive on activ­it­ies and per­form­ance. All reports are avail­able as down­load­able doc­u­ments on the Park Authority’s web­site. All quarterly update reports are pub­lished on our web­site to allow ongo­ing, open pub­lic aware­ness of the work of the Park Author­ity. We have dis­tilled the key high­lights and out­stand­ing issues in the deliv­ery of our stra­tegic aims in the fol­low­ing sec­tions of this Annu­al Report.

2025⁄26 Activ­ity Highlights Land man­age­ment, nature and climate

Peat­land res­tor­a­tion — Dur­ing 2025⁄26, the Peat­land team delivered res­tor­a­tion activ­ity across 18 pro­jects with­in the Park, bring­ing over 1800 hec­tares of peat­land under res­tor­a­tion between 1 April 2025 and 31 March 2026.

Along­side deliv­ery on the ground, work has pro­gressed on multi-year res­tor­a­tion plan­ning for sev­er­al large estates, help­ing to estab­lish a stronger and more reli­able pipeline of pro­jects for future years.

The cur­rent focus is on pro­ject design and ten­der­ing for schemes with­in the 2025⁄26 deliv­ery pipeline. Increased capa­city with­in the Peat­land ACTION team has sup­por­ted the devel­op­ment of these longer-term plans, while grant fund­ing is

Page 26 of 122

also being dir­ec­ted towards third-party devel­op­ment work. Togeth­er, these meas­ures are inten­ded to sup­port a more stra­tegic approach, strengthen private sec­tor capa­city, and make best use of Park Author­ity staff resources.

To date, 10 devel­op­ment grants have been awar­ded to sup­port the design of around 2,538 hec­tares of future res­tor­a­tion, and the team remains on track to deliv­er 10 multi-year plans, with this phase of work expec­ted to con­clude by the end of May 2026.

Deer and herb­i­vore impacts — Dur­ing 2024⁄25, the Park Author­ity piloted a ven­ison sub­sidy scheme to encour­age increased culls in parts of the Nation­al Park with the highest deer dens­it­ies. Cull tar­gets in these areas were achieved and pop­u­la­tions reduced. NatureScot also tri­alled com­par­able incent­ive schemes in two fur­ther pilot areas, focused on roe deer in Cent­ral Scot­land and sika on the south-east side of Loch Ness. Build­ing on this exper­i­ence, a sim­il­ar scheme was delivered dur­ing the 2025⁄26 red deer hind sea­son, with incent­ive levels and cull tar­gets agreed with Deer Man­age­ment Groups

Gamebird man­age­ment — This year also saw pub­lic­a­tion of the first detailed assess­ment of gamebird release num­bers and dens­it­ies with­in the Nation­al Park. Pre­pared by the Game and Wild­life Con­ser­va­tion Trust, the report draws on Nation­al Gamebird Census data from 2000 to 2023 and inter­views with man­agers from 10 of the 22 estates believed to release gamebirds in the Park. Across the ten par­ti­cip­at­ing estates, the aver­age releases over the three most recent sea­sons since 2022 were 53,966 pheas­ants and 24,413 red-legged part­ridges. Estab­lish­ing this evid­ence base is an import­ant step in under­stand­ing both the pos­it­ive and neg­at­ive biod­iversity impacts of gamebird release in the Cairngorms. The report forms part of the Nation­al Park Part­ner­ship Plan com­mit­ment to estab­lish baseline data on release activ­ity and will form the basis of fur­ther study into the biod­iversity impacts of released gamebirds with­in the Cairngorms Nation­al Park.

Fire man­age­ment — Fire man­age­ment was a major focus dur­ing the year fol­low­ing the Dava wild­fire in late June, which affected around 10,000 hec­tares and was the largest wild­fire in recor­ded Scot­tish his­tory. More than 100 people

Page 27 of 122

from estates, farms and nature reserves were involved in tack­ling the fire. The Park Authority’s Grant­own office served as the Incid­ent Com­mand Headquar­ters for the Scot­tish Fire and Res­cue Ser­vice and also acted as a hub for com­munity sup­port and sup­plies dur­ing the response. The Park Author­ity fur­ther sup­por­ted min­is­teri­al and offi­cial vis­its to the site, includ­ing vis­its by the Min­is­ter for Agri­cul­ture and Con­nectiv­ity, the Dir­ect­or of Agri­cul­ture and Rur­al Eco­nomy, and the Muir­burn Code Work­ing Group.

In the after­math of the fire, the Park Author­ity provided fund­ing, admin­istered through Scot­tish Land and Estates, to help off­set the costs of dam­age to equip­ment and vehicles incurred by private sec­tor part­ners dur­ing the fire­fight­ing effort. The exper­i­ence has also rein­forced the import­ance of the Integ­rated Wild­fire Man­age­ment Plan, and staff have con­tin­ued to work with a num­ber of estates on devel­op­ing fire man­age­ment plans.

Cli­mate Adapt­a­tion Fund — The Cli­mate Adapt­a­tion Fund attrac­ted strong interest this year, with more than 60 expres­sions of interest and over 30 full applic­a­tions received.

Stra­tegic Land Man­age­ment Plans — Stra­tegic Land Man­age­ment Plans also saw strong engage­ment from landown­ers. Fund­ing avail­able through Cairngorms 2030 to Deer Man­age­ment Groups in the south of the Park was heav­ily over­sub­scribed, with more than 30 applic­a­tions request­ing a total of £3.2 mil­lion. Expres­sions of interest were assessed against the programme’s ambi­tions for innov­a­tion, trans­form­a­tion and col­lab­or­a­tion, as well as its wider aim of sup­port­ing land man­agers in address­ing the twin crises. Land Man­agers were provided with oppor­tun­it­ies to devel­op pro­pos­als into full pro­ject plans or, where appro­pri­ate, to pur­sue deliv­ery through altern­at­ive fund­ing routes.

Nature Res­tor­a­tion Fund — This year, sup­port from the Nature Res­tor­a­tion Fund of £1.2 mil­lion enabled strong pro­gress across the Cairngorms Nature Action Plan and the Caper­cail­lie Emer­gency Plan. Work­ing with 27 part­ners across 20 land­hold­ings, the Park Author­ity helped remove over 12,000 metres of deer fen­cing, expand wood­land graz­ing across more than 4,000 hec­tares of caper­cail­lie hab­it­at, carry out heath­er man­age­ment over 150 hec­tares, and expand diver­sion­ary feed­ing across 90% of land­hold­ings sup­port­ing female

Page 28 of 122

caper­cail­lie. The year also saw import­ant advances in wider spe­cies recov­ery and resi­li­ence to cli­mate change, includ­ing sup­port for aspen hab­it­at work, fresh­wa­ter pearl mus­sel plan­ning, suc­cess­ful devel­op­ment of wood ant and nar­row-headed ant breed­ing methods.

Rap­tors — This year brought an import­ant but con­cern­ing update on rap­tor con­ser­va­tion in the Nation­al Park. The per­eg­rine report, pub­lished in Novem­ber 2025, showed that breed­ing pairs have declined by 56% since 2002, with few­er than half of ter­rit­ori­al pairs suc­cess­fully fledging young in 2024. The find­ings high­light the scale of the chal­lenge and point to a com­bin­a­tion of pres­sures, includ­ing upland land man­age­ment prac­tices, reduced prey avail­ab­il­ity, wild­life crime and the recent impacts of avi­an flu.

Catch­ments — The catch­ments pro­gramme strengthened sig­ni­fic­antly over the year, with appoint­ment to the post of River Dee Catch­ment Pro­ject Officer in Novem­ber 2025 as part of the Pub­lic Ser­vice Reform pion­eer catch­ment pro­gramme. This work has helped build a more coordin­ated approach to deliv­er­ing envir­on­ment­al out­comes across the Dee catch­ment, while also sup­port­ing the Dee Resi­li­ence Group. Pro­gress was also made on longer-term resi­li­ence plan­ning through work with the River Dee Trust to devel­op a hydro­lo­gic­al mod­el of the upper catch­ment, help­ing identi­fy where nature-based solu­tions can have the greatest effect in improv­ing drought and flood resilience.

Beavers – the beaver pop­u­la­tion con­tin­ued to make encour­aging pro­gress this year. Addi­tion­al releases brought the total num­ber of beavers released under the Park Authority’s five-year licence to 37 by mid-Decem­ber, with the total Upper Spey catch­ment pop­u­la­tion reach­ing 57 includ­ing kits born in the Park. Mon­it­or­ing and pub­lic engage­ment also expan­ded, with breed­ing con­firmed across most ter­rit­or­ies through kit watches and annu­al sur­vey work, while the Beaver Man­age­ment and Mit­ig­a­tion Group con­tin­ued to over­see how impacts are being man­aged on the ground. Fund­ing secured through Nation­al Parks UK’s part­ner­ship with Pearl and Dean also helped raise the pro­file of the pro­ject through a ded­ic­ated cinema advert.

Fresh­wa­ter pearl mus­sel – Fresh­wa­ter pearl mus­sel recov­ery work advanced well over the year through stronger part­ner­ship work­ing and prac­tic­al preparation

Page 29 of 122

for future con­ser­va­tion action. The Park Author­ity worked with part­ners includ­ing the Spey Fish­ery Board, NatureScot and the James Hut­ton Insti­tute to explore the feas­ib­il­ity of con­ser­va­tion breed­ing facil­it­ies and assess hab­it­at on the Dee and Spey catch­ments for poten­tial future release sites. A new Cairngorms Fresh­wa­ter Pearl Mus­sel strategy group was also estab­lished to guide the recov­ery plan, while sur­vey, elec­tro­fish­ing and genet­ic assess­ment work sup­por­ted future trans­lo­ca­tion plan­ning. Dur­ing peri­ods of low water on the Spey, staff also took dir­ect action to pro­tect around 2,500 mus­sels by mov­ing them into deep­er water.

People and place Volun­teer­ing and health walks — Volun­teer­ing and health walk activ­ity grew over the year, with new volun­teer rangers recruited and trained, estab­lished volun­teers reach­ing major con­tri­bu­tion mile­stones, and health walk pro­vi­sion expand­ing through increased loc­al lead­er­ship and the launch of three new Health Walks. The pro­gramme con­tin­ued to sup­port vis­it­or engage­ment and com­munity well­being, while also open­ing up new oppor­tun­it­ies for staff and volun­teers to con­trib­ute to prac­tic­al con­ser­va­tion and nature-based activ­ity. Over­all, the year demon­strated the value of volun­teer capa­city in extend­ing the Park Authority’s reach and strength­en­ing com­munity participation.

Ranger ser­vices – The ranger ser­vice adap­ted sig­ni­fic­antly dur­ing the year in response to chan­ging oper­a­tion­al demands. A restruc­ture was com­pleted to strengthen lead­er­ship capa­city and pre­pare for the addi­tion­al respons­ib­il­it­ies asso­ci­ated with the fire byelaw, while sea­son­al, train­ee and per­man­ent staff togeth­er main­tained a vis­ible pres­ence dur­ing the busiest vis­it­or peri­ods under­tak­ing over 1,100 patrols. Rangers con­tin­ued to play an import­ant role in vis­it­or engage­ment, fire pre­ven­tion mes­saging and com­munity out­reach, with evid­ence sug­gest­ing that sus­tained com­mu­nic­a­tion is help­ing to influ­ence beha­viour. A per­man­ent, all-year ranger post was cre­ated cov­er­ing Angus and North Perth­shire, which con­tin­ues the sea­son­al vis­it­or-related activ­ity in the area and cre­ates new oppor­tun­it­ies for rolling out activ­ity such as school vis­its and juni­or ranger pro­grammes to that area. This year has there­fore been one of both oper­a­tion­al deliv­ery and pre­par­a­tion for an expan­ded role in 2026.

Act­ive and sus­tain­able trans­port – Act­ive and sus­tain­able trans­port work moved for­ward through a com­bin­a­tion of design devel­op­ment, part­ner­ship work­ing and tar­geted invest­ment. Pro­gress was made on the next stage of act­ive travel

Page 30 of 122

plan­ning in sev­er­al com­munit­ies, while trans­port infra­struc­ture audits and new work­ing groups helped build a stronger evid­ence base for future improve­ments. Sup­port for bus stop upgrades, cycle car­riage on buses and mobil­ity hub devel­op­ment also demon­strated a prac­tic­al com­mit­ment to improv­ing trans­port choices for res­id­ents and vis­it­ors. The year has there­fore been one of found­a­tion-build­ing, pos­i­tion­ing key pro­jects to move into fur­ther devel­op­ment and delivery.

Paths and long-dis­tance routes — This year saw steady pro­gress on path improve­ments and long-dis­tance routes across the Nation­al Park. Deliv­ery con­tin­ued on pri­or­ity sec­tions of the Spey­side Way, includ­ing com­ple­tion of an upgrade between Insh and Inver­uglas and fur­ther gate remov­al to improve access­ib­il­ity. Across the wider net­work, access­ib­il­ity con­tin­ued to be a key theme with the access­ible paths toolkit for land man­agers and path groups pro­duced, and fund­ing ring fenced to sup­port access­ib­il­ity improve­ments. Togeth­er, this work has improved access for walk­ers, cyc­lists, horse riders and people using wheel­chairs or bug­gies, while lay­ing the ground­work for fur­ther route devel­op­ment in 2026. Rol­lout of the new style com­munity path leaf­lets con­tin­ued with one for Tomin­toul pro­duced in 2025 with oth­ers due to fol­low as exist­ing stocks run out.

Core Paths Plan Review — Review of the Core Paths Plan advanced sig­ni­fic­antly over the year. Fol­low­ing an inform­al con­sulta­tion, which gen­er­ated a strong level of pub­lic response, and dis­cus­sion with the Loc­al Out­door Access For­um, a draft plan was pro­duced in March 26 for the form­al con­sulta­tion stage. Along­side this, sup­port­ing assess­ment work began, tak­ing into account envir­on­ment­al, hab­it­ats and equal­it­ies considerations.

Access­ib­il­ity Intern­ship — Between July and Octo­ber 25 we hos­ted an intern­ship to work on access­ib­il­ity and inclus­ive access. Over the course of the place­ment, access­ib­il­ity inform­a­tion was gathered and updated, new path sur­veys were com­pleted against access­ible path stand­ards, and prac­tic­al tools were developed to sup­port col­leagues in identi­fy­ing and improv­ing routes. The intern­ship also strengthened links with access part­ners and has left a use­ful leg­acy in the form of bet­ter pub­lic inform­a­tion, clear­er intern­al guid­ance and a stronger plat­form for future access­ib­il­ity work.

Page 31 of 122

Vis­it­or infra­struc­ture — Vis­it­or infra­struc­ture invest­ment remained an import­ant area of deliv­ery this year. Fund­ing was alloc­ated across a range of pro­jects, from path works and site improve­ments to devel­op­ment activ­ity designed to unlock future invest­ment. The pro­gramme helped part­ners move for­ward more quickly by bring­ing sup­port in earli­er in the year, while planned main­ten­ance and repair activ­ity on key install­a­tions estab­lished a clear­er pipeline of work for the years ahead. The over­all effect has been to strengthen the vis­it­or exper­i­ence and improve read­i­ness for future cap­it­al delivery.

Wild­fire and Fire byelaws Pre­par­a­tions for the intro­duc­tion of the fire byelaw gathered pace over the year. Pro­duct­ive work with the Crown Office and Pro­cur­at­or Fisc­al Ser­vice, along­side dis­cus­sions with Police Scot­land, helped devel­op the leg­al and oper­a­tion­al frame­work needed for enforce­ment and evid­ence gath­er­ing. Wider engage­ment on wild­fire also con­tin­ued through part­ner for­ums, help­ing to build under­stand­ing of how col­lab­or­at­ive approaches can sup­port pre­pared­ness across the Park. Taken togeth­er, this work has posi­tioned the Park Author­ity more strongly for imple­ment­a­tion of the byelaw from 2026.

Trans­port — Cyc­ling and beha­viour change activ­ity — Cyc­ling and beha­viour change activ­ity expan­ded mean­ing­fully over the year. Bike buses were intro­duced across sev­er­al schools and early feed­back indic­ated encour­aging shifts towards more pupils cyc­ling reg­u­larly. Engage­ment with work­places also broadened, with repair work­shops, and skills sup­port includ­ing led rides help­ing to build con­fid­ence and increase access to cyc­ling. Along­side these pro­grammes, prac­tic­al invest­ment in bike hubs and related facil­it­ies helped rein­force the wider ambi­tion to make cyc­ling a more nor­mal and sup­por­ted choice across the Park.

Loc­al Devel­op­ment Plan (LDP) — Sig­ni­fic­ant pro­gress has been made on our new LDP this year, with the Evid­ence Report being com­pleted fol­low­ing sig­ni­fic­ant engage­ment with mem­bers of the pub­lic and oth­er key agen­cies / stake­hold­ers. The Evid­ence Report was approved by Board on 13 March 2026 and was sub­sequently sub­mit­ted to Scot­tish Government’s (SG) Divi­sion for Plan­ning and Envir­on­ment­al Appeals (DPEA) for a ​‘gate-check’ review to ensure the evid­ence is suf­fi­cient. A Call for Sites and Ideas was also launched in March 2026. This provided an oppor­tun­ity for people to sug­gest ideas that could help shape future plan­ning policies and devel­op­ment pri­or­it­ies across the Nation­al Park, and for

Page 32 of 122

landown­ers and developers to pro­pose sites they believe may be suit­able for devel­op­ment and poten­tial alloc­a­tion in the new LDP.

Plan­ning case­work — The Park Authority’s Plan­ning Com­mit­tee has con­sidered and approved applic­a­tions for a wide range of devel­op­ment pro­pos­als across the Nation­al Park dur­ing the year. These include sig­ni­fic­ant hous­ing devel­op­ments (includ­ing afford­able hous­ing), pro­pos­als for river / flood­plain res­tor­a­tion and wild­life ponds in loc­a­tions across the Park, com­munity-led flood defences, estate and forestry tracks, exten­sions and alter­a­tions at sig­ni­fic­ant vis­it­or facil­it­ies, and busi­ness / indus­tri­al devel­op­ments. In addi­tion, the Plan­ning Com­mit­tee has respon­ded to con­sulta­tions on a num­ber of major wind­farm pro­pos­als loc­ated just out­side the Park bound­ary, seek­ing to ensure they do not have an adverse impact on the spe­cial land­scape qual­it­ies of the Nation­al Park. Scot­tish Min­is­ters also pub­lished their decision on a plan­ning applic­a­tion which they had called in for determ­in­a­tion – approv­ing plan­ning per­mis­sion for 22 self-cater­ing apart­ments, shops, hotel and under­ground park­ing at a site in Aviemore in line with the Plan­ning Committee’s earli­er decision on this application.

Cul­tur­al Her­it­age Net­work — One of the com­mit­ments set out in our Part­ner­ship Plan is the devel­op­ment of a Cul­tur­al Her­it­age Net­work for the Cairngorms. We brought togeth­er a short-term work­ing group of nine indi­vidu­als from a range of dif­fer­ent cul­tur­al her­it­age back­grounds (from farm­ing to museums and loc­al artists) to co-design an event at Boat Hall in October.

The event brought 65 people togeth­er from across the Nation­al Park to net­work and explore col­lab­or­a­tion oppor­tun­it­ies; hear from experts in the field; devel­op a shared voice for cul­tur­al her­it­age; and con­sider how to influ­ence future policy, fund­ing and prac­tice. A report sum­mar­ising the group’s find­ings was pub­lished in Decem­ber and a second meet­ing fol­lowed in March, explor­ing a con­nec­ted archive for the Nation­al Park and agree­ing the scope and key pri­or­it­ies for the network.

To sup­port the group’s desired out­comes, the Park Author­ity worked with the Cairngorms Trust to launch a ded­ic­ated Com­munit­ies and Cul­tur­al Her­it­age Fund. A total of £65,000 was awar­ded to 11 pro­jects cel­eb­rat­ing loc­al her­it­age, crafts, art and music. Among those gran­ted fund­ing were the Brae­mar Loc­al History

Page 33 of 122

Group for digit­ising their archive mater­i­al, a Kin­gussie High School pro­ject to design, build and launch tra­di­tion­al boats (includ­ing a canoe, kayak and Spey cor­acle), and the cre­ation of a her­it­age hub in Strath­don, provid­ing a work­space and archive storage.

Com­munity gath­er­ing — As part of our efforts to sup­port com­munity coun­cils and devel­op­ment trusts in the Cairngorms, in April we brought togeth­er over 30 rep­res­ent­at­ives from across the Nation­al Park at the Vic­tor­ia Halls in Bal­later for a packed day of dis­cus­sions. Top­ics included volun­teer­ing, suc­ces­sion plan­ning and com­munity fun­drais­ing. This was the second event of its kind fol­low­ing a sim­il­ar gath­er­ing in Boat of Garten last year and our aim is to host one annu­ally, with the agenda and loc­a­tion set by the com­munity groups themselves.

Cairngorms 2030 engage­ment activ­ity — The Cairngorms 2030 Engage­ment team had a par­tic­u­larly busy year, rais­ing aware­ness of the pro­gramme and encour­aging loc­al people (from farm­ers to loc­al school chil­dren) to get involved. Over the past two years the team have now reached com­munit­ies in every major set­tle­ment in the Nation­al Park, a real test­a­ment to the com­mit­ment and organ­isa­tion of staff on the ground.

We engaged with 233 people at this year’s Grant­own Show (up from 207 last year), 211 people at the Greentown Show, 35 at a ded­ic­ated Strath­don road­show in Septem­ber plus a fur­ther 25 attend­ing a bespoke ses­sion with the loc­al Sil­ver Circle group before­hand. A Kin­craig fun day in Septem­ber saw us reach over 400 loc­al com­munity mem­bers, whilst 49 people joined the team at an Aviemore road­show event in Decem­ber. A fur­ther road­show took place in Boat of Garten in Janu­ary, with addi­tion­al events planned for the south of the Nation­al Park later this year.

Gael­ic Lan­guage Plan — The third edi­tion of the Park Authority’s Gael­ic Lan­guage Plan was approved by Bòrd na Gàidh­lig in April. The new plan, cov­er­ing 2025 to 2029, sup­ports the con­tin­ued use of Gael­ic and seeks to main­tain it as an act­ive lan­guage and cul­ture with­in the com­munit­ies of the Cairngorms Nation­al Park. In devel­op­ing the Gael­ic Lan­guage Plan, the Park Author­ity heard from more than 400 people and organ­isa­tions through a six-week online con­sulta­tion, which found that 90% agreed with its pro­posed priorities.

Page 34 of 122

Increas­ing the use and learn­ing of Gael­ic and pro­mot­ing a pos­it­ive image of Gael­ic are among the key pri­or­it­ies. A few key ele­ments of the plan include increas­ing oppor­tun­it­ies for young people to speak Gael­ic; fund­ing pro­jects that cel­eb­rate Gael­ic cul­ture; provid­ing Gael­ic lan­guage and cul­ture train­ing for com­munity rep­res­ent­at­ives, staff, rangers and board; and cel­eb­rat­ing Gael­ic through our pro­jects and chan­nels, includ­ing Cairngorms 2030 and Badenoch: The Storylands.

Cairngorms 2030 Com­munit­ies Fund — A centrepiece of the Cairngorms 2030 pro­gramme is the devel­op­ment of a £1 mil­lion Com­munit­ies Fund, designed by com­munit­ies from across the Nation­al Park and fur­ther afield. Recruit­ment of an 18-strong pan­el opened in Janu­ary and las­ted for six weeks.

The paid oppor­tun­ity was pro­moted extens­ively (includ­ing via loc­al and nation­al press, a door-drop to 30,000 house­holds, social media and posters in tar­get com­munit­ies) and we were delighted that over 250 people expressed an interest in being involved.

Applic­a­tions were received from every major town and vil­lage in the Nation­al Park and from every age group, with applic­ants ran­ging from 16 to 85 years old. We had strong engage­ment from a range of under-rep­res­en­ted groups, includ­ing eth­nic minor­it­ies, LGB­TQ+ and dis­abled people, and just under half of applic­ants repor­ted hav­ing ​‘min­im­al’ or ​‘no pre­vi­ous con­tact’ with the Park Author­ity. The pan­el met for the first time on 25 March.

Pledge Pro­cess Plan­et exhib­i­tion — Work­ing with the inde­pend­ent Cairngorms Cre­at­ive Net­work (which now has over 80 mem­bers), the Cairngorms 2030 arts and cul­ture pro­ject secured fund­ing from the Cairngorms Trust to devel­op a tour­ing ver­sion of their suc­cess­ful Pledge Pro­cess Plan­et exhib­i­tion, which was cre­ated in part­ner­ship with the sector.

The art exhib­i­tion – which is designed to con­nect land­scape and com­munity and inspire col­lect­ive action on cli­mate change – went on tour to Brae­mar and Kin­gussie through­out the autumn, spark­ing con­ver­sa­tions around cli­mate change.

Vis­it­or and res­id­ent sur­veys — Res­ults from the first ever res­id­ent and work­er sur­vey of the Nation­al Park were pub­lished in April. Inde­pend­ent mar­ket research

Page 35 of 122

com­pany MEL Research (who have pre­vi­ously worked with the Peak Dis­trict Nation­al Park) were com­mis­sioned to deliv­er both this and the vis­it­or sur­vey, and a total of 1,357 responses were received from every com­munity in the Nation­al Park.

82% of res­id­ents said they were proud to live and work in the Nation­al Park; 59% believed that Nation­al Park status had had a pos­it­ive impact on the area; 89% said that liv­ing in the Nation­al Park has a pos­it­ive impact on their phys­ic­al health; and 82% said it had a pos­it­ive impact on their men­tal health.

Res­id­ents indic­ated a high level of sat­is­fac­tion on work hap­pen­ing in the Nation­al Park to pre­serve cul­tur­al her­it­age, reduce wild­fire risk and pro­tect wild­life and hab­it­ats. The sur­vey also high­lighted areas where sat­is­fac­tion is lower, show­ing people’s con­cerns about their abil­ity to access afford­able housing.

Res­ults from our latest vis­it­or sur­vey (2024÷25) were pub­lished in Novem­ber, with 1,348 people tak­ing part face-to-face and a fur­ther 1,008 tak­ing part online. High­lights included three-quar­ters of vis­it­ors con­sid­er­ing nation­al park status import­ant when research­ing hol­i­day des­tin­a­tions. Over­all sat­is­fac­tion levels were at their highest ever, with 96% rat­ing their vis­it at least 8⁄10 and 43% rat­ing it 10/10. There was a strong con­nec­tion with repeat guests, with a fifth of people report­ing that they have vis­ited the area more than 20 times in the past five years.

Com­mu­nic­a­tions New Nation­al Park web­site — After over a year of com­plex devel­op­ment work, the new Cairngorms Nation­al Park web­site was launched in June. The site includes a num­ber of new com­munit­ies, wild­life and land­scape pages, as well as over 50 pro­ject pages cov­er­ing the work of the Park Author­ity and partners.

A new site-wide alerts sys­tem – linked dir­ectly to our social media posts – allows us to provide crit­ic­al updates on emer­ging issues such as wild­fires and extreme weath­er, path clos­ures etc, and to auto­mat­ic­ally serve these mes­sages on every webpage where they are relevant.

Page 36 of 122

An Ord­nance Sur­vey-powered map­ping tool includes details on key com­munit­ies, events, paths and points of interest, whilst our new con­tent find­er allows vis­it­ors to fil­ter and search for con­tent that would pre­vi­ously have been bur­ied deep in the site struc­ture. This includes a new Arti­fi­cial Intel­li­gence (AI)-driven doc­u­ment sum­mary fea­ture, which means even pre­vi­ously inac­cess­ible Port­able Doc­u­ment Format (PDF) can be sum­mar­ised and read e.g. by screen read­er users. We have also launched a new con­sulta­tions mod­ule on the site, with the Core Paths Plan the first pro­ject to go live

Social media — In March we suc­cess­fully merged our leg­acy Cairngorms Nature Face­book page with our exist­ing Nation­al Park Face­book page, bring­ing our total audi­ence to 89,425 across Face­book, Ins­tagram, Twit­ter, Linked­In and Bluesky (up from 66,000 pre-merger).

A new com­munity man­age­ment strategy – respond­ing to as many com­ments on our posts as pos­sible – reaped almost imme­di­ate rewards and has been suc­cess­ful in gen­er­at­ing pos­it­ive com­ments and inter­ac­tions. It has also provided the oppor­tun­ity to address misinformation.

Dava wild­fire — One of the UK’s largest ever wild­fires took place to the north of the Nation­al Park in late June / early July. As well as coordin­at­ing mul­tiple state­ments, alerts and react­ive media lines (in part­ner­ship with the Scot­tish Fire and Res­cue Ser­vice), the team cre­ated an insert for Cairn res­id­ents’ magazine express­ing our thanks to the hun­dreds of game­keep­ers, fire­fight­ers, for­est­ers, stalk­ers, farm­ers and land man­agers who helped tackle the blaze.

Fire byelaw — The approv­al of a new fire byelaw by min­is­ters in Septem­ber had extens­ive media cov­er­age, lead­ing the north STV News at Six pro­gramme and fea­tur­ing prom­in­ently on BBC Report­ing Scot­land and across radio, print and digit­al out­lets (total reach of 266 stor­ies, or an estim­ated reach of 700 mil­lion). There was also sig­ni­fic­ant press interest in the wild­fire sum­mit hos­ted by Scot­tish Gov­ern­ment in Grant­own a few weeks later, lead­ing to fol­low-up art­icles in nation­al and loc­al media.

The Park Authority’s Com­mu­nic­a­tions team worked with cre­at­ive agency Bright Sig­nals to devel­op a coordin­ated com­mu­nic­a­tions cam­paign to sup­port the byelaw rol­lout, under the umbrella title of ​‘Pro­tect our Nation­al Park. No flame. No

Page 37 of 122

spark’. The cam­paign, which com­menced in March, fea­tured res­id­ents / work­ers from across the Nation­al Park, call­ing on vis­it­ors and res­id­ents alike to join them in help­ing reduce the threat of wild­fires. It has so far reached more than 1.8 mil­lion people.

Pro­mo­tion included everything from road signs to social media videos and adverts, ranger con­ver­sa­tions, part­ner sig­nage, beer mats, win­dow stick­ers and leaf­lets. We also developed part­ner­ships with key social media influ­en­cers, with a spe­cif­ic focus on teen­agers / men in their early twen­ties and ​‘van life’ adven­tur­ers to ensure we got the mes­sage across to key tar­get audiences.

To provide addi­tion­al insight into cam­paign per­form­ance, we con­duc­ted pre-byelaw sur­veys with 500 people (400 vis­it­ors, 100 res­id­ents) to gauge how aware they were of our mes­saging and will repeat this again in Septem­ber to see how effect­ive it was at influ­en­cing their behaviour.

Pub­lic­a­tions, sig­nage and inter­pret­a­tion — Three issues of Cairn magazine were pub­lished over the course of the year, in July, Novem­ber and March. Based on res­id­ent sur­vey res­ults, 44% of Nation­al Park res­id­ents read the magazine in the pre­ced­ing 12 months, mak­ing it second only to social media in terms of how people get their inform­a­tion about the Park Authority’s work.

High­lights included a fire byelaw spe­cial in March; a large fea­ture on the Cairngorms 2030 deer lar­der pro­ject; res­ults from our res­id­ent and work­er sur­vey; and a piece on the over £1 mil­lion of path upgrades taken for­ward in the Nation­al Park over the past three years.

Else­where, new inter­pret­a­tion pan­els were com­pleted at the Charter Chest Path near Brae­mar, the Cairns Walk on Bal­mor­al Estate, and the Sky Hide star­gaz­ing spot at Tomin­toul. Sig­nage was also com­pleted at Glen­more Vis­it­or Centre and Café, includ­ing byelaw mes­saging at this stra­tegic vis­it­or location.

UK Nation­al Parks com­mu­nic­a­tions — The Park Author­ity hos­ted an annu­al gath­er­ing of the 15 Heads of Com­mu­nic­a­tions from UK nation­al parks at the High­land Wild­life Park in June. On the agenda was the makeup of a new UK com­mu­nic­a­tions ser­vice, as well as a case study from RZSS on their response to the illeg­al release of lynx in the Nation­al Park.

Page 38 of 122

The Head of Com­mu­nic­a­tions and Engage­ment – in his role as Scot­land lead on the UK com­mu­nic­a­tions steer­ing group – worked with col­leagues across the UK to agree a new mes­saging frame­work for all 15 UK nation­al parks. Led by cre­at­ive agency Out­side of Ordin­ary, the res­ults of this piece of work will be rolled out in the autumn.

Cairngorms 2030 – Dur­ing this, the second year of the deliv­ery phase for the Cairngorms 2030 pro­gramme, deliv­ery has been strong. The pro­gramme has involved over 80 part­ner organ­isa­tions work­ing with mem­bers of staff across all areas of the Park Author­ity to deliv­er the programme’s 20 pro­jects. Com­mu­nic­a­tions and engage­ment activ­ity has sup­por­ted deliv­ery effect­ively, help­ing to increase vis­ib­il­ity, par­ti­cip­a­tion and pub­lic under­stand­ing of programme’s aims. Some of the high­lights of the programme’s work dur­ing 2025⁄26 are set out below.

Restor­ing and enhan­cing land­scapes: Deliv­ery against tar­gets for wood­land expan­sion and peat­land res­tor­a­tion con­tin­ued. Future farm­ing ini­ti­at­ives were explored through the devel­op­ment of pilot farms; deliv­ery this year included improve­ment of water infra­struc­ture to allow regen­er­at­ive graz­ing, thereby improv­ing field eco­logy and soil qual­ity. Work towards the devel­op­ment of cli­mate resi­li­ent catch­ments has con­tin­ued with the com­ple­tion of designs, and the pre­par­a­tion of flood resi­li­ence models.

Empower­ment: Cli­mate learn­ing and edu­ca­tion work involved loc­al schools in a vari­ety of activ­it­ies, includ­ing ranger-led ses­sions. Com­munity arts and cul­ture were explored with the tour­ing of the Pledge, Pro­cess, Plan­et exhib­i­tion and the deliv­ery of cre­at­ive work­shops. A volun­teer board has been estab­lished to lead on future cre­at­ive activ­ity with­in the com­munity. Recruit­ment of a pan­el of volun­teers to co-design the pro­posed scheme for the dis­tri­bu­tion of com­munity man­aged cli­mate grants com­menced in Janu­ary; this is an innov­at­ive pro­ject that will inform future ini­ti­at­ives in par­ti­cip­at­ive democracy.

Trans­port: Act­ive Com­munit­ies plan­ning pro­gressed, with com­ple­tion of the first design stage for planned act­ive travel routes, sup­por­ted by fund­ing from Trans­port Scot­land. There was sol­id pro­gress in the devel­op­ment of act­ive travel infra­struc­ture, cyc­ling ini­ti­at­ives and beha­viour change programmes.

Page 39 of 122

Health and well­being: The out­door demen­tia resource centre at Bad­aguish con­tin­ued its inspir­a­tion­al work, and there was a move into the wider top­ic of brain health, which offered the oppor­tun­ity to work with a wider audi­ence across Badenoch and Strath­spey. The Fest­iv­al for All looked at innov­at­ive ways of help­ing people with mobil­ity and access issues to con­nect more mean­ing­fully with nature.

Cor­por­ate Services Organ­isa­tion­al Devel­op­ment (OD) Strategy We adop­ted an Organ­isa­tion­al Devel­op­ment and People Strategy in May 2024. This strategy iden­ti­fies 6 key themes, set out below, all of which are under­pinned by the Park Authority’s over­arch­ing vision:

“The Cairngorms Nation­al Park Author­ity will be an organ­isa­tion that involves all our staff in devel­op­ing our goals, tar­gets, pro­cesses and strategies; cel­eb­rates what we do well, both at an organ­isa­tion­al and indi­vidu­al level; inspires and enables out­stand­ing per­form­ance; and sup­ports our staff to achieve excel­lence in their work, their beha­viour and their rela­tion­ships with each oth­er and extern­al stake­hold­ers. This will help us to achieve our ambi­tion to be the best small pub­lic sec­tor organ­isa­tion in Scotland”.

The key themes are:

  • Our infra­struc­ture will sup­port our staff to work com­fort­ably, safely and effi­ciently in an ever-chan­ging work­ing envir­on­ment, sup­port­ing our aspir­a­tions for net zero, and mak­ing the best use of the tech­no­logy avail­able to us (this includes our facil­it­ies and IT services).
  • We will have the Inform­a­tion and Data sys­tems and pro­cesses to enable our staff to work effi­ciently and innovatively.
  • We will have the right staff in the right roles at the right time, who will be motiv­ated and sup­por­ted to strive towards excel­lence but will also take per­son­al respons­ib­il­ity for their own devel­op­ment, as well as that of col­leagues where they have spe­cif­ic expert­ise / skills that can be shared.
  • We will ensure that our work­force is healthy and resi­li­ent, where staff are will­ing and able to get the best out of each oth­er, and where diversity is wel­comed and celebrated.

Page 40 of 122

  • We will lead our organ­isa­tion with hon­esty, inspir­a­tion, respect and integ­rity, and will have a set of val­ues that reflect the cul­ture of the organ­isa­tion, and which are dynam­ic and active.
  • We will have effi­cient, innov­at­ive and trans­par­ent com­mu­nic­a­tions in the organ­isa­tion, where all staff have oppor­tun­it­ies to par­ti­cip­ate and where we openly cel­eb­rate success.

We estab­lished an intern­al Cul­ture and Val­ues Focus Group, drawn from staff mem­bers across the organ­isa­tion. The group was tasked with con­sid­er­ing if the exist­ing val­ues were still rel­ev­ant for our organ­isa­tion, review­ing them where neces­sary, and then estab­lish­ing how the Park Author­ity will embed the agreed val­ues in our day-to-day oper­a­tions. This work involved input from staff at all levels in the organ­isa­tion and led to the devel­op­ment of a set of Organ­isa­tion­al Prin­ciples, to replace the pre­vi­ous val­ues, which had become out­dated. The approved and adop­ted prin­ciples are Pas­sion and Ded­ic­a­tion; Com­munity, Pion­eer­ing; and Inspir­ing Leadership,

An addi­tion­al piece of work fol­low­ing the 2023⁄24 best com­pan­ies sur­vey involved fur­ther engage­ment with staff at bands D and E (policy officer and man­ager levels) to identi­fy key high­lights and low­lights around engage­ment, and a col­lab­or­at­ive action plan fol­lowed to enhance the engage­ment of this group

Staff Con­sultat­ive Forum Our Staff Con­sultat­ive For­um has con­tin­ued to work effect­ively, through­out the last year. It remains a very valu­able con­duit for staff con­sulta­tion, which has com­ple­men­ted drop-in ses­sions for all staff where dir­ect con­ver­sa­tions have been held on any ques­tions or ideas offered by all staff.

Staff Sur­vey The Best Com­pan­ies staff engage­ment sur­vey was launched in Novem­ber 2025. The Park Author­ity has achieved ​“One Star” status, and the engage­ment tra­ject­ory shows that our cur­rent staff group are more engaged than ever before. We have run this sur­vey every two years since 2012, and the res­ults are key to inform­ing our Organ­isa­tion­al Devel­op­ment Activ­ity for the next few years. The sur­vey meas­ures engage­ment across eight factors — Lead­er­ship, My Man­ager, My Com­pany, My Team, Well­being, Per­son­al Growth, Fair Deal and Giv­ing Some­thing Back.

Page 41 of 122

Shared ser­vices We have worked col­lab­or­at­ively with our col­leagues at Loch Lomond and the Trossachs Nation­al Park Author­ity over a num­ber of years, shar­ing both expert­ise and resources. The part­ner­ship has con­tin­ued in its aims of devel­op­ing fur­ther resi­li­ence in our respect­ive IT pro­vi­sions, shar­ing expert­ise in organ­isa­tion­al devel­op­ment and find­ing effi­cien­cies to the bene­fit of both organ­isa­tions and the wider pub­lic sector.

The Park Author­ity has also provided shared ser­vices to oth­er organ­isa­tions and groups, in par­tic­u­lar provid­ing payroll ser­vices and HR sup­port to the Scot­tish Land Com­mis­sion, and payroll ser­vices to the Cairngorms Trust, as well as facil­it­ies sup­port to a range of com­munity part­ners in their deliv­ery of NPPP and com­munity devel­op­ment objectives.

Inform­a­tion Tech­no­logy and Cyber Security Cyber secur­ity is a high pri­or­ity for the Park Author­ity. Dur­ing the year, we worked on renew­ing our Cyber Essen­tials Plus accreditation.

Audit Our intern­al and extern­al audit review pro­cesses con­tin­ue to con­firm the effect­ive­ness and effi­ciency of our man­age­ment and con­trol systems.

Intern­al audit con­firmed management’s recog­ni­tion of the need to invest in and expand our pro­cure­ment con­trols. We have suc­cess­fully imple­men­ted our res­ult­ing pro­cure­ment action plan over the course of the year, includ­ing recruit­ment of a Pro­cure­ment Officer to lead on this work going forward.

Pre­vi­ous extern­al audit recom­mend­a­tions on review of our fin­ance sys­tems have also been com­pleted, with a new sys­tem pro­cured, designed and suc­cess­fully imple­men­ted with effect from April 2025.

Sus­tain­ab­il­ity and cli­mate change The Park Author­ity con­tin­ues to refine our intern­al mon­it­or­ing meth­od­o­logy and par­ti­cip­ate in the nation­al mod­el estab­lished by Scot­tish Gov­ern­ment for report­ing on car­bon emis­sions gen­er­ated through our busi­ness activities.

We con­tin­ue to engage with the actions and report­ing duties linked to the Cli­mate Change (Scot­land) Act 2009. Man­dat­ory Pub­lic Bod­ies Cli­mate Change Duties. Annu­al Report­ing was com­pleted and sub­mit­ted to the Scot­tish Gov­ern­ment in Novem­ber 2024. The report cov­ers the fol­low­ing areas: Gov­ernance, Management

Page 42 of 122

and Strategy; Emis­sions, Tar­gets and Pro­jects; Adapt­a­tion; Pro­cure­ment and Wider Influ­ence; and Oth­er Not­able Activities.

The Park Author­ity con­tin­ues to reduce its CO2 emis­sions against baseline, with latest busi­ness emis­sions cal­cu­lated at 83.8 tonnes, a reduc­tion of over 44% against the baseline year (2007÷08). The ongo­ing trend evid­ences the Park Authority’s com­mit­ment to driv­ing down its own busi­ness emis­sions while estab­lish­ing a lead­er­ship dir­ec­tion for oth­ers with­in the park. The most sig­ni­fic­ant con­trib­ut­or to these emis­sions is that gen­er­ated from busi­ness mileage. We are man­aging this by main­tain­ing a high pro­por­tion of hybrid and fully elec­tric vehicles in our fleet and redu­cing the mileage travelled.

Sus­tain­ab­il­ity and cli­mate change remain key under­ly­ing themes with­in our Cor­por­ate Plan and also with­in the Nation­al Park Part­ner­ship Plan, under­pin­ning the stra­tegic work of the Park Author­ity and all its part­ners in the Nation­al Park. It is an object­ive of the Part­ner­ship Plan to ensure that the Cairngorms Nation­al Park reaches Net Zero as soon as pos­sible and con­trib­utes all it can to help­ing Scot­land to meet its Net Zero com­mit­ments. We will mon­it­or and report on the organisation’s pro­gress towards the achieve­ment of Net Zero, and lead on empower­ing indi­vidu­al con­tri­bu­tion to our Net Zero ambitions.

Future activ­it­ies: 2026⁄27 Oper­a­tion­al Year The nature and cli­mate crisis is at the core of the Cairngorms Nation­al Park Part­ner­ship Plan. The plan sets out how we will look after the Park and how we will devel­op and deliv­er a well-being eco­nomy that works for the people of the Cairngorms whilst also restor­ing nature and deliv­er­ing net zero. It is our duty to deliv­er the Part­ner­ship Plan, along with our part­ners, to look after and enhance this spe­cial place for the people of Scotland.

The Cor­por­ate Plan 2023 – 27 describes how the Cairngorms Nation­al Park Author­ity will con­trib­ute to the deliv­ery of the Cairngorms Nation­al Park Part­ner­ship Plan 2022 – 27. It also sets out how the Park Author­ity plans to achieve our aim of being ​‘the best small pub­lic body in Scot­land’ and how we will sup­port Scot­tish Gov­ern­ment across its policy priorities.

Cor­por­ate Plan 2023 – 2027 Our ambi­tion is set out across three themes – Nature and cli­mate, People, and Place. These are the themes of the Nation­al Park Part­ner­ship Plan, which sets out the role of the Nation­al Park Author­ity in help­ing to deliv­er the Plan’s object­ives. This is under­pinned by our cor­por­ate func­tions and com­mu­nic­a­tions and

Page 43 of 122

engage­ment work. Over 100 organ­isa­tions are lis­ted in the Part­ner­ship Plan doc­u­ment, demon­strat­ing our inten­tion to work in part­ner­ship with a range of organ­isa­tions, com­munit­ies, land man­agers, busi­nesses and oth­ers to deliv­er real change on the ground. The Park Author­ity has a good track record of using its fund­ing to lever­age sig­ni­fic­ant sup­port into the Cairngorms and we will con­tin­ue to do this. The Part­ner­ship Plan focuses on the big issues in the Nation­al Park and our role is to work with all to tackle those key chal­lenges and come up with prac­tic­al solutions.

Lead­er­ship from Scot­tish Gov­ern­ment is clear around the nature and cli­mate crisis, on the need to have a just trans­ition and the need to devel­op an eco­nomy that works for all. There is sig­ni­fic­ant legis­lat­ive change likely to hap­pen in Scot­land over the com­ing years that will have a sig­ni­fic­ant impact on the Nation­al Park and how the Park Author­ity oper­ates. The Nat­ur­al Envir­on­ment (Scot­land) Bill, the Land Reform (Scot­land) Bill, and the Agri­cul­tur­al and Rur­al Com­munit­ies (Scot­land) Bill, have all been enacted with­in this par­lia­ment­ary term. The Author­ity will con­tin­ue to work closely with pub­lic sec­tor part­ners, through work­ing groups and through stra­tegic engage­ment in entit­ies such as the Envir­on­ment and Eco­nomy Lead­ers’ Group, Scot­tish For­um on Nat­ur­al Cap­it­al etc. and across the full range of Scot­tish Gov­ern­ment functions.

The Park Author­ity will con­tin­ue to look at new ways to deliv­er our com­mit­ments in this plan peri­od. This includes look­ing for altern­at­ive fund­ing streams through grant applic­a­tions, spon­sor­ship oppor­tun­it­ies, green fin­ance and oth­er mech­an­isms. It will also include work­ing col­lab­or­at­ively with part­ners to deliv­er improved ser­vices on the ground, includ­ing our work with oth­er pub­lic sec­tor organ­isa­tions as part of the Pub­lic Sec­tor Reform pro­cesses to identi­fy new, more effi­cient and sim­pli­fied approaches to deliv­er­ing pub­lic benefit.

The Park Author­ity aspires to be the best small pub­lic body in Scot­land. The Best Com­pan­ies Sur­vey has con­sist­ently shown that we are a people-ori­ent­ated organ­isa­tion that is per­form­ing well for its employ­ees. The Park Author­ity will build on our Organ­isa­tion­al Devel­op­ment Strategy and will strive to ensure a high-per­form­ance cul­ture and take for­ward new oppor­tun­it­ies where they arise to deliv­er for the Nation­al Park. We will also be innov­at­ive, quick to act and to empower staff to deliv­er the strategies that are put in place by the Park Author­ity Board. Diversity and equal­ity will be a key com­pon­ent of our work as the Park Authority.

Page 44 of 122

Per­form­ance monitoring Pro­gress over the course of the year against the tar­gets with­in the Nation­al Park Part­ner­ship Plan are set out in the table below. The Red / Amber / Green (RAG) rat­ing describes Park Authority’s assess­ment of how well deliv­ery is pro­gress­ing towards these targets.

AimObject­iveRAG rat­ing
Nature and climate
A1 Net ZeroEnsure the Cairngorms Nation­al Park reaches net zero as soon as pos­sible and con­trib­utes all it can to help­ing Scot­land meet its net zero commitments.Green
A2 Wood­land expansionIncrease the amount of wood­land in the Nation­al Park to sup­port lar­ger, more nat­ur­al wood­lands, expand­ing in places up to a nat­ur­al treeline, provid­ing con­nec­tions across river catch­ments and around the cent­ral core of the mountains.Green
A3 Peat­land restorationRestore and man­age peat­land with­in the Nation­al Park to reduce car­bon emis­sions and improve biodiversity.Green
A4 Deer and herb­i­vore impactsReduce the neg­at­ive impacts of red deer and oth­er herb­i­vores across the Nation­al Park to enable wood­lands to expand, heath­er loss to be reversed, peat­lands to recov­er and wider biod­iversity and land­scape enhance­ments to take place.Green
A5 Moor­land managementIncrease the sus­tain­ab­il­ity of moor­land man­age­ment in the Nation­al Park to ensure great­er spe­cies and struc­tur­al diversity in moor­land areas of the Nation­al Park.Amber
A6 Gamebird managementEnsure that all pheas­ant and part­ridge shoots adhere to best prac­tice and that all gamebird releases are sus­tain­able and do not neg­at­ively impact on nat­ive biodiversity.Amber
A7 Fire managementEnsure that all man­aged burn­ing (muir­burn) fol­lows best prac­tice as defined by the muir­burn licens­ing scheme, sup­port­ing hab­it­at res­tor­a­tion and recovery.Amber
A8 Farm­ingWork with farms in the Nation­al Park to reduce their car­bon foot­print, con­serve soil car­bon, encour­age sus­tain­able pro­duc­tion and deliv­er increased biod­iversity on in-bye land.Green
A9 Fresh­wa­ter systemsRestore and con­nect rivers to thriv­ing wet­lands and flood­plains as part of a wider res­tor­a­tion of the Nation­al Park’s fresh­wa­ter sys­tems, help­ing mit­ig­ate the impacts of cli­mate change.Green
A10 Eco­lo­gic­al networkCon­nect hab­it­ats and eco­sys­tems across all dif­fer­ent types of land use in the Nation­al Park to cre­ate an eco­lo­gic­al net­work, which will bring wider land­scape biod­iversity and people benefits.Green
A11 Eco­lo­gic­al restorationImprove eco­sys­tem func­tion­al­ity and resi­li­ence across the Nation­al Park by increas­ing the area of land man­aged prin­cip­ally for eco­lo­gic­al restoration.Green
A12 Cairngorms Nature IndexDevel­op a more com­plete under­stand­ing of the Nation­al Park’s spe­cies, hab­it­ats and eco­sys­tems, and help mon­it­or long-term pro­gress through a ded­ic­ated Cairngorms Nature Index.Amber

Page 45 of 122

AimObject­iveRAG rat­ing
People
A13 Spe­cies recoveryEnsure spe­cies thrive in the Nation­al Park with key assemblages across the Cairngorms with­in the semi-nat­ur­al landscape.Green
A14 Green investmentUse private green invest­ment in the Nation­al Park to fund nature’s recov­ery and share the bene­fits between com­munit­ies, landown­ers, work­ers and wider society.Green
B1 Work­ing age populationThe pro­por­tion of young and work­ing-age people in the Nation­al Park increases rel­at­ive to the total res­id­ent pop­u­la­tion, which remains stable.Amber
B2 Well­being economyDevel­op a well­being eco­nomy that deliv­ers social justice in a healthy eco­sys­tem, draw­ing on the spe­cial nat­ur­al and cul­tur­al qual­it­ies of the Cairngorms.Green
B3 Real liv­ing wageIncrease the num­ber of Real Liv­ing Wage employ­ers in the Nation­al Park.Green
B4 Skills and trainingIncrease skills and train­ing oppor­tun­it­ies for people in the Nation­al Park to meet busi­ness needs and ensure oppor­tun­it­ies cre­ated by the growth in green jobs can be filled by res­id­ents and under-rep­res­en­ted groups.Green
B5 Com­munity assets and landIncrease the num­ber of assets in com­munity own­er­ship or man­age­ment, the num­ber of social enter­prises that gen­er­ate a profit and the area of land where com­munit­ies are involved in man­age­ment decisions.Green
B6 New approaches to cit­izen participationStrengthen the par­ti­cip­a­tion struc­tures that sup­port plan­ning and decision-mak­ing at a loc­al level.Green
B7 Com­munity-led plan­ning and developmentCom­munit­ies have up-to-date com­munity action plans and are sup­por­ted by a com­munity-led loc­al devel­op­ment fund­ing pro­gramme, deliv­er­ing the Nation­al Park Part­ner­ship Plan.Green
B8 Gael­ic lan­guage and cultureEncour­age great­er use of Gael­ic in the Nation­al Park.Green
B9 Men­tal & Phys­ic­al HealthGreen Health refer­ral pro­grammes in place in all GP practicesGreen
B10 A Park for AllBet­ter oppor­tun­it­ies for every­one to enjoy the Nation­al Park and the vis­it­or pro­file will be more diverse.Amber
B11 Volun­teer­ing & Out­door LearningAt least 200 volun­teer rangers by 2030. Increase num­ber of volun­teer days every yearGreen
Place
C1 Access to housingEnsure that there is suf­fi­cient afford­able hous­ing stock to enable people to live and work with­in the Nation­al Park.Amber
C2 New housingDeliv­er new hous­ing in the Nation­al Park and ensure as much as pos­sible is secured for key work­ers and / or to resolve afford­ab­il­ity issues.Amber

Page 46 of 122

AimObject­iveRAG rat­ing
C3 Hous­ing and com­munity benefitWork with com­munit­ies to ensure that the major­ity of land alloc­ated for devel­op­ment around vil­lages and towns in the Nation­al Park is con­trolled by com­munit­ies or pub­lic bod­ies to help man­age long-term devel­op­ment needs.Amber
C4 Vil­lage and town centresEnsure vil­lages and town centres in the Nation­al Park are thriv­ing places where people live, shop and meet.Green
C5 Vis­it­ors to the Nation­al ParkWork to sta­bil­ise vis­it­or num­bers in the peak sea­son, focus­ing growth on quieter months and on those areas that have the infra­struc­ture and capa­city to man­age for addi­tion­al vis­it­ors. Max­im­ise the eco­nom­ic and com­munity bene­fit of tour­ism by encour­aging longer stays, while main­tain­ing exist­ing high levels of vis­it­or satisfaction.Green
C6 A sus­tain­able destinationSecure the Nation­al Park’s repu­ta­tion as an inter­na­tion­al exem­plar in sus­tain­able tour­ism and the man­age­ment of pro­tec­ted areas.Green
C7 Trans­port to and around the ParkPro­mote a mod­al shift towards sus­tain­able and act­ive travel in the way vis­it­ors and com­muters get to, and every­one moves around, the Nation­al Park.Green
C8 Access­ible path and cycle networkImprove path, cycle and out­door access net­works to give out­stand­ing oppor­tun­it­ies to exper­i­ence the nat­ur­al and cul­tur­al her­it­age of the Nation­al Park to the widest range of people, while min­im­ising dis­turb­ance to vul­ner­able spe­cies, hab­it­ats and sites.Green
C9 High-qual­ity vis­it­or experienceWel­come vis­it­ors and provide a high-qual­ity exper­i­ence while man­aging their impacts through provid­ing bet­ter infra­struc­ture and high-qual­ity ranger services.Green
C10 Cul­tur­al heritageSafe­guard and pro­mote the Park’s cul­tur­al her­it­age and provide oppor­tun­it­ies for every­one to exper­i­ence and learn about the Nation­al Park’s out­stand­ing his­tor­ic envir­on­ment, his­tory and culture.Green

Page 47 of 122

Future actions iden­ti­fied to pro­gress amber-rated pro­jects are set out below.

A5 Moor­land man­age­ment: A full under­stand­ing of the spe­cies and struc­tur­al diversity of moor­land areas will only be pos­sible when the Cairngorms Nature Index is com­pleted (A12 Cairngorms Nature Index, expec­ted 2026).

A6 Gamebird man­age­ment: Avail­ab­il­ity of robust data on gamebird releases is prov­ing dif­fi­cult to obtain and there­fore assess­ment of impacts on nat­ive biod­iversity is slower than anti­cip­ated. The Park Author­ity is work­ing with part­ners to pro­gress this.

A7 – Fire man­age­ment: The imple­ment­a­tion of the Muir­burn Licens­ing scheme was delayed by a year fol­low­ing Min­is­teri­al decision. Muir­burn Licens­ing Applic­a­tions will be open from July 2026, and a new Muir­burn Code will be launched in the same month. The Park Author­ity will work to ensure there are min­im­al breaches of the new Code going forward.

A12 Cairngorms Nature Index: Com­ple­tion of the Cairngorms Nature Index has been slower than ori­gin­ally anti­cip­ated due to the com­plex­ity of data but is pro­grammed for com­ple­tion in 2026.

B1 Work­ing age pop­u­la­tion: This object­ive is influ­enced by nation­al eco­nom­ic and soci­et­al changes more than the activ­ity of the Park Author­ity or oth­er region­al deliv­ery part­ners. Work to strengthen loc­al and region­al eco­nom­ies and provide appro­pri­ate hous­ing for the work­force con­tin­ues to slow the loss of young people and those of work­ing age.

B10 A park for all: The most recent vis­it­or sur­vey showed a decline in vis­it­ors to the Nation­al Park from C2DE back­grounds. We are devel­op­ing a pro­gramme of work – includ­ing spe­cif­ic comms and engage­ment activ­ity – aimed at reach­ing this audi­ence and remov­ing bar­ri­ers to par­ti­cip­a­tion. Increased invest­ment in bar­ri­er remov­al and path improve­ments is under way, and fur­ther fund­ing is set aside to increase oppor­tun­it­ies for those with dis­ab­il­it­ies that reduce their mobility.

C1 Access to hous­ing, C2 New hous­ing and C3 Hous­ing and community bene­fit: Deliv­ery of afford­able hous­ing is depend­ent on part­ners being able to access Scot­tish Gov­ern­ment fund­ing. There remains uncer­tainty about the avail­ab­il­ity of this fund­ing into the medi­um to long term future.

Page 48 of 122

Over­all, sig­ni­fic­ant pro­gress has been made towards the tar­gets set out in the Nation­al Park Part­ner­ship Plan, with deliv­ery on tar­get to achieve com­ple­tion over the time remain­ing for deliv­ery of the plan.

Grant Moir Chief Exec­ut­ive and Account­able Officer 09 Octo­ber 2026

Page 49 of 122

2 ACCOUNT­AB­IL­ITY REPORT

The account­ab­il­ity report comprises:

  • a state­ment on cor­por­ate gov­ernance, explain­ing the com­pos­i­tion and organ­isa­tion of the Authority’s gov­ernance struc­tures and how these sup­port the achieve­ment of our aims,
  • a report on remu­ner­a­tion and staff­ing, and
  • dis­clos­ures on mat­ters on which the Author­ity is account­able to Parliament.

2.1 Cor­por­ate Gov­ernance Report

2.1.1 Dir­ect­ors’ Report

The Dir­ect­ors’ Report sets out the key aspects of the intern­al organ­isa­tion­al change and devel­op­ment with­in the Park Author­ity dur­ing the year to 31 March 2026.

The Board Board mem­bers who served through­out the year are lis­ted on pages 3 and 4. Board mem­bers’ pro­files can be found at Cairngorms | Staff and Board where a link to mem­bers’ Register of Interests can be found at Cairngorms | Board Mem­bers Register of Interest.

Fees paid to Board mem­bers are noted on page 75 togeth­er with the total amount of reim­bursed expenses paid in the year (these fig­ures are not sub­ject to audit). No pen­sion con­tri­bu­tions are made for any Board member.

The Seni­or Man­age­ment Team The Chief Exec­ut­ive, who is also the Account­able Officer, is Grant Moir. The names of the Dir­ect­ors, who served dur­ing the year, are lis­ted on page 4.

Board Devel­op­ment and Governance The Park Author­ity con­tin­ues to recog­nise the import­ance of train­ing and devel­op­ment to ensure that all staff and Board mem­bers have the skills required to deliv­er their role in the con­text of the organisation’s eth­os of enabling and part­ner­ship. Appro­pri­ate Board train­ing and devel­op­ment pro­cesses sup­port the good gov­ernance arrange­ments set out in the Stand­ing Orders and Code of Con­duct Cairngorms | Board Code of Conduct.

Page 50 of 122

The Board has had a rel­at­ively stable mem­ber­ship through­out 2025⁄26. The induc­tion pro­cesses and train­ing on key respons­ib­il­it­ies under­taken on appoint­ment of the cur­rent board mem­bers have con­tin­ued to be built on over the course of the year. The train­ing ses­sion on mem­bers’ respons­ib­il­it­ies under the Code of Con­duct delivered in Feb­ru­ary 2025 by an exper­i­enced extern­al train­er was fol­lowed up by fur­ther board effect­ive­ness review ses­sions over the course of 2025⁄26, at which mem­bers con­sidered the Board’s oper­a­tions and assessed their effect­ive­ness as a col­lect­ive. The Con­vener has under­taken a full set of indi­vidu­al Board devel­op­ment con­ver­sa­tions with each mem­ber, identi­fy­ing per­son­al train­ing require­ments where required.

The Board has also con­tin­ued to carry out ​‘hori­zon scan­ning’ meet­ings, fol­low­ing on actions agreed at its risk man­age­ment train­ing, whereby time is reserved to con­sider the issues that may face the organ­isa­tion in the medi­um to long term (three to five years). These hori­zon scan­ning meet­ings inform evol­u­tion of the stra­tegic risk register and the future policy devel­op­ment agenda for the Board.

The Board con­tin­ues to provide time for inform­al busi­ness ses­sions through­out the year. These ses­sions sup­port the devel­op­ment and train­ing of mem­bers through provid­ing oppor­tun­ity for inform­al dis­cus­sion of areas of the Park Authority’s busi­ness. These dis­cus­sions help inform mem­bers of key issues with­in sec­tors of the Park Authority’s activ­it­ies, while also help­ing inform staff of the gen­er­al dir­ec­tion of board views, which sup­ports future con­sid­er­a­tion of policy devel­op­ment and busi­ness planning.

The Con­vener has taken for­ward suc­ces­sion plan­ning for board mem­ber­ship dur­ing the year, with early appoint­ment made in April 2026 for a board role becom­ing vacant from Novem­ber 2026.

Staff Devel­op­ment and Management Our stra­tegic policy for work­force man­age­ment bal­ances oper­a­tion­al needs against deliv­er­ing the max­im­um poten­tial flex­ib­il­ity in mak­ing budget pri­or­it­isa­tion decisions. Approx­im­ately 33% of our staff group have worked for the Author­ity for few­er than two years; a num­ber of these col­leagues are engaged on short term sea­son­al con­tracts or were recruited to posts to sup­port ongo­ing pro­ject work (e.g. Cairngorms 2030). New staff have been wel­comed into the organ­isa­tion through a vari­ety of means, includ­ing a com­pre­hens­ive induc­tion pro­gramme, all-staff events, the activ­it­ies of the Staff Con­sultat­ive Committee

Page 51 of 122

and a staff sur­vey with fol­low-up activ­it­ies. Our Work­force man­age­ment strategy was revised in 2025⁄26 to provide a refreshed over­sight of our man­age­ment of staff­ing levels and deploy­ment, with a view to what the organisation’s require­ments will be by 2030. This peri­od cov­ers the remain­ing deliv­ery and clos­ure of our Cairngorms 2030 pro­gramme, and the asso­ci­ated organ­isa­tion­al trans­ition from this major, extern­ally fun­ded programme.

The Park Author­ity aspires to be ​“the best small pub­lic body In Scot­land” — to be innov­at­ive, quick to act and to empower staff to deliv­er the strategies that are put in place by the Board. Flex­ible work­ing with­in a hybrid work­ing envir­on­ment provides oppor­tun­ity for our staff to achieve an appro­pri­ate work-life bal­ance while meet­ing the needs of the organ­isa­tion. Over the past year, we have employed our pro­cess of reg­u­lar monthly per­form­ance devel­op­ment con­ver­sa­tions (PDCs) and have provided suf­fi­cient budget to sup­port iden­ti­fied train­ing needs.

The Park Author­ity main­tains over­sight of its man­age­ment of sick­ness absence through reg­u­lar review of per­form­ance at Board and Seni­or Man­age­ment Team level. Sick­ness absence is included as a key per­form­ance indic­at­or in the Park Authority’s cor­por­ate per­form­ance frame­work. In 2025⁄26 the aver­age num­ber of days lost through sick­ness absence was 4.55 (4.84 days per per­son 2024⁄25).

Sus­tain­ab­il­ity report­ing and envir­on­ment­al matters A key pur­pose of the Park Author­ity is to pro­mote part­ner­ship work­ing and give lead­er­ship to all the bod­ies and agen­cies involved in the sus­tain­able devel­op­ment of the Nation­al Park. Through coordin­at­ing devel­op­ment and col­lect­ive agree­ment of the Cairngorms Nation­al Park Part­ner­ship Plan, the Park Author­ity aims to ensure the col­lect­ive and co-ordin­ated deliv­ery of the three themes of the Part­ner­ship Plan. Thus, the Park Author­ity leads oth­ers in ensur­ing that we are all liv­ing or work­ing in, and caring for, the Cairngorms Nation­al Park in such a way that it remains, and wherever pos­sible is enhanced, to be enjoyed by future gen­er­a­tions. Sus­tain­ab­il­ity and envir­on­ment­al con­sid­er­a­tions are there­fore at the heart of everything this organ­isa­tion does.

In 2019, the Park Author­ity ini­ti­ated the plan­ning pro­cess towards our becom­ing a net zero emis­sion organ­isa­tion by 2045 and achiev­ing the even more chal­len­ging object­ive of real­ising a 75% reduc­tion in our emis­sions by 2030,

Page 52 of 122

through our Board’s con­sid­er­a­tion of the ​“Net Zero with Nature” paper (Decem­ber 2019). The Park Author­ity fol­lowed this up by coordin­at­ing the Cairngorms Net Zero with Nature con­fer­ence in Aviemore in early March 2020. We con­tin­ue this work and have dis­tilled our future strategy in our Cor­por­ate Plan 2023 – 27, while we have coordin­ated the incor­por­a­tion of key cli­mate action object­ives into the Nation­al Park Part­ner­ship Plan.

The Park Author­ity con­tin­ues to reduce its CO2 emis­sions against baseline, with latest busi­ness emis­sions cal­cu­lated at 83.8 tonnes, a reduc­tion of over 44% against the baseline year (2007÷08). The ongo­ing trend evid­ences the Park Authority’s com­mit­ment to driv­ing down its own busi­ness emis­sions while estab­lish­ing a lead­er­ship dir­ec­tion for oth­ers with­in the park. The most sig­ni­fic­ant con­trib­ut­or to these emis­sions is that gen­er­ated from busi­ness mileage. We are man­aging this by main­tain­ing a high pro­por­tion of hybrid and fully elec­tric vehicles in our fleet and redu­cing the mileage travelled.

Illus­tra­tions of our wider pri­or­ity to deliv­er sus­tain­ab­il­ity are presen­ted through­out this report.

Social, com­munity and human rights issues Our work on sus­tain­ab­il­ity and the envir­on­ment is also cent­ral to our activ­it­ies around social and com­munity devel­op­ment. Con­serving and enhan­cing the spe­cial qual­it­ies of the Cairngorms Nation­al Park is essen­tial if the Park is to build and main­tain a diverse and vibrant economy.

The Park Authority’s work in this area spans sup­port for sus­tain­able busi­ness devel­op­ment with­in the Nation­al Park, to pro­mot­ing a wel­fare eco­nomy and devel­op­ment of afford­able hous­ing, to estab­lish­ing part­ner­ships with indi­vidu­al com­munit­ies in devel­op­ing and deliv­er­ing those com­munit­ies’ action plans, and more widely to engage with com­munity plan­ning partnerships.

Our vari­ous com­munity devel­op­ment activ­it­ies, sup­port for com­munity action plan­ning and com­munity led loc­al devel­op­ment all seek to engage com­munit­ies in identi­fy­ing both needs and solu­tions to ensure their long-term sus­tain­ab­il­ity. We seek to influ­ence nation­al fund­ing to ensure that the Cairngorms has the resources to sup­port com­munity led devel­op­ment, to ensure this crit­ic­al area of work continues.

Page 53 of 122

Diversity The Cairngorms Nation­al Park Author­ity is com­mit­ted to pro­mot­ing equal­ity both as an employ­er and through the work it does.

As a pub­lic body, the Park Author­ity must meet the require­ments of the Equal­ity Act 2010. Every four years the Author­ity is required to devel­op a set of equal­ity out­comes, main­stream equal­ity, gath­er employ­ee inform­a­tion, review pro­cure­ment pro­ced­ures, and pub­lish these mater­i­als. The most recent report was pub­lished in April 2025 and can be found at Cairngorms | Equal­ity report 2025.

Over the last year there has been sig­ni­fic­ant activ­ity on equal­it­ies across the organ­isa­tion, including:

  • The Author­ity has vari­ous Equal­it­ies Groups that have been pro­act­ively engaged dur­ing the year. The extern­al Equal­ity Advis­ory Pan­el, with 13 mem­bers, has con­tin­ued to advise on all our pro­jects, policies and strategies. The intern­al Equal­ity Advocacy Group, com­pris­ing staff mem­bers, has played a key role in sug­gest­ing and imple­ment­ing innov­at­ive pro­jects and policies.
  • Act­ive Cairngorms Youth Action Team have run five rounds of Youth Loc­al Action Group fund­ing since 2023 and awar­ded almost £75,489 to 80 youth pro­jects in the Nation­al Park.
  • An expand­ing Volun­teer Cairngorms pro­gramme, with 77 volun­teer rangers, has sup­por­ted a range of activ­it­ies to engage those who may exper­i­ence exclusion.
  • Increased and inclus­ive com­munity engage­ment through Cairngorms 2030, has engaged with audi­ences typ­ic­ally hard to reach.
  • A num­ber of innov­at­ive pro­jects have received grant fund­ing through the Cairngorms Trust, includ­ing the Act­ive Cairngorms E‑bike pro­ject and the Park for All fund. The Park Authority’s sup­port for the Cairngorms Trust ensures that the char­ity is able to max­im­ise the pro­por­tion of its fund­ing deployed in provid­ing sup­port to com­munity led pro­jects, all of which are assessed for their con­tri­bu­tion to equal­it­ies and inclusion.
  • Inclus­ive cor­por­ate com­mu­nic­a­tion has been achieved through brand­ing and pub­lic­a­tions, con­tent and imagery. Digit­al engage­ment has reached more diverse audi­ences. The Park Authority’s web­site has been designed with access­ib­il­ity at the core.

Page 54 of 122

  • Improved vis­it­or infra­struc­ture has taken account of the dif­fer­ing needs of the wide range of exist­ing and poten­tial users, not­ably those with dis­ab­il­it­ies or restric­ted mobility.
  • Innov­a­tion in our park-wide con­sulta­tions has helped reach out to a range of under­rep­res­en­ted audi­ences that we had not pre­vi­ously engaged with.
  • LGB­TQ+ Charter accred­it­a­tion at Found­a­tion level was achieved as a mech­an­ism to evid­ence our pro­gress in devel­op­ing and imple­ment­ing equal­it­ies policy and action.
  • The Park Author­ity has imple­men­ted sev­er­al bold and innov­at­ive policies, includ­ing sup­port around Gender Diversity, Neurodi­versity, Fer­til­ity Treat­ment, Preg­nancy Loss, Men­stru­al Health, Endo­met­ri­os­is and Men’s Health and Well­being, and has spoken about them at nation­al conferences.

Inform­a­tion and data security The Authority’s cur­rent IT and Data Man­age­ment Strategy estab­lishes the vis­ion and dir­ec­tion for our invest­ment and work in this area. We are work­ing towards ​“a high resi­li­ence, cloud-based IT infra­struc­ture that will sup­port effect­ive and effi­cient remote work­ing. We will seek to max­im­ise ​‘tech­no­logy as a ser­vice’ offer­ings that include mov­ing ele­ments of our ser­vice to man­aged ser­vice and / or cloud pro­vi­sion where it is sup­por­ted as best value ser­vice pro­vi­sion. This will reduce the need for in-house tech­nic­al skills and reduce over-reli­ance on indi­vidu­al staff pres­ence and know­ledge base, trans­fer­ring this risk to third parties and, con­sequently, mit­ig­at­ing the risk of over-depend­ency on spe­cial­ist staff.”

The Park Author­ity has had no instances of loss of data or per­son­al inform­a­tion over the course of the year. The Gov­ernance State­ment included in this Annu­al State­ment and Accounts sets out more inform­a­tion on the Park Authority’s range of intern­al con­trols and review mech­an­isms to ensure data secur­ity, amongst oth­er things.

In 2025⁄26 we received a total of 57 inform­a­tion requests (2024÷25: 45). 93% of these requests were pro­cessed with­in the stat­utory timelines.

The Park Author­ity also has a fully developed suite of wider policies designed to ensure that feed­back on our ser­vice stand­ards, activ­it­ies and per­form­ance can be giv­en. This includes our com­plaints, griev­ance, and whis­tleblow­ing policies. We have a mature approach to intern­al and extern­al feed­back, ensur­ing appro­pri­ate invest­ig­a­tions of feed­back take place and seek­ing to draw improve­ment points

Page 55 of 122

out of invest­ig­a­tions where appro­pri­ate, irre­spect­ive of wheth­er the ini­ti­at­ing point of com­plaint or neg­at­ive feed­back is upheld. Seek­ing improve­ment in this way sup­ports our organ­isa­tion­al aim of being the best small pub­lic body in Scot­land, and also in secur­ing Best Value in accord­ance with nation­al objectives.

Our inform­a­tion access and com­plaints policies are pub­lished on the Park Authority’s website.

Pro­cure­ment Dur­ing 2025⁄26, the Park Author­ity strengthened its pro­cure­ment func­tion through deliv­ery of key com­mis­sions, invest­ment in staff cap­ab­il­ity, improved intern­al sys­tems, and great­er trans­par­ency in mar­ket engage­ment. This has sup­por­ted a more stra­tegic approach to pro­cure­ment, bet­ter aligned with organ­isa­tion­al pri­or­it­ies and wider pub­lic value objectives.

Key deliv­ery activ­ity dur­ing the year included the suc­cess­ful pro­cure­ment for the design of the Cairngorms 2030 Act­ive Travel projects.

Staff cap­ab­il­ity was strengthened through a pro­gramme of pro­cure­ment train­ing delivered by Scot­land Excel, cov­er­ing spe­cific­a­tion devel­op­ment, eval­u­ation, and con­tract man­age­ment. This has helped improve con­fid­ence and con­sist­ency in com­mis­sion­ing prac­tice across the organisation.

Intern­al sys­tems were also developed fur­ther through the estab­lish­ment of a pro­cure­ment pro­ject data­base and con­tract register, improv­ing over­sight, plan­ning, and the basis for future reporting.

The Author­ity also improved trans­par­ency and mar­ket engage­ment through a clear­er pipeline of tender oppor­tun­it­ies, sup­port­ing sus­tain­ab­il­ity, Fair Work First, com­munity wealth build­ing, and par­ti­cip­a­tion from loc­al sup­pli­ers where appropriate.

Page 56 of 122

2.1.2 State­ment of Nation­al Park Authority’s Responsibilities

Under sec­tion 25(1) of the Nation­al Parks (Scot­land) Act 2000, the Cairngorms Nation­al Park Author­ity is required to keep prop­er accounts and account­ing records, pre­pare an account of its expendit­ure and receipts for each fin­an­cial year in accord­ance with dir­ec­tions issued by the Scot­tish Min­is­ters, and send the account to the Scot­tish Min­is­ters by such time as they may direct.

The fin­an­cial state­ments are to be pre­pared on the accru­als basis and must give a true and fair view of its expendit­ure and cash flow for the fin­an­cial year, and of the state of affairs as at the end of the fin­an­cial year.

Aud­it­ors The accounts of the Park Author­ity are audited by For­vis Maz­ars LLP who are appoin­ted by the Aud­it­or Gen­er­al for Scot­land in accord­ance with para­graph 25(2) of the Nation­al Parks (Scot­land) Act 2000. Their five-year appoint­ment ends after the audit of the annu­al report and accounts for 2026⁄27.

The costs relat­ing to the stat­utory audit work for the fin­an­cial year were £29,357 (2024÷25: £24,752). No oth­er fees for non-audit related ser­vices were paid in either year.

The Inde­pend­ent Auditor’s report to the Park Author­ity, the Aud­it­or Gen­er­al for Scot­land and the Scot­tish Gov­ern­ment is on pages 89 to 92.

2.1.3 State­ment of Board’s Responsibilities

The Board has a cor­por­ate respons­ib­il­ity for ensur­ing that the Park Author­ity ful­fils the aims and object­ives set by the Scot­tish Min­is­ters and for pro­mot­ing the eco­nom­ic, effi­cient, and effect­ive use of staff and oth­er resources in accord­ance with the prin­ciples of Best Value.

The Con­vener of the Board The Con­vener is respons­ible to Scot­tish Min­is­ters and is charged with ensur­ing that the Park Authority’s policies and actions sup­port the wider stra­tegic policies of the Scot­tish Min­is­ters, and that the Park Authority’s affairs are con­duc­ted with probity.

The Con­vener has par­tic­u­lar lead­er­ship respons­ib­il­it­ies on:

Page 57 of 122

  • for­mu­lat­ing the Board’s strategy,
  • ensur­ing that the Board, in mak­ing decisions, takes prop­er account of guid­ance provided by the Scot­tish Ministers,
  • pro­mot­ing the effi­cient and effect­ive use of staff and oth­er resources,
  • encour­aging high stand­ards of pro­pri­ety, and
  • rep­res­ent­ing the view of the Board to the gen­er­al public.

The Con­vener also ensures that all Board Mem­bers, when tak­ing up office, are fully briefed on the terms of their duties, rights, and respons­ib­il­it­ies, and receive appro­pri­ate train­ing. They advise the Scot­tish Min­is­ters when Board vacan­cies arise, with a view to ensur­ing an appro­pri­ate spread of bal­ance of pro­fes­sion­al and fin­an­cial expert­ise and also assesses the per­form­ance of Board Mem­bers annually.

A fuller state­ment of the Board’s and Convener’s respons­ib­il­it­ies is set out in the Frame­work Agree­ment estab­lished between the Scot­tish Gov­ern­ment and the Park Authority.

2.1.4 State­ment of the Account­able Officer’s Responsibilities

As Chief Exec­ut­ive of the Park Author­ity, I am des­ig­nated the Account­able Officer and am per­son­ally respons­ible for safe­guard­ing the pub­lic funds for which I have sole charge, for ensur­ing the pro­pri­ety and reg­u­lar­ity in the hand­ling of those funds, and for the day-to-day oper­a­tions and man­age­ment of the Park Authority.

I am expec­ted to act in accord­ance with the Man­age­ment State­ment / Fin­an­cial Memor­andum for the Park Author­ity and with­in the terms of the rel­ev­ant guid­ance in the Scot­tish Pub­lic Fin­ance Manu­al (SPFM) and oth­er instruc­tions and guid­ance issued by Scot­tish Min­is­ters, in par­tic­u­lar the Memor­andum to Account­able Officers for Oth­er Pub­lic Bod­ies, and in particular:

  • provide rel­ev­ant account­ing and dis­clos­ure require­ments, and apply suit­able account­ing policies on a con­sist­ent basis,
  • make judge­ments and estim­ates on a reas­on­able basis,
  • state wheth­er the applic­able account­ing stand­ards have been fol­lowed, and dis­close and explain any mater­i­al depar­tures in the fin­an­cial state­ments, and
  • pre­pare the fin­an­cial state­ments on the going con­cern basis unless it is inap­pro­pri­ate to assume that the Park Author­ity will con­tin­ue in operation.

Page 58 of 122

Dis­clos­ure of Inform­a­tion to Aud­it­ors by the Account­able Officer So far as I am aware, there is no rel­ev­ant audit inform­a­tion of which the Park Authority’s aud­it­ors are unaware, and I have taken all reas­on­able steps to make myself aware of any rel­ev­ant audit inform­a­tion and to estab­lish that the aud­it­ors are aware of that information.

Account­able Officer’s state­ment on the Annu­al Accounts As Account­able Officer I believe that the annu­al report and accounts as a whole are fair, bal­anced and understandable.

2.2 Gov­ernance Statement

Scope of responsibility As Account­able Officer, I am respons­ible for main­tain­ing sound sys­tems of intern­al con­trol that sup­port the achieve­ment of Cairngorms Nation­al Park Authority’s policies, aims and object­ives, while safe­guard­ing the pub­lic funds and depart­ment­al assets for which I am per­son­ally respons­ible. These duties are in accord­ance with the Frame­work Agree­ment between the Park Author­ity and Scot­tish Gov­ern­ment and align with respons­ib­il­it­ies assigned to me in the Scot­tish Pub­lic Fin­ance Manu­al (SPFM).

The SPFM, issued by the Scot­tish Min­is­ters, provides guid­ance to the Scot­tish Gov­ern­ment and oth­er rel­ev­ant bod­ies on the prop­er hand­ling of pub­lic funds, and sets out the rel­ev­ant stat­utory, par­lia­ment­ary, and admin­is­trat­ive require­ments, emphas­ising the need for eco­nomy, effi­ciency, and effect­ive­ness, and pro­motes good prac­tice and high stand­ards of pro­pri­ety. As Account­able Officer, I am respons­ible for ensur­ing that the Park Authority’s intern­al con­trol sys­tems com­ply with the require­ments of the SPFM.

The Frame­work Agree­ment with Scot­tish Gov­ern­ment sets out the role of the Park Authority’s Board in provid­ing lead­er­ship and gov­ernance. The Frame­work Agree­ment is a stand­ard agree­ment between Scot­tish Gov­ern­ment and its devolved pub­lic bod­ies and came into force fol­low­ing approv­al by the Park Author­ity Board at its meet­ing on 26 May 2023.

The gov­ernance respons­ib­il­it­ies of the Board are sup­por­ted by Stand­ing Orders and a Code of Con­duct, both revised and adop­ted in 2024. Required addi­tions to the Code to handle Board involve­ment in quasi-judi­cial and reg­u­lat­ory decision

Page 59 of 122

mak­ing were agreed with the Stand­ards Com­mis­sion for Scot­land. The Board agreed a ​“Gov­ernance Respons­ib­il­ity Frame­work” doc­u­ment in 2021, set­ting out the respect­ive roles and respons­ib­il­it­ies of the Board and its non-exec­ut­ive Board mem­bers and seni­or man­agers in decision mak­ing, to give added clar­ity and under­stand­ing to this aspect of the Park Authority’s gov­ernance. Our group of pro­fes­sion­al, seni­or staff advisors, com­ple­men­ted by appro­pri­ate Board train­ing and devel­op­ment pro­cesses, sup­port the good gov­ernance arrange­ments set out in the Stand­ing Orders and Code of Conduct.

As a pub­lic body, the Park Author­ity is com­mit­ted to access­ib­il­ity, open­ness, and account­ab­il­ity, and sup­ports the highest stand­ards in cor­por­ate gov­ernance. Oth­er than the doc­u­ments referred to above and the resource alloc­a­tion let­ters issued to me over the course of the year; there were no oth­er writ­ten author­it­ies provided to me over the course of 2025⁄26.

The oper­a­tion of the Board and sub-committees The Board com­prises 19 mem­bers: 7 appoin­ted by Min­is­ters fol­low­ing nom­in­a­tion by five Coun­cils with bound­ar­ies with­in the Nation­al Park, 7 appoin­ted by Scot­tish Gov­ern­ment through pub­lic appoint­ments pro­cesses, and 5 dir­ectly elec­ted with­in the wards of the Nation­al Park.

The Board there­fore reflects a blend of dif­fer­ent exper­i­ence, back­grounds and interests. The full Board meets reg­u­larly to con­sider strategy and per­form­ance against the cur­rent Cor­por­ate Plan. Meet­ings are sched­uled quarterly, with addi­tion­al meet­ings con­vened as required. To enable the Board to dis­charge its duties, all mem­bers receive appro­pri­ate and timely inform­a­tion in advance of meet­ings with all agen­das and papers also placed in the pub­lic domain. Meet­ings are open to the pub­lic, with the excep­tion of occa­sion­al meet­ings held in private for vari­ous reas­ons of busi­ness and com­mer­cial confidentiality.

To ensure that the Board devel­ops an under­stand­ing of the cur­rent and emer­ging issues, mem­bers also par­ti­cip­ate in inform­al dis­cus­sion ses­sions to con­sider evolving policy issues and pro­pos­als. These meet­ings are held in private to provide for early-stage dis­cus­sion and mem­bers’ learn­ing and devel­op­ment on a range of policy top­ics. The agreed stra­tegic dir­ec­tion of the Park Author­ity is dis­cussed and iden­ti­fied in full, open con­sid­er­a­tion at form­al meetings.

Page 60 of 122

The Board has estab­lished sub-com­mit­tees: a Plan­ning Com­mit­tee (which deals with all aspects of the Park Authority’s stat­utory plan­ning respons­ib­il­it­ies), togeth­er with Com­mit­tees cov­er­ing Gov­ernance, Resources, Per­form­ance, and Audit and Risk. The com­mit­tee struc­ture aug­ments the gov­ernance of the Author­ity and enhances the Board’s assur­ance role, as the Authority’s scale of activ­it­ies and sup­port of sig­ni­fic­ant pro­grammes con­tin­ues to increase. The Gov­ernance Com­mit­tee remains in place to sup­port the Board and the Con­vener to main­tain over­sight of the effect­ive­ness of gov­ernance arrange­ments across the organ­isa­tion, includ­ing the effect­ive­ness of the com­mit­tee struc­ture itself. All com­mit­tees have del­eg­ated duties and respons­ib­il­it­ies, set out in terms of ref­er­ence agreed by the full Board, to over­see and scru­tin­ise the Park Authority’s deploy­ment and man­age­ment of resources. The oper­a­tion of the com­mit­tee struc­ture has con­tin­ued in place through­out the 2025⁄26 fin­an­cial year.

The record of attend­ance at Board meet­ings can be found in the Remu­ner­a­tion and Staff Report with­in the Annu­al Report and Accounts.

The Audit and Risk Committee The Audit and Risk Committee’s role is to provide effect­ive gov­ernance over all aspects of the Park Authority’s intern­al man­age­ment con­trol sys­tems and the annu­al fin­an­cial accounts and audit. It also takes a lead in stra­tegic risk man­age­ment, ensur­ing that risks impact­ing on stra­tegic object­ives are iden­ti­fied and mit­ig­ated, and that risk man­age­ment is embed­ded through­out the Park Authority’s oper­a­tions. It is sup­por­ted by the Park Authority’s intern­al audit func­tion, delivered by wbg, and extern­al aud­it­ors, For­vis Maz­ars. Both the intern­al and extern­al aud­it­ors have inde­pend­ent access to the Com­mit­tee and to its Con­vener. The Com­mit­tee is tasked with mon­it­or­ing the oper­a­tion of the intern­al con­trol func­tion and bring­ing any mater­i­al mat­ters to the atten­tion of the full Board. Detailed reports of all audit reviews are made avail­able to both man­age­ment and the Committee.

The Com­mit­tee meets at least quarterly and reports to the Board on the adequacy and effect­ive­ness of the Park Authority’s intern­al con­trols, and more widely on its work in the pre­ced­ing year.

Page 61 of 122

The Board has con­tin­ued a pro­cess of self-eval­u­ation of effect­ive­ness and gov­ernance. The Board main­tains a skills mat­rix based on self-eval­u­ation by mem­bers, and which is updated as new mem­bers are appoin­ted. A review of the skills mat­rix car­ried out in Novem­ber 2025 iden­ti­fied a require­ment for the future recruit­ment of Board mem­bers with know­ledge and under­stand­ing of:

  • organ­isa­tion­al fin­an­cial and risk man­age­ment, and
  • land­scape scale nature res­tor­a­tion and land­scape scale change management.

The Park Author­ity intends to carry out a full mem­ber sur­vey in late 2026 in order to identi­fy train­ing needs, and to guide mem­ber appointments.

Dur­ing the year, the Board held vari­ous work­shops to dis­cuss mat­ters of effect­ive­ness and gov­ernance, including:

  • Con­sid­er­a­tion of equal­ity duties in the pub­lic sec­tor (March 2025)
  • Dis­cus­sion of the Authority’s val­ues and cul­ture (May 2025)
  • Per­son­al use of social media (May 2025)
  • Board effect­ive­ness (August 2025)
  • Hori­zon scan­ning (Octo­ber 2025)

The Board has agreed a set of Cor­por­ate Per­form­ance Indic­at­ors to improve its over­sight of deliv­ery against key stra­tegic object­ives and the Park Authority’s Cor­por­ate Plan. A detailed per­form­ance report is sub­mit­ted to the Board annu­ally on deliv­ery against key per­form­ance indic­at­ors, along­side a review of stra­tegic risk man­age­ment. These mon­it­or­ing and con­trol mech­an­isms sup­port Board scru­tiny over deliv­ery of the Cor­por­ate Plan and Nation­al Park Part­ner­ship Plan priorities.

Peri­od­ic reports from inde­pend­ent intern­al and extern­al aud­it­ors form a key and essen­tial ele­ment in inform­ing my review as Account­able Officer of the effect­ive­ness of the sys­tems of intern­al con­trol with­in the Park Author­ity. The Board’s Audit and Risk Com­mit­tee also plays a vital role in this regard, through its con­sid­er­a­tion of audit recom­mend­a­tions arising from reviews of intern­al con­trol sys­tems, and its scru­tiny of pro­posed man­age­ment action to address any improve­ments required. The Audit and Risk Com­mit­tee also con­siders both a

Page 62 of 122

three-year plan for intern­al audit cov­er­age and annu­ally agrees an intern­al audit plan flow­ing from that three-year plan.

Shared ser­vices delivery The Park Author­ity plays an import­ant role in provid­ing sup­port to loc­al com­munit­ies and organ­isa­tions, over a range of activ­it­ies, to help deliv­er the Nation­al Park Part­ner­ship Plan’s pri­or­it­ies. We have con­tin­ued to sup­port the Cairngorms Loc­al Action Group Trust in its lead­er­ship and deliv­ery of new Com­munity Led Loc­al Devel­op­ment fund­ing streams. Fol­low­ing com­ple­tion of the Devel­op­ment Phase of the Cairngorms 2030 Her­it­age Hori­zons Pro­gramme, and after a lengthy applic­a­tion pro­cess, in Janu­ary 2024 we were awar­ded £10.771m fund­ing by the Nation­al Lot­tery Her­it­age Fund to com­mence the Deliv­ery Phase of the Cairngorms 2030 pro­gramme. These have been sig­ni­fic­ant, community‑, and part­ner-led pro­grammes of activ­ity. Our man­age­ment and intern­al con­trol struc­tures ensure that sup­port for these com­munity-based deliv­ery entit­ies is sep­ar­ated from the core activ­it­ies of the Author­ity, while ensur­ing that our sup­port helps them achieve ​“best prac­tice” in their operations.

The Author­ity also under­takes a range of shared ser­vice arrange­ments with oth­er pub­lic body part­ners. Over the course of the year, we have worked with the Scot­tish Land Com­mis­sion, provid­ing payroll ser­vices, togeth­er with advice and sup­port on human resource and organ­isa­tion­al devel­op­ment mat­ters. We have also col­lab­or­ated on a range of shared ser­vice deliv­ery with Loch Lomond and the Trossachs Nation­al Park Author­ity (LLT­NPA). We have received sup­port from LLT­NPA on IT infra­struc­ture main­ten­ance and devel­op­ment, shared licence agree­ments for plan­ning sys­tems, and data back-up and secur­ity arrange­ments. In addi­tion to these more form­al shared ser­vices with LLT­NPA, both Nation­al Park Author­it­ies con­tin­ue to col­lab­or­ate closely on areas of shared policy interest.

Intern­al audit The intern­al audit func­tion is an integ­ral ele­ment of scru­tiny of the Park Authority’s intern­al con­trol sys­tems. wbg were appoin­ted as the Park Authority’s intern­al aud­it­ors in 2025, fol­low­ing an open pro­cure­ment pro­cess, and have under­taken a com­pre­hens­ive assess­ment of key intern­al con­trol sys­tems since their appoint­ment. Dur­ing the year to 31 March 2026, wbg have repor­ted to the Audit and Risk Com­mit­tee on the fol­low­ing reviews:

Page 63 of 122

Gov­ernance & risk

  • Cor­por­ate gov­ernance arrangements

Oper­a­tion­al

  • Imple­ment­a­tion of a new fin­ance system
  • Pro­ject ini­ti­ation processes
  • Grant admin­is­tra­tion and management
  • Fol­low up on pre­vi­ous recommendations
  • IT dis­aster recov­ery (advis­ory review car­ried out in April 2026)

All recom­mend­a­tions made by wbg are con­sidered, giv­en man­age­ment responses, which are con­sidered by the Audit and Risk Com­mit­tee, and imple­men­ted as appropriate.

Extern­al audit Extern­al aud­it­ors are appoin­ted for us by the Aud­it­or Gen­er­al for Scot­land through Audit Scot­land. Audit Scot­land appoin­ted For­vis Maz­ars to the role with effect from the com­mence­ment of the audit of the 2022⁄23 annu­al accounts. We con­tin­ue to devel­op our rela­tion­ship with For­vis Maz­ars, who review key sys­tems in order to form a view on the effect­ive­ness of con­trol arrange­ments, and to sup­port their audit opin­ion on the fin­an­cial state­ments. No non-audit work was under­taken by For­vis Maz­ars, and con­sequently, no fees were paid oth­er than the agreed fee for extern­al audit work.

Best value The Audit and Risk Com­mit­tee con­tin­ues to mon­it­or the Authority’s adher­ence to Scot­tish Gov­ern­ment Best Value guidelines and our approach to con­tinu­ous improve­ment. Since the launch, in 2023⁄24, of our Organ­isa­tion­al Devel­op­ment and People Strategy 2024, we have con­tin­ued to improve our work pro­cesses, organ­isa­tion­al envir­on­ment, and deliv­ery of ser­vices. The res­ults of our 2025 staff sur­vey have informed the deliv­ery of con­tinu­ous organ­isa­tion­al improve­ment as part of our Cor­por­ate Plan to 2027.

Risk man­age­ment We have a risk man­age­ment strategy in accord­ance with guid­ance issued by Scot­tish Min­is­ters, and in accord­ance with the prin­ciples of The Orange Book, to

Page 64 of 122

identi­fy actu­al and poten­tial threats that may pre­vent us from deliv­er­ing our stat­utory pur­pose, and also to identi­fy appro­pri­ate mit­ig­a­tion actions.

The Board recog­nises the import­ance of risk man­age­ment and con­tin­ues to mon­it­or the Park Authority’s Stra­tegic Risk Register, with­in its estab­lished risk appet­ite, for areas of the 2023⁄27 Cor­por­ate Plan. This approach sup­ports deliv­ery of our Cor­por­ate Plan objectives.

The Stra­tegic Risk Register records risks, action taken to mit­ig­ate the iden­ti­fied risks and seni­or management’s respons­ib­il­ity for lead­ing on each risk and its mit­ig­a­tion. The Stra­tegic Risk Register is reviewed by the Seni­or Man­age­ment Team at least four times each year and updated by the full Board and the Audit and Risk Com­mit­tee as part of each quarterly cycle of meetings.

The Audit and Risk Com­mit­tee, with the Seni­or Man­age­ment Team, leads on embed­ding risk man­age­ment pro­cesses through­out the Park Author­ity. Both groups con­sider the man­age­ment of stra­tegic risk in line with the Risk Strategy to ensure that the required actions are appro­pri­ately reflec­ted and incor­por­ated in oper­a­tion­al deliv­ery plans.

Data secur­ity Pro­ced­ures are in place to ensure that inform­a­tion is being man­aged in accord­ance with legis­la­tion and that data is held accur­ately and securely. The Park Author­ity has exper­i­enced no repor­ted nor recor­ded instances of data loss in the year to 31 March 2026.

We con­tin­ue to review our digit­al prac­tices and infra­struc­ture to ensure they remain fit for pur­pose and that all reas­on­able steps are taken to min­im­ise the risk of data loss or com­prom­ise of sys­tems due to Cyber Attacks. Dur­ing the year, the Park Author­ity worked towards renew­al of its accred­it­a­tion under the Cyber Essen­tials Plus scheme.

The Authority’s Seni­or Man­age­ment Team approved an IT and Data Man­age­ment Strategy in 2021. The strategy described our trans­ition toward cloud-based ser­vice infra­struc­ture. This strategy will be reviewed and refreshed in 2026.

Page 65 of 122

Busi­ness continuity The Author­ity imple­men­ted its Busi­ness Con­tinu­ity Plan (BCP) pro­cesses in 2020, in response to the COVID19 pan­dem­ic. The BCP pri­or­it­ised the main­ten­ance and evol­u­tion of sys­tems to sup­port dis­persed work­ing while main­tain­ing max­im­um focus on deliv­ery of the Authority’s stra­tegic outcomes.

The Park Author­ity has now adop­ted hybrid work­ing arrange­ments, with the major­ity of our staff work­ing part-time from home and dis­persed loc­a­tions, and part-time in the office. Our Board also holds both hybrid and full face-to-face pub­lic meetings.

A revi­sion of the Busi­ness Con­tinu­ity Plan is pri­or­it­ised for 2026⁄27.

Con­clu­sion As Account­able Officer I am respons­ible for review­ing the effect­ive­ness of the sys­tem of intern­al con­trol. In order to do this my review is informed by: a) the exec­ut­ive man­agers with­in the organ­isa­tion who have respons­ib­il­ity for the devel­op­ment and main­ten­ance of the intern­al con­trol frame­work and who provide assur­ance on sys­tems with­in reg­u­lar Seni­or Man­age­ment Team meet­ings b) intern­al mon­it­or­ing of con­trol sys­tems by staff against SPFM require­ments c) the work of the intern­al aud­it­ors, who sub­mit reg­u­lar reports to the Audit and Risk Com­mit­tee, which include the Head of Intern­al Audit’s inde­pend­ent and object­ive opin­ion on the adequacy and effect­ive­ness of our sys­tems of intern­al con­trol togeth­er with recom­mend­a­tions for improve­ment d) com­ments made by the extern­al aud­it­ors in their man­age­ment let­ter and oth­er reports.

I am sup­por­ted by the Deputy Chief Exec­ut­ive and Dir­ect­or of Cor­por­ate Ser­vices, who in turn is sup­por­ted by the Cor­por­ate Ser­vices staff group, and provides seni­or man­age­ment lead­er­ship on the fin­an­cial man­age­ment, intern­al con­trols and gov­ernance arrange­ments. I take assur­ance from the effect­ive­ness of intern­al con­trol sys­tems, fin­an­cial man­age­ment and plan­ning pro­cesses, and risk man­age­ment from the assur­ances received from the Dir­ect­or of Cor­por­ate Ser­vices and Deputy Chief Executive.

Page 66 of 122

I have also been advised on the effect­ive­ness of the sys­tem of intern­al con­trol by the Board and its Audit and Risk Com­mit­tee. Appro­pri­ate action is taken against any weak­nesses iden­ti­fied and to ensure con­tinu­ous improve­ment of our systems.

The intern­al auditor’s annu­al report for 2025⁄26 states that:

We are sat­is­fied that suf­fi­cient intern­al audit work has been under­taken to allow us to draw a con­clu­sion as to the adequacy and effect­ive­ness of the Organisation’s risk man­age­ment, con­trol and gov­ernance processes.

In our opin­ion, the Organ­isa­tion did have adequate and effect­ive risk man­age­ment, con­trol and gov­ernance pro­cesses to man­age its achieve­ment of the Organisation’s object­ives at the time of our audit work. In our opin­ion, the Organ­isa­tion has prop­er arrange­ments to pro­mote and secure value for money.

We note that we provided a weak level of assur­ance regard­ing the Fol­low Up Review which will be fol­lowed up dur­ing the 2026⁄27 Intern­al Audit Plan.

Our field­work was car­ried out between Novem­ber 2025 and April 2026, and we have not under­taken any fur­ther intern­al audit assign­ments at the time of this report.

Action con­tin­ues to imple­ment improve­ments required to mit­ig­ate risk areas iden­ti­fied by intern­al audit, and on such, I also take assur­ance from reports from the Seni­or Man­age­ment Team and from our inde­pend­ent intern­al aud­it­or on pro­gress made in imple­ment­ing planned improve­ments to the con­trol framework.

The sys­tems described in this state­ment have been in place for the year under review (2025÷26) and up to the date of approv­al of the annu­al report and accounts.

Grant Moir Chief Exec­ut­ive and Account­able Officer 09 Octo­ber 2026

Page 67 of 122

2.3 Remu­ner­a­tion and Staff Report

The Remu­ner­a­tion and Staff Report sets out the Authority’s remu­ner­a­tion policy for dir­ect­ors, reports on how the policy has been imple­men­ted and sets out the amounts awar­ded to dir­ect­ors. It iden­ti­fies those tables and inform­a­tion sub­ject to audit or not. Where inform­a­tion dis­closed is not sub­ject to audit, it is reviewed by the extern­al aud­it­or to ensure it is con­sist­ent with the fin­an­cial statements.

Pay policy (not sub­ject to audit) The fees and expenses paid to Board mem­bers com­ply with guid­ance issued by Scot­tish Min­is­ters and the Pub­lic Sec­tor Pay Policy for Seni­or Appoint­ments, through the Park Authority’s inter­ac­tion with appro­pri­ate Scot­tish Gov­ern­ment offi­cials with­in the remit of these Pub­lic Sec­tor Pay Policies.

Staff salary levels, includ­ing that of the Chief Exec­ut­ive, are reviewed by the Resources Com­mit­tee, as is the over­all pay remit estab­lished by the Park Author­ity. The pay remit is sub­ject to agree­ment with the spon­sor­ing depart­ment with­in Scot­tish Gov­ern­ment, the Envir­on­ment and Forestry Dir­ect­or­ate, Nat­ur­al Resources Divi­sion, in con­sulta­tion with the Scot­tish Gov­ern­ment Fin­ance Pay Policy Team. Approv­al is nor­mally giv­en annu­ally unless a multi-year arrange­ment has been agreed. The remit for 2025⁄26 was agreed, ori­gin­ally as part of a multi-year set­tle­ment cov­er­ing the peri­ods 2024⁄25, 2025⁄26 and 2026⁄27, and sub­sequently amended in order to address cost of liv­ing pres­sures, and align­ment with bench­mark com­par­at­ors. The amended awards were approved by Scot­tish Government’s Remu­ner­a­tion Committee.

Mem­bers of staff covered by this report hold appoint­ments that are either open-ended or fixed term. Early ter­min­a­tion, oth­er than for mis­con­duct, would res­ult in the indi­vidu­al receiv­ing compensation.

Per­form­ance management (not sub­ject to audit) Per­form­ance of all staff mem­bers is mon­itored and reviewed through the staff apprais­al arrangements.

Per­form­ance man­age­ment is achieved by reg­u­lar and fre­quent Per­form­ance Devel­op­ment Con­ver­sa­tions (PDCs) through­out the year between all staff and their line man­ager, giv­ing ​“real-time” and two-way feed­back. The feed­back is to help

Page 68 of 122

staff act and work more con­struct­ively to sup­port their growth, and is expec­ted to be an appro­pri­ate mix of ​“recog­ni­tion” (acknow­ledging strengths and skill that have con­trib­uted to suc­cess) or ​“guid­ance” (giv­en with the inten­tion of increas­ing effect­ive­ness or suc­cess in the future).The PDCs are fre­quent, ​“in the moment” and in per­son, strength­en­ing the work­ing rela­tion­ship between staff and their line-man­agers, and rein­for­cing the mean­ing­ful­ness of the feed­back giv­en through imme­di­acy of con­nec­tion to the per­form­ance to which the feed­back is linked.

The PDCs policy has been designed to be a key tool in achiev­ing optim­al oper­a­tion­al effect­ive­ness through­out the Park Author­ity as we acknow­ledge that a high level of organ­isa­tion­al per­form­ance is dir­ectly depend­ent on the skills, tal­ent, engage­ment and well-being our staff.

Staff­ing and recruitment (not sub­ject to audit) The Park Author­ity has a Resources Com­mit­tee, com­pris­ing sev­en Board mem­bers sup­por­ted by rel­ev­ant seni­or staff, which meets through­out the year. Its mem­ber­ship and remit are agreed annu­ally by the Board.

The Committee’s remit includes:

  • over­sight and mon­it­or­ing of the Park Authority’s human resource policies, includ­ing in par­tic­u­lar the pay and grad­ing, per­form­ance apprais­al and the asso­ci­ated per­form­ance related pay sys­tems when appropriate,
  • advising the Dir­ect­or of Cor­por­ate Ser­vices on behalf of the Board on nego­ti­ation of annu­al pay awards,
  • provid­ing an inter­face between staff rep­res­ent­at­ive groups and the Board, and par­ti­cip­a­tion in arbit­rat­ing on staff­ing issues as set out in the Park Authority’s pro­ced­ures, and as oth­er­wise required, and
  • over­sight of recruit­ment of seni­or staff (Dir­ect­ors and Chief Exec­ut­ive) includ­ing agree­ing the job descrip­tions, adverts, and salary, to take respons­ib­il­ity for inter­view­ing and select­ing the suc­cess­ful can­did­ates and seek­ing the endorse­ment of the Board, and, in the case of the Chief Exec­ut­ive, of Scot­tish Ministers.

In under­tak­ing its role, the Com­mit­tee has regard to the fol­low­ing considerations:

  • the need to recruit, retain and motiv­ate suit­ably able and qual­i­fied people to exer­cise their dif­fer­ent responsibilities,

Page 69 of 122

  • to take account of region­al and loc­al vari­ations in labour mar­kets and their impact on the recruit­ment and reten­tion of staff,
  • funds avail­able to the spon­sor­ing depart­ment as set out in the Scot­tish Government’s depart­ment­al expendit­ure limits,
  • to take account of Scot­tish Gov­ern­ment policies for improv­ing pub­lic ser­vices includ­ing the require­ment to meet the out­put tar­gets for the deliv­ery of depart­ment­al ser­vices, and
  • the Scot­tish Government’s Pub­lic Sec­tor Pay Guidance.

For the pur­poses of this report, per­sons in seni­or pos­i­tions hav­ing author­ity or respons­ib­il­ity for dir­ect­ing or con­trolling the major activ­it­ies of the Park Author­ity are taken to com­prise the Board mem­bers, and the Chief Exec­ut­ive and Dir­ect­ors (the Seni­or Man­age­ment Team).

Staff involve­ment (not sub­ject to audit) The Park Author­ity has a Staff Con­sultat­ive For­um (SCF) in place, through which it ensures effect­ive two-way com­mu­nic­a­tions with staff and Pro­spect Trade Uni­on rep­res­ent­at­ives in resolv­ing any issues arising and con­sult­ing on new ini­ti­at­ives. The SCF com­prises a max­im­um of 6 staff rep­res­ent­at­ives, one place amongst these rep­res­ent­at­ives being reserved for a nom­in­ee of staff who are mem­bers of Pro­spect Trade Uni­on with which the Park Author­ity has a vol­un­tary recog­ni­tion agree­ment. Dur­ing 2025⁄26 key mat­ters on which staff were con­sul­ted through the Staff Con­sultat­ive For­um were:

  • Multi-year pay awards for the years com­men­cing 01 April 2024, 01 April 2025, and 01 April 2026.
  • Ana­lys­is of the res­ults of the Best Com­pan­ies survey
  • Devel­op­ment of new policies and strategies, includ­ing Neonat­al Leave Policy; Sab­bat­ic­al Policy; Over­seas Work and Travel Guid­ance; Men’s Health and Well­being Guidance.
  • Health and safety updates from Health and Safety Com­mit­tee, as well as review­ing First Aid Needs Assessment.
  • Over­view of equal­ity mat­ters, includ­ing review of the equal­ity Main­stream­ing and Out­come Report.
  • Review and update of a range of employ­ment policies either fol­low­ing legis­lat­ive changes or owing to organ­isa­tion­al change, includ­ing the Gender

Page 70 of 122

Diversity Policy; Child and Pro­tec­ted Adult Policy; Flexi­time Policy; Job Plan Tem­plate; Pro­ba­tion Policy.

Equal­ity and diversity (not sub­ject to audit) The Park Author­ity is an equal oppor­tun­it­ies employ­er with policies against dis­crim­in­a­tion and to ensure no unfair or illeg­al dis­crim­in­at­ory treat­ment or bar­ri­ers to employ­ment or advance­ment. The Park Author­ity is accred­ited as a Pos­it­ive about Dis­ab­il­ity employ­er and is a Liv­ing Wage employ­er as well as a Young Person’s Guar­ant­or employ­er. It has also achieved LGBT charter accred­it­a­tion at found­a­tion level.

Dur­ing the year, an equal pay audit was car­ried out, using salary levels and staff num­bers as at the 31 March 2026. The audit was designed to assess pay levels in terms of gender equal­ity, as well as all aspects of pay, recruit­ment and pro­mo­tion with­in the Author­ity. We have a num­ber of policies designed to ensure that all mem­bers of staff have equal access to career pro­gres­sion through sup­port for man­aging child­care, main­ten­ance of work-life bal­ance, and flex­ible work­ing arrange­ments. Although the 2025⁄26 gender pay gap has gone up slightly since the pre­vi­ous year, the gender pay gap amongst our staff is on an improv­ing trend, and we have seen a down­ward tra­ject­ory over the past six years, from 17.9% in 2019⁄20 to 14.7% in 2025⁄26. The slight increase in 2025⁄26 is likely due to the fact that 69% of staff appoin­ted in the report­ing peri­od were women, com­pared to 31% male appoint­ments. New appoint­ments are typ­ic­ally placed on or near the band min­im­um. This pro­por­tion will drive a tem­por­ary increase in the gender pay gap calculations.

As an organ­isa­tion we accept we can­not become com­pla­cent and recog­nise that con­tin­ued work and mon­it­or­ing must remain a pri­or­ity. The Equal­ity Advis­ory Pan­el will be key to achiev­ing our equal­it­ies objectives.

Equal­ity Advis­ory Panel (not sub­ject to audit) The Equal­ity Advis­ory Pan­el was estab­lished in Septem­ber 2020 to provide informed, evid­ence-based feed­back, guid­ance, and sup­port to the Author­ity on equal­ity issues. The remit of the pan­el is:

Page 71 of 122

  • to ensure stat­utory pub­lic sec­tor equal­ity duties are delivered in accord­ance with the Equal­ity Act 2010 and oth­er rel­ev­ant legislation,
  • to embed equal­ity and inclu­sion in our strategies and cor­por­ate processes,
  • to assess crit­ic­ally the impact of the Park Authority’s decisions on equal­ity groups, through robust equal­ity impact assess­ment pro­ced­ures, and to provide appro­pri­ate mit­ig­a­tion of adverse impacts,
  • to ensure best prac­tice in equal­ity and inclu­sion in our approaches to work, and
  • to pro­mote equal­ity and inclu­sions work of the Author­ity and part­ners with­in the Park.

Over the course of 2025⁄26, the pan­el has made sig­ni­fic­ant con­tri­bu­tions to vari­ous aspects of the Authority’s work, including:

  • Advising on, and user test­ing, the access­ib­il­ity of the new Park Author­ity website
  • Advising on the Deer Lar­der pro­ject and poten­tial recip­i­ents of pro­duce, includ­ing women’s shelters
  • Advising on the Core Paths Plan reviews and get­ting updates on pro­gress of the review, including:
  • Advising on, and review of, the access­ib­il­ity audit
  • Inform­ing research about enga­ging with under­rep­res­en­ted groups
  • Dis­cuss­ing cor­rel­a­tion with the lived exper­i­ence panel
  • advising on the word­ing and con­tent of sev­er­al new policies
  • advising on the most appro­pri­ate word­ing for the equal­it­ies mon­it­or­ing sec­tion of both the Vis­it­or Sur­vey and the Res­id­ent Survey

The Park Author­ity also has an Intern­al Equal­ity, Diversity and Inclu­sion Advocacy Group. The over­arch­ing pur­pose of this group is to cham­pi­on the integ­ra­tion of Equal­ity, Diversity & Inclus­iv­ity prin­ciples into daily work­ing life at the Park Author­ity at an organ­isa­tion­al level, and to give staff from minor­ity groups a suit­able envir­on­ment to share their lived exper­i­ence and inform any changes in cul­ture or policy to facil­it­ate improved diversity and integ­ra­tion. Spe­cific­ally, the group ensures that Equal­ity and Diversity require­ments are suit­ably addressed with­in the organ­isa­tion by rais­ing aware­ness and rein­for­cing the mes­sage that Equal­ity and Diversity is ​“everyone’s busi­ness”. It facil­it­ates com­mu­nic­a­tion, debate and dialogue

Page 72 of 122

relat­ing to Equal­ity and Diversity issues, and seeks to find prac­tic­al solu­tions to any bar­ri­ers that may present them­selves in deliv­er­ing the Authority’s aspir­a­tions and oblig­a­tions around Equal­ity and Diversity. The group meets quarterly and com­prises staff from across the organ­isa­tion. It is an act­ive and engaged group and has car­ried out the fol­low­ing activities:

  • Host­ing a staff drop-in ses­sion to cel­eb­rate LGBT His­tory month
  • Identi­fy­ing and sup­port­ing the devel­op­ment of sev­er­al new equal­it­ies and well­being policies, includ­ing Adult and Child Pro­tec­tion, Men’s Health and Wellbeing
  • Advising on the Park Authority’s response to the con­sulta­tion on the EHRC code or prac­tice revi­sion fol­low­ing the Supreme Court’s rul­ing on the defin­i­tion of sex
  • Scru­tin­ising if any intern­al pro­ced­ures may inad­vert­ently be dis­crim­in­at­ory, and inform­ing change – e.g. com­pas­sion­ate leave has been revised to include non-typ­ic­al fam­ily arrangements
  • Advising on the Fair Work First aspect of the clean­ing con­tract procurement
  • Sup­port­ing the devel­op­ment of con­tent for the equal­it­ies page on the Park Authority’s new website
  • Advising on the Access­ible Paths toolkit
  • Advising on sup­port­ing the Park Authority’s pres­ence at the Inverness Pride fest­ivals in 2025
  • Advising on sev­er­al cor­por­ate Equal­ity Impact Assess­ments, includ­ing for the Core Paths Plan.
  • Dis­cuss­ing and advising on the Equal­it­ies Main­stream­ing Report

Policies for dis­abled people (not sub­ject to audit) The Park Author­ity is accred­ited as a Pos­it­ive about Dis­ab­il­ity employ­er. Policies in place to sup­port people with dis­ab­il­it­ies dur­ing recruit­ment and at work include: Recruit­ment and Selec­tion, Learn­ing and Devel­op­ment and Reas­on­able Adjust­ments Pass­port. Togeth­er, this suite of policies sup­ports dis­abled col­leagues by hav­ing regard to their par­tic­u­lar aptitudes and abil­it­ies, by arran­ging for reas­on­able adjust­ments to the work­place, and by provid­ing oppor­tun­it­ies for train­ing and career development.

Page 73 of 122

The Park Author­ity con­tin­ues to embed its approach to ensur­ing equal­ity. The Park Authority’s 2025 Equal­ity Main­stream­ing and Out­come Report (2025EqualityMainstreamingandOutcomeReportFinal.pdf) com­pre­hens­ively sets out the achieve­ments of the Park Author­ity in our equal­it­ies work to date, togeth­er with our ambi­tious for­ward pro­gramme of work in this key area.

The Park Author­ity won one of the 2025 Her­ald and S1Jobs Top Employ­er Awards for our work on cre­at­ing a diverse and inclus­ive work dynamic.

Ana­lys­is of staff by gender (not sub­ject to audit) At the end of the fin­an­cial and oper­a­tion­al year our gender split of staff, includ­ing staff on short or fixed term employ­ment con­tracts is:

MaleFemalePrefer not to disclose
202620252026202520262025
Chief Exec & Directors44----
Heads of Service5533--
Staff3741746842
4650777142
36%41%61%58%3%2%

Health, safety and wellbeing (not sub­ject to audit) The Park Author­ity has a Health and Safety Com­mit­tee com­pris­ing Insti­tute of Occu­pa­tion­al Safety and Health (IOSH) trained staff from across the organ­isa­tion, who are tasked with scru­tin­ising Health and Safety policy and pro­ced­ure. The com­mit­tee meets quarterly, and minutes are cir­cu­lated to the Resources Com­mit­tee for over­sight and sign off.

The Park Author­ity has a Well­being Cham­pi­on, tasked with scru­tin­ising and updat­ing well­being policies and pro­ced­ures. They cir­cu­late a two-weekly well­being intranet post dis­cuss­ing key top­ics, nation­al cam­paigns and provid­ing links to sup­port resources. The Park Author­ity also has a team of Men­tal Health First Aid­ers and a Men­tal Health First Aid Policy to sup­port staff. The organ­isa­tion employs a hybrid work­ing approach, the default pos­i­tion being that staff can work 50%

Page 74 of 122

con­trac­tu­al hours from home and 50% in the office. In addi­tion, on 1 April 2024 we reduced full-time con­trac­tu­al hours from 36 to 35 hours per week.

Remu­ner­a­tion and Pensions Some ele­ments of the fol­low­ing inform­a­tion on the Park Authority’s remu­ner­a­tion and pen­sions arrange­ments are sub­ject to audit. The audit cov­er­age is indic­ated in each sub-heading.

Page 75 of 122

Board mem­bers’ fees and expenses (not sub­ject to audit) The Park Author­ity has a non-exec­ut­ive Board, and no mem­ber has any pen­sion enti­tle­ment. The expenses dis­closed below are not sub­ject to audit. A register of Board member’s interests can be found on the Nation­al Park’s website.

Start of cur­rent termEnd of cur­rent term2026 Fees £’0002026 Expenses £2025 Fees £’0002025 Expenses £
Scot­tish Gov­ern­ment appointees
Sandy Brem­ner26 05 2325 05 2735 – 402,96230 – 356,829
Jack­ie Brierton01 06 2431 05 285 – 101,7965 – 101,383
Peter Cos­grove08 09 2307 09 275 – 10285 – 10104
Hanna Grist26 05 2325 05 275 – 109745 – 101,730
Dr F McLean01 11 2231 10 265 – 103685 – 10310
Steve Mickle­wright26 05 2325 05 275 – 103225 – 10-
Duncan Miller09 11 2308 11 275 – 1005 – 10-
Loc­al Author­it­ies nominees
Chris Beat­tie (Angus)01 10 2213 06 250 – 5010 – 15907
Ian McLar­en (Angus)22 09 2530 09 270 – 5728--
Geva Black­ett (Aber­deen­shire)31 03 1930 09 275 – 102195 – 10276
Rus­sell Jones (High­land)01 10 2230 09 2710 – 1505 – 1096
Bill Lob­ban (High­land)01 10 2230 09 275 – 1005 – 10-
Xan­der McDade (Perth & Kinross)01 10 2230 09 24000 – 51,212
Ann Ross (Aber­deen­shire)01 10 2230 09 275 – 103925 – 10246
Derek Ross (Moray)01 10 2231 10 275 – 104605 – 10353
Michael Wil­li­am­son (Perth & Kinross)01 10 2431 10 275 – 107100 – 5190
Loc­ally elec­ted members
Kenny Deans (ward 1)23 03 2323 03 275 – 103725 – 10543
Paul Gibb (ward 5)23 03 2323 03 275 – 108695 – 10524
John Kirk (ward 3)28 03 1923 03 275 – 1005 – 10-
Lauren Mac­Cal­lum (ward 2)23 03 2323 03 275 – 1005 – 10-
Elean­or Mack­in­tosh (ward 4)28 03 1923 03 2715 – 2079110 – 15465
10,99115,168

Page 76 of 122

Board mem­bers’ Attend­ance at Meetings (not sub­ject to audit)

Form­al (5)Board Busi­ness (11)Plan­ning (8)Com­mit­tees
Scot­tish Gov­ern­ment appointees
Sandy Brem­ner41071/1G 4/4P 3/4R
Jack­ie Brierton51072/2[sub]P 3/4R
Peter Cos­grove5982/2A 1/1[sub]G
Han­nah Grist4971/1[sub]P 3/4R
Dr Fiona McLean5984/4A 0/1G
Steve Mickle­wright4653/4P
Duncan Miller5984/4A
Loc­al Author­ity nominees
Chris Beat­tie0121/1G 0/1P 1/1R
Ian McLar­en4742/2A 2/2R
Geva Black­ett2462/4R
Rus­sell Jones51081/1G 1/1[sub]P 3/4R
Bill Lob­ban5863/4A
Anne Ross3883/4P
Derek Ross4984/4R
Michael Wil­li­am­son3963/4P
Loc­ally elected
Kenny Deans4761/1G 4/4P 1/1[sub]R
Paul Gibb41074/4A
John Kirk51081/1[sub]A 3/4P
Lauren Mac­Cal­lum51184/4R
Elean­or Mackintosh51181/1G 4/4P

(Oth­er com­mit­tees: P – Per­form­ance Com­mit­tee; AR — Audit and Risk Com­mit­tee; R – Resource; G – Gov­ernance Com­mit­tee; [sub] = substitute).

Page 77 of 122

Seni­or Man­age­ment Team salary and pen­sion entitlements (sub­ject to audit) The Con­sti­tu­tion­al Reform and Gov­ernance Act 2010 requires appoint­ments to be made on mer­it and on the basis of fair and open com­pet­i­tion. The mem­bers of the Seni­or Man­age­ment Team hold appoint­ments that are open ended. Early ter­min­a­tion, oth­er than for mis­con­duct, would res­ult in the indi­vidu­al requir­ing com­pens­a­tion as set out in the Civil Ser­vice Com­pens­a­tion Scheme.

The fol­low­ing sec­tions provide details of the remu­ner­a­tion and pen­sion interests of the Seni­or Man­age­ment Team of the Park Authority.

Seni­or Man­age­ment Team remuneration (sub­ject to audit) Single total fig­ure of remu­ner­a­tion (sub­ject to audit)

Salary 2025⁄26 £’000Salary 2024⁄25 £’000Pen­sion bene­fits* 2025⁄26 £’000Pen­sion bene­fits* 2024⁄25 £’000Total 2025⁄26 £’000Total 2024⁄25 £’000
Grant Moir115 – 12095 – 1004446155 – 160145 – 150
Dav­id Cameron85 – 9080 – 852983110 – 115165 – 170
Andrew Ford75 – 8070 – 753962115 – 120135 – 140
Gav­in Miles70 – 7565 – 7039103110 – 115170 – 175
Mur­ray Ferguson-5 – 10-2-5 – 10

*The value of pen­sion bene­fits accrued dur­ing the year is cal­cu­lated as the real increase in pen­sion mul­ti­plied by 20, plus the real increase in any lump sum, less the con­tri­bu­tions made by the indi­vidu­al. The real increases exclude increases due to infla­tion or any increase or decrease due to a trans­fer of pen­sion rights.

No mem­ber of the Seni­or Man­age­ment Team received either a bonus pay­ment or any bene­fits in kind in the year (2024÷25: £nil).

Fair pay disclosure (sub­ject to audit) The Park Author­ity is required to dis­close the rela­tion­ship between the total remu­ner­a­tion of its highest paid dir­ect­or and the medi­an remu­ner­a­tion of its staff (the mid-point of ban­ded remu­ner­a­tion, using the full-time equi­val­ent remu­ner­a­tion). Total remu­ner­a­tion includes salary, non-con­sol­id­ated per­form­ance-related pay, and any bene­fits-in-kind and sev­er­ance pay­ments. It does not include employ­er pen­sion con­tri­bu­tions and the cash equi­val­ent value of pensions.

Page 78 of 122

The highest paid dir­ect­or for the pur­pose of this com­par­is­on is the Chief Exec­ut­ive Officer.

The highest paid Director’s salary was increased by £15,440 (15.5%) between 2024⁄25 and 2025⁄26 as a res­ult of the Scot­tish Government’s pub­lic sec­tor pay award. For the rest of the Park Authority’s staff, on 31 March 2026 the aver­age salary change from the pre­vi­ous year was an increase of 5% (2024÷25: increase of 1%) reflect­ing the cohort of sea­son­al staff, the change in staff mix and the change in head­count year on year. Exclud­ing sea­son­al staff, the aver­age salary increased by 6% (2024÷25: increase by 4%).

2025⁄262024⁄25
Medi­an remu­ner­a­tion £ (a)39,52537,880
Ban­ded remu­ner­a­tion highest paid dir­ect­or £’000 (b)115 – 12095 – 100
Ratio between the medi­an remu­ner­a­tion and ban­ded remu­ner­a­tion of the highest dir­ect­or [(b)/(a)]2.972.57
Range of remu­ner­a­tion (expressed as annu­al­ised whole time equi­val­ent values)
Lower £24,89722,837
Upper £’000 (remu­ner­a­tion of highest paid director)115 – 12095 – 100

The table below shows the ratios between the highest paid director’s remu­ner­a­tion against those of all employ­ees on the 25th, 50th (medi­an) and 75th per­cent­iles dur­ing the fin­an­cial years.

Page 79 of 122

All staff Pay Ratios

2025⁄26 All staff2025⁄26 Exclud­ing sea­son­al2024⁄25 All staff2024⁄25 Exclud­ing seasonal
25th per­cent­ile
Ratio between the highest paid dir­ect­ors’ salary and the 25th percentile3.423.263.042.90
25th per­cent­ile salary£34,339£36,011£32,085£33,649
50th per­cent­ile
Ratio between the highest paid dir­ect­ors’ salary and the median2.972.832.572.44
Medi­an salary£39,525£41,460£37,880£39,939
75th per­cent­ile
Ratio between the highest paid dir­ect­ors’ salary and the 75th percentile2.532.432.182.12
75th per­cent­ile salary£46,460£48,330£44,686£46,037

The changes repor­ted arise from a com­plex mix of factors includ­ing a change in the highest paid director’s remu­ner­a­tion, the impact on the payroll mod­el of pay awards in a peri­od of high infla­tion, and a con­tin­ued trend in the need to offer remu­ner­a­tion to more exper­i­enced new recruits towards the top of their pay band. The Author­ity believes that the ratios are a fair reflec­tion of the pay, rewards and pro­gres­sion policy for the staff group as a whole.

No mem­ber of staff received remu­ner­a­tion in excess of the highest paid dir­ect­or in either year.

Civil Ser­vice Pensions (sub­ject to audit) Pen­sion bene­fits are provided through the Civil Ser­vice pen­sion arrange­ments. Before 1 April 2015, the only scheme was the Prin­cip­al Civil Ser­vice Pen­sion Scheme (PCSPS), which is divided into a few dif­fer­ent sec­tions – clas­sic, premi­um, and

Page 80 of 122

clas­sic plus — provide bene­fits on a final salary basis, whilst nuvos provides bene­fits on a career aver­age basis. From 1 April 2015 a new pen­sion scheme for civil ser­vants was intro­duced – the Civil Ser­vants and Oth­ers Pen­sion Scheme or ​‘alpha’, which provides bene­fits on a career aver­age basis. All newly appoin­ted civil ser­vants, and the major­ity of those already in ser­vice, joined the new scheme.

The PCSPS and alpha are unfun­ded stat­utory schemes. Employ­ees and employ­ers make con­tri­bu­tions (employ­ee con­tri­bu­tions range between 4.6% and 8.05%, depend­ing on salary). The bal­ance of the cost of bene­fits in pay­ment is met by mon­ies voted by Par­lia­ment each year. Pen­sions in pay­ment are increased annu­ally in line with the Pen­sions Increase legis­la­tion. Instead of the defined bene­fit arrange­ments, employ­ees may opt for a defined con­tri­bu­tion pen­sion with an employ­er con­tri­bu­tion: the ​‘part­ner­ship’ pen­sion account.

In the alpha scheme, pen­sion builds up at a rate of 2.32% of pen­sion­able earn­ings each year, and the total amount accrued is adjus­ted annu­ally in line with a rate set by HM Treas­ury. Mem­bers may opt to give up (com­mute) pen­sion for a lump sum up to the lim­its set by the Fin­ance Act 2004. All mem­bers who switched to alpha from the PCSPS had their PCSPS bene­fits ​‘banked’, with those with earli­er bene­fits in one of the final salary sec­tions of the PCSPS hav­ing those bene­fits based on their final salary when they leave alpha.

The accrued pen­sions shown in this report are the pen­sion the mem­ber is entitled to receive when they reach nor­mal pen­sion age, or imme­di­ately on ceas­ing to be an act­ive mem­ber of the scheme if they are already at or over nor­mal pen­sion age. Nor­mal pen­sion age is 60 for mem­bers of clas­sic, premi­um, and clas­sic plus, 65 for mem­bers of nuvos, and the high­er of 65 or State Pen­sion Age for mem­bers of alpha. The pen­sion fig­ures in this report show pen­sion earned in PCSPS or alpha – as appro­pri­ate. Where a mem­ber has bene­fits in both the PCSPS and alpha, the fig­ures show the com­bined value of their bene­fits in the two schemes but note that the con­stitu­ent parts of that pen­sion may be pay­able from dif­fer­ent ages.

When the Gov­ern­ment intro­duced new pub­lic ser­vice pen­sion schemes in 2015, there were trans­ition­al arrange­ments that treated exist­ing scheme mem­bers dif­fer­ently based on their age. Older mem­bers of the PCSPS remained in that scheme, rather than mov­ing to alpha. In 2018, the Court of Appeal found that the

Page 81 of 122

trans­ition­al arrange­ments in the pub­lic ser­vice pen­sion schemes unlaw­fully dis­crim­in­ated against young­er mem­bers (the ​“McCloud judg­ment”). As a res­ult, steps are being taken to rem­edy those 2015 reforms, mak­ing the pen­sion scheme pro­vi­sions fair to all mem­bers. The Pub­lic Ser­vice Pen­sions Rem­edy is made up of two parts. The first part closed the PCSPS on 31 March 2022, with all act­ive mem­bers becom­ing mem­bers of alpha from 1 April 2022. The second part removes the age dis­crim­in­a­tion for the rem­edy peri­od, between 1 April 2015 and 31 March 2022, by mov­ing the mem­ber­ship of eli­gible mem­bers dur­ing this peri­od back into the PCSPS on 1 Octo­ber 2023.

The accrued pen­sion bene­fits, Cash Equi­val­ent Trans­fer Value and single total fig­ure of remu­ner­a­tion repor­ted for any indi­vidu­al affected by the Pub­lic Ser­vice Pen­sions Rem­edy have been cal­cu­lated based on their inclu­sion in the PCSPS for the peri­od between 1 April 2015 and 31 March 2022, fol­low­ing the McCloud judg­ment. The Pub­lic Ser­vice Pen­sions Rem­edy applies to indi­vidu­als that were mem­bers, or eli­gible to be mem­bers, of a pub­lic ser­vice pen­sion scheme on 31 March 2012 and were mem­bers of a pub­lic ser­vice pen­sion scheme between 1 April 2015 and 31 March 2022. The basis for the cal­cu­la­tion reflects the leg­al pos­i­tion that impacted mem­bers have been rolled back into the PCSPS for the rem­edy peri­od and that this will apply unless the mem­ber act­ively exer­cises their enti­tle­ment on retire­ment to decide instead to receive bene­fits cal­cu­lated under the terms of the alpha scheme for the peri­od from 1 April 2015 to 31 March 2022

The part­ner­ship pen­sion account is an occu­pa­tion­al defined con­tri­bu­tion pen­sion arrange­ment which is part of the Leg­al & Gen­er­al Mas­ter trust. The employ­er makes a basic con­tri­bu­tion of between 8% and 14.75% (depend­ing on the age of the mem­ber). The employ­ee does not have to con­trib­ute but, where they do make con­tri­bu­tions, the employ­er will match these up to a lim­it of 3% of pen­sion­able salary (in addi­tion to the employer’s basic con­tri­bu­tion). Employ­ers also con­trib­ute a fur­ther 0.5% of pen­sion­able salary to cov­er the cost of cent­rally provided risk bene­fit cov­er (death in ser­vice and ill health retirement).

Fur­ther details about the Civil Ser­vice pen­sion arrange­ments can be found at the web­site www​.civilser​vi​cepen​sion​s​cheme​.org​.uk

Page 82 of 122

The Cash Equi­val­ent Trans­fer Value (CETV) (sub­ject to audit) A Cash Equi­val­ent Trans­fer Value (CETV) is the actu­ar­ially assessed cap­it­al­ised value of the pen­sion scheme bene­fits accrued by a mem­ber at a par­tic­u­lar point in time. The bene­fits val­ued are the member’s accrued bene­fits and any con­tin­gent spouse’s pen­sion pay­able from the scheme. A CETV is a pay­ment made by a pen­sion scheme or arrange­ment to secure pen­sion bene­fits in anoth­er pen­sion scheme or arrange­ment when the mem­ber leaves a scheme and chooses to trans­fer the bene­fits accrued in their former scheme. The pen­sion fig­ures shown relate to the bene­fits that the indi­vidu­al has accrued as a con­sequence of their total mem­ber­ship of the pen­sion scheme, not just their ser­vice in a seni­or capa­city to which dis­clos­ure applies.

The fig­ures include the value of any pen­sion bene­fit in anoth­er scheme or arrange­ment which the mem­ber has trans­ferred to the Civil Ser­vice pen­sion arrange­ments. They also include any addi­tion­al pen­sion bene­fit accrued to the mem­ber as a res­ult of their buy­ing addi­tion­al pen­sion bene­fits at their own cost.

CETVs are worked out in accord­ance with The Occu­pa­tion­al Pen­sion Schemes (Trans­fer Val­ues) (Amend­ment) Reg­u­la­tions 2008 and do not take account of any actu­al or poten­tial reduc­tion to bene­fits res­ult­ing from Life­time Allow­ance Tax which may be due when pen­sion bene­fits are taken.

The real increase in the value of the CETV (sub­ject to audit) This reflects the increase in CETV that is fun­ded by the employ­er. It does not include the increase in accrued pen­sion due to infla­tion or con­tri­bu­tions paid by the employ­ee (includ­ing the value of any bene­fits trans­ferred from anoth­er pen­sion scheme or arrange­ment) and uses com­mon mar­ket valu­ation factors for the start and end of the period.

Page 83 of 122

Seni­or Man­age­ment Team pen­sion benefits (sub­ject to audit)

Accrued pen­sion at age 65 as at 31 03 2026 £’000Real increase in pen­sion and related lump sum at pen­sion age £’000CETV at 31 03 2026 £’000CETV at 31 03 2025 £’000Real increase in CETV £’000
Grant Moir30 — 352.5 — 543339126
Dav­id Cameron50 — 550 – 2.51,1531,09121
Andrew Ford25 — 300 – 2.556450230
Gav­in Miles25 – 300 – 2.552446630

Accrued pen­sion bene­fits included in this table for any indi­vidu­al affected by the Pub­lic Ser­vice Pen­sions Rem­edy have been cal­cu­lated based on their inclu­sion in the leg­acy scheme for the peri­od between 1 April 2015 and 31 March 2022, fol­low­ing the McCloud judg­ment. The Pub­lic Ser­vice Pen­sions Rem­edy applies to indi­vidu­als who were mem­bers, or eli­gible to be mem­bers, of a pub­lic ser­vice pen­sion scheme on 31 March 2012 and were mem­bers of a pub­lic ser­vice pen­sion scheme between 1 April 2015 and 31 March 2022. The basis for the cal­cu­la­tion reflects the leg­al pos­i­tion that impacted mem­bers have been rolled back into the rel­ev­ant leg­acy scheme for the rem­edy peri­od and that this will apply unless the mem­ber act­ively exer­cises their enti­tle­ment on retire­ment to decide instead to receive bene­fits cal­cu­lated under the terms of the Alpha scheme for the peri­od from 1 April 2015 to 31 March 2022.

Page 84 of 122

Staff costs and Board Mem­bers’ Fees (sub­ject to audit)

Per­man­ently employed staff and Board Mem­bers £’000Oth­ers £’000Total 2026 £’000Total 2025 £’000
Board mem­bers214-214195
Staff5,6281,4227,0506,249
Agency or short-term staff-13513599
5,8421,5577,3996,543
Board mem­bers
Fees198-198190
Social secur­ity costs16-165
214-214195
Staff
Salar­ies3,9711,0535,0244,536
Social secur­ity costs528132660467
Pen­sions1,1272371,3641,235
Appren­tice­ship levy2-211
5,6281,4227,0506,249
Non-payroll staff-13513599

Num­ber of staff with salar­ies above £60,000 (sub­ject to audit)

20262025
£115,000 — £120,0001-
£90,001 — £100,00001
£80,001 — £90,00011
£70,001 — £80,00021
£60,001 — £70,00077

Exit pack­ages (sub­ject to audit) We have a policy of no com­puls­ory redund­ancy, in accord­ance with Pub­lic Sec­tor Pay Policy set out by Scot­tish Gov­ern­ment. No exit pack­ages were paid in the year (2024÷25 – none).

Page 85 of 122

Con­sultancy and tem­por­ary staff (sub­ject to audit)

2026 £’0002025 £’000
Con­sultancy020
Tem­por­ary staff13598

Con­sultancy has a wide-ran­ging mean­ing and includes the pro­vi­sion to the Park Author­ity of object­ive advice on a range of man­age­ment issues out­side the ​‘busi­ness-as-usu­al’ envir­on­ment, when in-house skills are not avail­able. The type of work under­taken includes the pro­vi­sion of advice on fin­ance, IT, strategy, leg­al, prop­erty & con­struc­tion, HR & train­ing, and tech­nic­al mat­ters, and is time limited.

Tem­por­ary staff, or con­tin­gent labour, are ​‘non-payroll’ indi­vidu­als con­trac­ted to cov­er busi­ness-as-usu­al or ser­vice deliv­ery. The type of work under­taken was the pro­vi­sion of com­mu­nic­a­tions expert­ise not avail­able with­in the Park Author­ity, and the engage­ment of tem­por­ary staff to cov­er a key vacancy.

Aver­age num­ber of per­sons employed (sub­ject to audit) The aver­age num­ber of whole-time equi­val­ent per­sons employed dur­ing the year was:

Per­man­ently employed staffOth­ers*Total 2026Total 2025
Seni­or man­age­ment team4-44
Staff (whole time equivalent)8230112107
8630116111

*Oth­er staff are those staff employed on a fixed short-term con­tract and inward secondees.

Off payroll appointments (sub­ject to audit) Dur­ing the year, one mem­ber of staff was seconded to the Park Author­ity from The South of Scot­land Enter­prise (2024÷25: 1). This engage­ment was for a ​‘highly paid off-payroll work­er’ as defined by the FreM. It was made for a total peri­od of 18 months from July 2024 and ended dur­ing the year in Novem­ber 2025. The indi­vidu­al was not sub­ject to off-payroll legislation.

Page 86 of 122

No mem­bers of the staff were seconded to oth­er organ­isa­tions dur­ing the year (2024÷25: nil).

Dur­ing the year, in addi­tion to the second­ment men­tioned above, there was one fur­ther off-payroll work­er earn­ing £245 or great­er. This arrange­ment was not caught by IR35. The type of work under­taken was the pro­vi­sion of com­mu­nic­a­tions expert­ise not avail­able with­in the Park Author­ity. This was the only exist­ing engage­ment as at 31 March 2026. At the time of report­ing, this engage­ment has exis­ted for more than 4 years.

Sick­ness absence (not sub­ject to audit) The aver­age num­bers of days lost to sick­ness absence dur­ing the year per employ­ee, exclud­ing COV­ID 19 absences, was 4.47 days (2024÷25: 4.54); includ­ing COV­ID 19 absences, was 4.55 days (2024÷25: 4.84). 2025⁄26 will be the final year for the col­lec­tion of data on COV­ID absences.

Staff turnover (not sub­ject to audit) Staff turnover (exclud­ing sea­son­al employ­ment) was 7.0% as com­pared with 5.4% in 2024 – 25, and 7.0% in 2023 – 24.

Page 87 of 122

2.4 Par­lia­ment­ary Account­ab­il­ity Disclosures

(sub­ject to audit) Cairngorms Nation­al Park Author­ity is held to account by the Scot­tish Min­is­ters, in accord­ance with the require­ments of The Nation­al Parks (Scot­land) Act 2000. The Author­ity is expec­ted to man­age its budget in accord­ance with its Fin­an­cial Memor­andum and the Scot­tish Pub­lic Fin­ance Manu­al and to deliv­er an out­turn for the year with­in the Scot­tish Gov­ern­ment budget limits.

The Park Authority’s fin­an­cial per­form­ance for the year against the Board approved budget and grant-in-aid awar­ded by the Scot­tish Gov­ern­ment is shown on page 20. Income for 2025⁄26 includes income and grant fund­ing from part­ners, recharges, and plan­ning fees. Expendit­ure includes Board and staff costs, oper­at­ing costs, and pro­ject expendit­ure. Non-cash expendit­ure includes depre­ci­ation and amort­isa­tion, and move­ment in the accru­al for hol­i­day pay.

Fees and charges Dur­ing the year, the Park Author­ity received 60% of plan­ning fees for called-in plan­ning applic­a­tions to the 5 loc­al author­it­ies with­in the Nation­al Park boundaries.

Losses and spe­cial payments There were no repor­ted frauds dur­ing the year to 31 March 2026. There were no spe­cial pay­ments in the year, or in the pre­vi­ous year. There were no gains or losses on the dis­pos­al of non-cur­rent assets in the year or in the pre­vi­ous year.

Gifts No gifts were made to Board mem­bers leav­ing dur­ing the year. (2024÷25: £60)

Sig­ni­fic­ant remote contingencies In addi­tion to con­tin­gent liab­il­it­ies repor­ted with­in the con­text of IAS 37, the Park Author­ity is not aware of any liab­il­it­ies for which the like­li­hood of a trans­fer of eco­nom­ic bene­fit in set­tle­ment is too remote to meet the defin­i­tion of a con­tin­gent liability.

Page 88 of 122

The account­ab­il­ity report was approved by a duly author­ised com­mit­tee of the Board on 02 Octo­ber 2026 and signed on its behalf by

Grant Moir Chief Exec­ut­ive and Account­able Officer 09 Octo­ber 2026

Page 89 of 122

Inde­pend­ent auditor’s report to the mem­bers of

Cairngorms Nation­al Park Author­ity and the Aud­it­or Gen­er­al for Scot­land and the Scot­tish Parliament

Report­ing on the audit of the fin­an­cial statements Opin­ion on fin­an­cial statements We have audited the fin­an­cial state­ments in the annu­al report and accounts of Cairngorms Nation­al Park Author­ity for the year ended 31 March 2026 under the Nation­al Parks (Scot­land) Act 2000. The fin­an­cial state­ments com­prise the State­ment of Com­pre­hens­ive Net Expendit­ure, the State­ment of Fin­an­cial Pos­i­tion, the State­ment of Cash Flows, the State­ment of Changes in Tax­pay­ers’ Equity and notes to the fin­an­cial state­ments, includ­ing mater­i­al account­ing policy inform­a­tion. The fin­an­cial report­ing frame­work that has been applied in their pre­par­a­tion is applic­able law and UK adop­ted inter­na­tion­al account­ing stand­ards, as inter­preted and adap­ted by the 2025⁄26 Gov­ern­ment Fin­an­cial Report­ing Manu­al (the 2025⁄26 FReM).

In our opin­ion the accom­pa­ny­ing fin­an­cial statements:

  • give a true and fair view of the state of the body’s affairs as at 31 March 2026 and of its net expendit­ure for the year then ended;
  • have been prop­erly pre­pared in accord­ance with UK adop­ted inter­na­tion­al account­ing stand­ards, as inter­preted and adap­ted by the 2025⁄26 FReM; and
  • have been pre­pared in accord­ance with the require­ments of the Nation­al Parks (Scot­land) Act 2000 and dir­ec­tions made there­un­der by the Scot­tish Ministers.

Basis for opinion We con­duc­ted our audit in accord­ance with applic­able law and Inter­na­tion­al Stand­ards on Audit­ing (UK) (ISAs (UK)), as required by the Code of Audit Prac­tice approved by the Aud­it­or Gen­er­al for Scot­land. Our respons­ib­il­it­ies under those stand­ards are fur­ther described in the auditor’s respons­ib­il­it­ies for the audit of the fin­an­cial state­ments sec­tion of our report. We were appoin­ted by the Aud­it­or Gen­er­al on 18 May 2022. Our peri­od of appoint­ment is five years, cov­er­ing 2022⁄23 to 2026⁄27. We are inde­pend­ent of the body in accord­ance with the eth­ic­al require­ments that are rel­ev­ant to our audit of the fin­an­cial state­ments in the UK includ­ing the Fin­an­cial Report­ing Council’s Eth­ic­al Stand­ard, and we have ful­filled our oth­er eth­ic­al respons­ib­il­it­ies in accord­ance with these require­ments. Non-audit ser­vices pro­hib­ited by the Eth­ic­al Stand­ard were not provided to the body.

We believe that the audit evid­ence we have obtained is suf­fi­cient and appro­pri­ate to provide a basis for our opinion.

Con­clu­sions relat­ing to going con­cern basis of accounting We have con­cluded that the use of the going con­cern basis of account­ing in the pre­par­a­tion of the fin­an­cial state­ments is appropriate.

Based on the work we have per­formed, we have not iden­ti­fied any mater­i­al uncer­tain­ties relat­ing to events or con­di­tions that, indi­vidu­ally or col­lect­ively, may cast sig­ni­fic­ant doubt on the body’s abil­ity to con­tin­ue to

Page 90 of 122

adopt the going con­cern basis of account­ing for a peri­od of at least twelve months from when the fin­an­cial state­ments are author­ised for issue.

These con­clu­sions are not inten­ded to, nor do they, provide assur­ance on the body’s cur­rent or future fin­an­cial sus­tain­ab­il­ity. How­ever, we report on the body’s arrange­ments for fin­an­cial sus­tain­ab­il­ity in a sep­ar­ate Annu­al Audit Report avail­able from the Audit Scot­land Website.

Risks of mater­i­al misstatement We report in our sep­ar­ate Annu­al Audit Report the most sig­ni­fic­ant assessed risks of mater­i­al mis­state­ment that we iden­ti­fied and our judge­ments thereon.

Respons­ib­il­it­ies of the Account­able Officer for the fin­an­cial statements As explained more fully in the State­ment of Account­able Officer’s Respons­ib­il­it­ies, the Account­able Officer is respons­ible for the pre­par­a­tion of fin­an­cial state­ments that give a true and fair view in accord­ance with the fin­an­cial report­ing frame­work, and for such intern­al con­trol as the Account­able Officer determ­ines is neces­sary to enable the pre­par­a­tion of fin­an­cial state­ments that are free from mater­i­al mis­state­ment, wheth­er due to fraud or error.

In pre­par­ing the fin­an­cial state­ments, the Account­able Officer is respons­ible for assess­ing the body’s abil­ity to con­tin­ue as a going con­cern, dis­clos­ing, as applic­able, mat­ters related to going con­cern and using the going con­cern basis of account­ing unless there is an inten­tion to dis­con­tin­ue the body’s operations.

Auditor’s respons­ib­il­it­ies for the audit of the fin­an­cial statements Our object­ives are to obtain reas­on­able assur­ance about wheth­er the fin­an­cial state­ments as a whole are free from mater­i­al mis­state­ment, wheth­er due to fraud or error, and to issue an auditor’s report that includes our opin­ion. Reas­on­able assur­ance is a high level of assur­ance, but is not a guar­an­tee that an audit con­duc­ted in accord­ance with ISAs (UK) will always detect a mater­i­al mis­state­ment when it exists. Mis­state­ments can arise from fraud or error and are con­sidered mater­i­al if, indi­vidu­ally or in the aggreg­ate, they could reas­on­ably be expec­ted to influ­ence the decisions of users taken on the basis of these fin­an­cial statements.

Irreg­u­lar­it­ies, includ­ing fraud, are instances of non-com­pli­ance with laws and reg­u­la­tions. We design pro­ced­ures in line with our respons­ib­il­it­ies out­lined above to detect mater­i­al mis­state­ments in respect of irreg­u­lar­it­ies, includ­ing fraud. Pro­ced­ures include:

  • using our under­stand­ing of the cent­ral gov­ern­ment sec­tor to identi­fy that the Nation­al Parks (Scot­land) Act 2000 and dir­ec­tions made there­un­der by the Scot­tish Min­is­ters are sig­ni­fic­ant in the con­text of the body;
  • inquir­ing of the Account­able Officer as to oth­er laws or reg­u­la­tions that may be expec­ted to have a fun­da­ment­al effect on the oper­a­tions of the body;
  • inquir­ing of the Account­able Officer con­cern­ing the body’s policies and pro­ced­ures regard­ing com­pli­ance with the applic­able leg­al and reg­u­lat­ory framework;
  • dis­cus­sions among our audit team on the sus­cept­ib­il­ity of the fin­an­cial state­ments to mater­i­al mis­state­ment, includ­ing how fraud might occur; and
  • con­sid­er­ing wheth­er the audit team col­lect­ively has the appro­pri­ate com­pet­ence and cap­ab­il­it­ies to identi­fy or recog­nise non-com­pli­ance with laws and regulations.

Page 91 of 122

The extent to which our pro­ced­ures are cap­able of detect­ing irreg­u­lar­it­ies, includ­ing fraud, is affected by the inher­ent dif­fi­culty in detect­ing irreg­u­lar­it­ies, the effect­ive­ness of the body’s con­trols, and the nature, tim­ing and extent of the audit pro­ced­ures performed.

Irreg­u­lar­it­ies that res­ult from fraud are inher­ently more dif­fi­cult to detect than irreg­u­lar­it­ies that res­ult from error as fraud may involve col­lu­sion, inten­tion­al omis­sions, mis­rep­res­ent­a­tions, or the over­ride of intern­al con­trol. The cap­ab­il­ity of the audit to detect fraud and oth­er irreg­u­lar­it­ies depends on factors such as the skil­ful­ness of the per­pet­rat­or, the fre­quency and extent of manip­u­la­tion, the degree of col­lu­sion involved, the rel­at­ive size of indi­vidu­al amounts manip­u­lated, and the seni­or­ity of those indi­vidu­als involved.

A fur­ther descrip­tion of the auditor’s respons­ib­il­it­ies for the audit of the fin­an­cial state­ments is loc­ated on the Fin­an­cial Report­ing Council’s web­site www​.frc​.org​.uk/​a​u​d​i​t​o​r​s​r​e​s​p​o​n​s​i​b​i​l​ities. This descrip­tion forms part of our auditor’s report.

Report­ing on reg­u­lar­ity of expendit­ure and income Opin­ion on regularity In our opin­ion in all mater­i­al respects the expendit­ure and income in the fin­an­cial state­ments were incurred or applied in accord­ance with any applic­able enact­ments and guid­ance issued by the Scot­tish Ministers.

Respons­ib­il­it­ies for regularity The Account­able Officer is respons­ible for ensur­ing the reg­u­lar­ity of expendit­ure and income. In addi­tion to our respons­ib­il­it­ies in respect of irreg­u­lar­it­ies explained in the audit of the fin­an­cial state­ments sec­tion of our report, we are respons­ible for express­ing an opin­ion on the reg­u­lar­ity of expendit­ure and income in accord­ance with the Pub­lic Fin­ance and Account­ab­il­ity (Scot­land) Act 2000.

Report­ing on oth­er requirements Opin­ion pre­scribed by the Aud­it­or Gen­er­al for Scot­land on audited parts of the Remu­ner­a­tion and Staff Report We have audited the parts of the Remu­ner­a­tion and Staff Report described as audited. In our opin­ion, the audited parts of the Remu­ner­a­tion and Staff Report have been prop­erly pre­pared in accord­ance with the Nation­al Parks (Scot­land) Act 2000 and dir­ec­tions made there­un­der by the Scot­tish Ministers.

Oth­er information The Account­able Officer is respons­ible for the oth­er inform­a­tion in the annu­al report and accounts. The oth­er inform­a­tion com­prises the Per­form­ance Report and the Account­ab­il­ity Report exclud­ing the audited parts of the Remu­ner­a­tion and Staff Report.

Our respons­ib­il­ity is to read all the oth­er inform­a­tion and, in doing so, con­sider wheth­er the oth­er inform­a­tion is mater­i­ally incon­sist­ent with the fin­an­cial state­ments or our know­ledge obtained in the course of the audit or oth­er­wise appears to be mater­i­ally mis­stated. If we identi­fy such mater­i­al incon­sist­en­cies or appar­ent mater­i­al mis­state­ments, we are required to determ­ine wheth­er this gives rise to a mater­i­al mis­state­ment in the fin­an­cial state­ments them­selves. If, based on the work we have per­formed, we con­clude that there is a mater­i­al mis­state­ment of this oth­er inform­a­tion, we are required to report that fact.

Page 92 of 122

We have noth­ing to report in this regard.

Our opin­ion on the fin­an­cial state­ments does not cov­er the oth­er inform­a­tion and we do not express any form of assur­ance con­clu­sion there­on except on the Per­form­ance Report and Gov­ernance State­ment to the extent expli­citly stated in the fol­low­ing opin­ions pre­scribed by the Aud­it­or Gen­er­al for Scotland.

Opin­ions pre­scribed by the Aud­it­or Gen­er­al for Scot­land on Per­form­ance Report and Gov­ernance Statement In our opin­ion, based on the work under­taken in the course of the audit:

  • the inform­a­tion giv­en in the Per­form­ance Report for the fin­an­cial year for which the fin­an­cial state­ments are pre­pared is con­sist­ent with the fin­an­cial state­ments and that report has been pre­pared in accord­ance with the Nation­al Parks (Scot­land) Act 2000 and dir­ec­tions made there­un­der by the Scot­tish Min­is­ters; and
  • the inform­a­tion giv­en in the Gov­ernance State­ment for the fin­an­cial year for which the fin­an­cial state­ments are pre­pared is con­sist­ent with the fin­an­cial state­ments and that report has been pre­pared in accord­ance with the Nation­al Parks (Scot­land) Act 2000 and dir­ec­tions made there­un­der by the Scot­tish Ministers.

Mat­ters on which we are required to report by exception We are required by the Aud­it­or Gen­er­al for Scot­land to report to you if, in our opinion:

  • adequate account­ing records have not been kept; or
  • the fin­an­cial state­ments and the audited parts of the Remu­ner­a­tion and Staff Report are not in agree­ment with the account­ing records; or
  • we have not received all the inform­a­tion and explan­a­tions we require for our audit.

We have noth­ing to report in respect of these matters.

Con­clu­sions on wider scope responsibilities In addi­tion to our respons­ib­il­it­ies for the annu­al report and accounts, our con­clu­sions on the wider scope respons­ib­il­it­ies spe­cified in the Code of Audit Prac­tice are set out in our Annu­al Audit Report.

Use of our report This report is made solely to the parties to whom it is addressed in accord­ance with the Pub­lic Fin­ance and Account­ab­il­ity (Scot­land) Act 2000 and for no oth­er pur­pose. In accord­ance with para­graph 108 of the Code of Audit Prac­tice, we do not under­take to have respons­ib­il­it­ies to mem­bers or officers, in their indi­vidu­al capa­cit­ies, or to third parties.

Tom Reid, Dir­ect­or For and on behalf of For­vis Maz­ars LLP 100 Queen Street Glas­gow – G1 3DN 09 Octo­ber 2026

Page 93 of 122

3 FIN­AN­CIAL STATEMENTS

3.1 State­ment of Com­pre­hens­ive Net Expenditure

for the year ended 31 March 2026

notesFor the year to 31 March 2026 £’000For the year to 31 March 2025 £’000
Income
Oper­a­tion­al plan income2,1391,550
Oth­er income182108
Total oper­at­ing income52,3211,658
Expendit­ure
Board and staff costs6(7,399)(6,543)
Oper­a­tion­al plan expenditure3(8,706)(6,226)
Oth­er oper­at­ing costs7(1,125)(905)
Depre­ci­ation, amort­ising, and impair­ment charges9,10,11(340)(315)
Total oper­at­ing expenditure(17,570)(13,989)
Net oper­at­ing expenditure(15,249)(12,331)
Fin­ance expendit­ure (interest on leases)18(30)(33)
Fin­ance income141134
Com­pre­hens­ive net expendit­ure for the year fun­ded by grant-in-aid(15,138)(12,230)

No activ­it­ies were dis­con­tin­ued dur­ing the year.

The notes on pages 97 to 120 form part of these accounts

Page 94 of 122

3.2 State­ment of Fin­an­cial Pos­i­tion as at 31 March 2026

notesAs at 31 March 2026 £’000As at 31 March 2025 £’000
Non-cur­rent assets
Tan­gible assets9577454
Right of use assets102,2062,409
Intan­gible assets11233257
Invest­ments1200
Total non-cur­rent assets3,0163,120
Cur­rent assets
Trade and oth­er receivables131,6081,147
Cash and cash equivalents143,2802,342
Total cur­rent assets4,8883,489
Cur­rent liabilities
Trade and oth­er payables15(4,613)(3,198)
Total cur­rent liabilities(4,613)(3,198)
Cur­rent assets less cur­rent liabilities275291
Non-cur­rent liabilities
Trade and oth­er payables15(2,054)(2,255)
Assets less liabilities1,2371,156
Tax­pay­ers’ equity1,2371,156

The notes on pages 97 to 120 form part of these accounts

The Account­able Officer author­ised the fin­an­cial state­ments for issue on 02 Octo­ber 2026.

Grant Moir Chief Exec­ut­ive and Account­able Officer 09 Octo­ber 2026

Page 95 of 122

3.3 State­ment of Cash Flows for the year ended 31 March 2026

notesFor the year to 31 March 2026 £’000For the year to 31 March 2025 £’000
Net oper­at­ing expenditureSoCNE(15,249)(12,331)
Adjust­ment for non-cash transactions
Depre­ci­ation, amort­isa­tion, and impair­ment charges9,10,11340315
Move­ments in work­ing capital
(Increase)/decrease in trade and oth­er receivables(461)(460)
(Decrease)/increase in trade and oth­er payables1,408845
Net cash (out­flow) from oper­at­ing activities(13,962)(11,631)
Cash flows from invest­ing activities
Pur­chase of non-cur­rent assets(236)(231)
Net cash (out­flow) from invest­ing activities(236)(231)
Cash flows from fin­an­cing activities
Grants from spon­sor­ing Directorate415,21912,120
Cap­it­al ele­ment in respect of leases(194)(188)
Interest in respect of leases18(30)(33)
Interest receivedSoCNE141134
Net fin­an­cing15,13612,033
Net (decrease) / increase in cash938171
Cash and cash equi­val­ents at 1 April142,3422,171
Cash and cash equi­val­ents at 31 March143,2802,342

The notes on pages 97 to 120 form part of these accounts

Page 96 of 122

3.4 State­ment of Changes in Tax­pay­ers’ Equity for the year ended 31

March 2026

notesFor the year ended 31 March 2026 £’000For the year ended 31 March 2025 £’000
Bal­ance as at 1 April, 20251,1561,266
Grant from spon­sor­ing department415,21912,120
Net expendit­ureSoCNE(15,138)(12,230)
Bal­ance as at 31 March, 20261,2371,156

The notes on pages 97 to 120 form part of these accounts

Page 97 of 122

3.5 Notes to the Fin­an­cial State­ments for the year ended 31 March

2026

Note 1. Basis of pre­par­a­tion of accounts The annu­al accounts are pre­pared in accord­ance with the Accounts Dir­ec­tion issued by Scot­tish Min­is­ters under sec­tion 25(b) of the Nation­al Parks (Scot­land) Act 2000, Gov­ern­ment Fin­an­cial Report­ing Manu­al (FReM) issued by HM treas­ury, as adop­ted and inter­preted by the Scot­tish Gov­ern­ment, which fol­lows gen­er­ally accep­ted account­ing prac­tice as defined in Inter­na­tion­al Fin­an­cial Report­ing Stand­ards (IFRS) as adop­ted by the United King­dom and the Com­pan­ies Act 2006 to the extent that it is mean­ing­ful and appro­pri­ate in the pub­lic sec­tor con­text. The Accounts Dir­ec­tion is included as Appendix 1.

Note 2. Account­ing policies Where FReM per­mits a choice of account­ing policy, those which are con­sidered to be most appro­pri­ate in giv­ing a true and fair view have been adop­ted and have been applied con­sist­ently to all mater­i­al trans­ac­tions through­out the fin­an­cial year.

The account­ing policies adop­ted are set out below and have been applied con­sist­ently through­out the year in deal­ing with any items that are con­sidered mater­i­al to the accounts.

Account­ing convention The accounts are pre­pared under the his­tor­ic­al cost convention.

Account­ing period The account­ing peri­od com­menced on 1 April 2025 and ended on 31 March 2026.

Going con­cern The accounts have been pre­pared on a going con­cern basis as the Board and Account­able Officer believe that future liab­il­it­ies will be met from a com­bin­a­tion of cash budget alloc­a­tion from the Scot­tish Gov­ern­ment, future grants from part­ner agen­cies, and income from chargeable activities.

Page 98 of 122

Non-cur­rent assets – prop­erty, plant, and equip­ment (PPE) Assets cap­it­al­ised are ini­tially recog­nised at cost in the fin­an­cial state­ments, and with sub­sequent recog­ni­tion at depre­ci­ated his­tor­ic cost as a proxy for cur­rent value, owing to the types of tan­gible assets cap­it­al­ised, and their short use­ful eco­nom­ic lives.

All PPE is reviewed annu­ally for impair­ment, and adjust­ments are made if necessary.

Non-cur­rent assets – leased assets Leased assets are accoun­ted for under IFRS 16, which provides a single less­ee account­ing mod­el, with a right of use asset and a lease liab­il­ity being recog­nised on the com­mence­ment of a lease. Right-of-use assets are depre­ci­ated on a straight-line basis over the asso­ci­ated lease term or estim­ated use­ful life where this is short­er. Impair­ment losses are charged in the same way as those arising on prop­erty, plant, and equip­ment. As per­mit­ted by the FReM, right-of-use assets are sub­sequently meas­ured using the cost mod­el as a proxy for the meas­ure­ment of the cost of value in use. This is because lease terms require lease pay­ments to be updated for mar­ket con­di­tions, for example, rent reviews for leased prop­er­ties, which will be cap­tured in the IFRS 16 cost meas­ure­ment pro­vi­sions. Right-of-use assets also have short­er use­ful lives than their respect­ive under­ly­ing assets and, as such, cost has been used as a proxy for assets with short­er eco­nom­ic lives or lower val­ues in accord­ance with the FreM.

Non-cur­rent assets – intan­gible assets Intan­gible assets cap­it­al­ised, includ­ing pur­chased com­puter soft­ware, are accoun­ted for in accord­ance with IAS 38, using a his­tor­ic cost mod­el. Intan­gible assets are ini­tially meas­ured at cost. Fol­low­ing ini­tial recog­ni­tion, they are car­ried at his­tor­ic­al cost less accu­mu­lated amort­isa­tion and accu­mu­lated impair­ment losses. No revalu­ation mod­el is applied to intan­gible assets.

Depre­ci­ation and amortisation Depre­ci­ation or amort­isa­tion is provided on all non-cur­rent assets at rates cal­cu­lated to write down the cost or valu­ation on a straight-line basis over the use­ful eco­nom­ic lives in the fol­low­ing ranges:

Page 99 of 122

Tan­gible assets

  • park entry mark­ers: 25 years or less
  • oper­a­tion­al plant and equip­ment: 5 years or over the length of the lease on land for ​“Scen­ic Routes” assets
  • inform­a­tion tech­no­logy: 3 – 5 years
  • lease­hold improve­ments: over the length of the lease, or short­er peri­od depend­ing on the nature of the asset cap­it­al­ised as a lease­hold improvement
  • right-of-use assets: over the length of the lease

Intan­gible assets

  • soft­ware: 5 years

Depre­ci­ation or amort­isa­tion is charged to the State­ment of Com­pre­hens­ive Net Expendit­ure on the car­ry­ing value of the non-cur­rent asset.

Fin­an­cial instru­ments and expos­ure to risks The Park Authority’s fin­an­cial instru­ments com­prise trade and oth­er receiv­ables, trade and oth­er pay­ables, and cash and liquid resources.

Trade receiv­ables are recog­nised at cost, which is assumed to be their fair value, and recov­er­ab­il­ity is routinely mon­itored. If it is assumed or known that a debt will not be recovered it is writ­ten off to the State­ment of Com­pre­hens­ive Net Expendit­ure. Any sub­sequent recov­ery of amounts pre­vi­ously writ­ten off are sim­il­arly taken to the State­ment of Com­pre­hens­ive Net Expenditure.

Trade pay­ables are recog­nised at cost, which is con­sidered to rep­res­ent fair value. Cash is held in accounts with com­mer­cial banks. There is no sig­ni­fic­ant liquid­ity or cred­it risk expos­ure owing to the cred­it con­trols in place.

The car­ry­ing value of the fin­an­cial assets and liab­il­it­ies is con­sidered a reas­on­able approx­im­a­tion of fair value. The invest­ment in Nation­al Parks Part­ner­ships LLP is

Page 100 of 122

meas­ured at a fair value through profit and loss, in accord­ance with IFRS 9 Fin­an­cial Instru­ments. The fair value is assessed as £nil (2024÷25: £nil).

Income and expendit­ure recognition Income from activ­it­ies is accoun­ted for in the year to which it relates and not to when cash pay­ments are received.

Where income has been recog­nised but cash has not been received or paid, a receiv­able for the cor­res­pond­ing amount is recor­ded in the State­ment of Fin­an­cial Pos­i­tion. Where cash has been received in advance of the activ­ity, no income is recog­nised and a pay­able for the cor­res­pond­ing amount is recor­ded in the State­ment of Fin­an­cial Position.

Oper­at­ing income is income that relates dir­ectly to the oper­at­ing activ­it­ies of the Park Author­ity. It includes fees and charges for ser­vices provided.

All income from con­tracts with cus­tom­ers is recog­nised in accord­ance with IFRS 15, which depicts the trans­fer of goods and ser­vices to cus­tom­ers in an amount that reflects the con­sid­er­a­tion to which the Park Author­ity expects to be entitled in exchange for those goods or ser­vices. Rev­en­ue is recog­nised in accord­ance with that core prin­ciple by apply­ing the fol­low­ing steps:

  • Iden­ti­fic­a­tion of con­tract with a customer
  • Iden­ti­fic­a­tion of the per­form­ance oblig­a­tions in the contract
  • Determ­ine the trans­ac­tion price
  • Alloc­ate the trans­ac­tion price to the per­form­ance oblig­a­tions in the contract
  • Recog­nise rev­en­ue when the per­form­ance oblig­a­tion is sat­is­fied, and con­trol of the goods or ser­vice has been passed over.

Grant income is recog­nised in line with IAS 20 when it is receiv­able. If enti­tle­ment of grant income is sub­ject to per­form­ance con­di­tions, the income is recog­nised as the per­form­ance con­di­tions are met.

Expendit­ure on oper­a­tion­al activ­it­ies is accoun­ted for or charged to the State­ment of Com­pre­hens­ive Net expendit­ure in the year in which deliv­ery of those activ­it­ies has

Page 101 of 122

been car­ried out. Staff costs are accoun­ted for in the year in which the salar­ies are earned togeth­er with employer’s costs. Oth­er expendit­ure is charged or accrued into the year the ser­vices or goods are used. As part of the year end accounts pre­par­a­tion any expendit­ure that relates to future account­ing peri­ods of more than £500 is pre­paid to be matched to income earned in future account­ing peri­ods. All expendit­ure after this date, that relates to ser­vices or goods received by 31 March 2026, has been accrued.

Scot­tish Gov­ern­ment fund­ing and grant-in-aid The Park Author­ity receives grant-in-aid from the Scot­tish Gov­ern­ment to fin­ance its operations.

The Park Author­ity receives a budget from the Scot­tish Gov­ern­ment (Depart­ment­al Expendit­ure Lim­it or DEL) to fund non-cash expendit­ure (depre­ci­ation) and the cash costs of acquir­ing tan­gible and intan­gible assets and of oper­at­ing expendit­ure. Tax­pay­ers’ Equity is cred­ited with the DEL cash alloc­a­tion and charged with the net expendit­ure on the DEL cash alloc­a­tion in the State­ment of Changes in Tax­pay­ers’ Equity.

Pen­sion costs Present and past employ­ees are covered by the pro­vi­sions of the Prin­cip­al Civil Ser­vice Pen­sion Scheme (PCSPS) which is a defined bene­fit scheme. The Park Author­ity recog­nises the expec­ted cost of provid­ing pen­sions for their employ­ees on a sys­tem­at­ic and ration­al basis over the peri­od dur­ing which they bene­fit from their ser­vices by pay­ment to the PCSPS of amounts cal­cu­lated on an accru­ing basis. Rel­ev­ant dis­clos­ures are repor­ted in Note 16. Liab­il­ity for the pay­ment of future bene­fits is a charge to the PCSPS.

Page 102 of 122

Leases Where a lease has been iden­ti­fied, the Park Author­ity recog­nises a right-of-use asset and a cor­res­pond­ing lease liab­il­ity, except for short term leases and leases for which the under­ly­ing asset is of low value. For such leases, the lease pay­ments are recog­nised as an expense on a straight-line basis over the lease term. The Park Author­ity determ­ines the term of a lease as the non-can­cellable peri­od of a lease com­bined with peri­ods covered by an option to either extend the lease where the Park Author­ity is reas­on­ably cer­tain to exer­cise that option, or to ter­min­ate the lease where the Park Author­ity is reas­on­ably cer­tain not to exer­cise that option. In assess­ing wheth­er an option is reas­on­ably cer­tain to be exer­cised or not exer­cised, judge­ment is applied in con­sulta­tion with future prop­erty strategy. The Park Author­ity has not set a spe­cif­ic threshold for identi­fy­ing assets that are of low value and applies the guid­ance in IFRS 16 on a case-by-case basis. Where the interest rate impli­cit in a lease can­not be read­ily determ­ined, the Park Author­ity cal­cu­lates the lease liab­il­ity using the HM Treas­ury dis­count rates pro­mul­gated in PES papers as the incre­ment­al bor­row­ing rate. For leases that com­mence or are remeas­ured in 2025⁄26, this rate is 4.81% to 31 Decem­ber 2025, and 5.32% to 31 March 2026 (2024÷25: 4.72% to 31 Decem­ber 2024 and 4.81% 31 March 2025).

Value Added Tax (VAT) Most of the activ­it­ies of the Park Author­ity are out­side the scope of VAT, and in gen­er­al out­put VAT does not apply and input tax on pur­chases is not recov­er­able. Irre­cov­er­able VAT is charged to the rel­ev­ant expendit­ure cat­egory or is included in the cap­it­al­ised pur­chase cost when incurred.

Short-term employ­ee benefits A liab­il­ity for accrued unused annu­al leave, flexi­time and time off in lieu of pay­ment (TOIL) is recog­nised to 31 Decem­ber, the end of the hol­i­day year. The move­ment for the year is charged or cred­ited to the State­ment of Com­pre­hens­ive Net Expenditure.

Interest in oth­er entities IFRS 12: Dis­clos­ure of interests in oth­er entit­ies, requires dis­clos­ure on interests in sub­si­di­ar­ies, joint arrange­ment, asso­ci­ates, and uncon­sol­id­ated struc­tured entit­ies. The Park Author­ity is a Des­ig­nate Mem­ber of Nation­al Parks Part­ner­ships LLP, which was incor­por­ated on 11 June 2016. The Author­ity, along with the 14 other

Page 103 of 122

Nation­al Parks, holds an equal share in the LLP. The invest­ment does not meet the cri­ter­ia of a sub­si­di­ary, joint ven­ture or asso­ci­ate and has been recog­nised as an investment.

Changes in Account­ing Standards IFRS 17 Insur­ance Con­tracts applies to report­ing peri­ods in the pub­lic sec­tor from 1 April 2025 as inter­preted by the FReM. Man­age­ment has assessed the Authority’s arrange­ments, includ­ing con­tin­gent liab­il­it­ies and guar­an­tees, to determ­ine wheth­er any con­tracts trans­fer sig­ni­fic­ant insur­ance risk to the Author­ity. Based on this assess­ment, the Author­ity does not hold or issue insur­ance con­tracts with­in the scope of IFRS 17. Accord­ingly, IFRS 17 has no mater­i­al impact on the recog­ni­tion, meas­ure­ment, present­a­tion or dis­clos­ure of amounts in these fin­an­cial statements.

Stand­ards, amend­ments, and inter­pret­a­tions early adop­ted this year There are no new stand­ards, amend­ments or inter­pret­a­tions adop­ted early this year.

Stand­ards issued but not yet effective IFRS 18 Present­a­tion and Dis­clos­ure in Fin­an­cial State­ments applies to report­ing peri­ods in the pub­lic sec­tor for annu­al report­ing peri­ods begin­ning on or after 1 Janu­ary 2027.

Sig­ni­fic­ant judge­ments and estimates Pre­par­a­tion of fin­an­cial state­ments requires man­age­ment to make sig­ni­fic­ant judge­ments and estim­ates. The items in the fin­an­cial state­ments where these judge­ments and estim­ates have been made include the items set out below.

Pro­jects fun­ded by third parties — irreg­u­lar­it­ies. The Park Author­ity is the lead body for Her­it­age Lot­tery Fund sup­por­ted pro­jects, the Caper­cail­lie Frame­work Pro­ject and the new Cairngorms 2030: People and Nature Thriv­ing Togeth­er (formerly known as the Her­it­age Hori­zons pro­ject), as well as being the Account­able Body for Cairngorms LEAD­ER which admin­istered the European fun­ded pro­ject (LEAD­ER) on behalf of the Cairngorms Loc­al Action Group (con­cluded in 2021⁄22). These arrange­ments require that the Park Author­ity make advances of fund­ing to pro­jects and grant applic­ants, which in turn are reclaimed from the fun­ders. It is pos­sible that funds advanced may fall to be irre­cov­er­able if any of these costs are found to be

Page 104 of 122

irreg­u­lar. It is the opin­ion of the Dir­ect­ors that the like­li­hood of fin­an­cial liab­il­ity arising from this arrange­ment is very low, and con­sequently this risk has been dis­closed as a con­tin­gent liab­il­ity in the notes to the accounts.

Guar­an­tees to landown­ers. Fin­an­cial guar­an­tees have been made to landown­ers in respect of poten­tial dam­age to flood banks that might be caused by beaver bur­row­ing. It is the opin­ion of the Dir­ect­ors that the like­li­hood of fin­an­cial claim from this arrange­ment is very low, and con­sequently this risk has been dis­closed as a con­tin­gent liab­il­ity in the notes to the accounts.

Page 105 of 122

Note 3. Seg­ment­al reporting IFRS 8: Seg­ment­al Report­ing, requires oper­at­ing seg­ments to be iden­ti­fied on the basis of intern­al reports about com­pon­ents of the Park Authority’s work.

2025⁄26

Board and staff costs £’000Oper­a­tion­al plan expendit­ure £’000Oth­er oper­at­ing costs £’000Oper­a­tion­al plan income £’000Oth­er income £’000Net seg­ment­al expendit­ure £’000
Con­ser­va­tion
Peat­land recovery4853,51176004,072
Land man­age­ment1702862700483
Farm­ing67821000159
Fresh­wa­ter systems30985(79)054
Eco­lo­gic­al net­work & restoration15236027(22)0517
Spe­cies recovery2181,18334001,435
Cli­mate adap­tion fund612741000345
1,1835,794189(101)07,065
Vis­it­or experience
Rur­al development67851000162
Vis­it­or experience12351916(352)0306
Inclu­sion309474800404
49965174(352)0872
Rur­al Development
Hous­ing & com­munity benefit6981310900820
Path main­ten­ance & improvements613701000441
VIP grant scheme000000
High-qual­ity vis­it­or experience1,056369165(42)01,548
1,815752284(42)02,809
Cairngorms 20301,1331,4250(1,644)0914
Cor­por­ate activities2,366843710(182)2,639
Com­mu­nic­a­tions403020700610
7,3998,7061,125(2,139)(182)14,909
Items not attrib­ut­able to seg­ment­al activity
Depre­ci­ation, amort­ising, and impair­ment charges340
Net oper­at­ing expenditure15,249

Page 106 of 122

2024⁄25

Board mem­ber and staff costs £’000Oper­a­tion­al plan expendit­ure £’000Oth­er oper­at­ing costs £’000Oper­a­tion­al plan income £’000Oth­er income £’000Net seg­ment­al expendit­ure £’000
Con­ser­va­tion
Peat­land recovery4312,38071--2,882
Land man­age­ment15113225(30)-278
Farm­ing5939510(280)-184
Fresh­wa­ter systems27634--94
Eco­lo­gic­al net­work & restoration13529422--451
Spe­cies recovery21433632--582
Cli­mate adap­tion fund543639(9)-417
1,0713,963173(319)-4,888
Vis­it­or experience
Rur­al development598910--158
Vis­it­or experience1115019(464)-157
Inclu­sion2758645--406
44567664(464)-721
Rur­al Development
Hous­ing & com­munity benefit62043102--765
Path main­ten­ance & improvements541539--216
VIP grant scheme------
High-qual­ity vis­it­or experience935616156(12)-1,695
1,609812267(12)-2,676
Cairngorms 2030988502-(731)-759
Cor­por­ate activities2,101141347(24)(108)2,457
Com­mu­nic­a­tions32913254--515
6,5436,226905(1,550)(108)12,016
Items not attrib­ut­able to seg­ment­al activity
Depre­ci­ation, amort­ising, and impair­ment charges315
Net oper­at­ing expenditure12,331

Page 107 of 122

Note 4. Grant-in-aid

2026 £’0002025 £’000
Grant-in-aid alloc­ated to meet oper­a­tion­al expenditure9,4867,974
Grant-in-aid alloc­ated to meet cap­it­al expenditure5,7334,146
15,21912,120

Note 5. Income

2026 Oper­a­tion­al plan £’0002026 Oth­er income £’0002025 Oper­a­tion­al plan £’0002025 Oth­er income £’000
Oper­a­tion­al Plan income2,139-1,550-
Plan­ning fees (con­tract income)-95-55
Oth­er-87-53
2,1391821,550108

Note 6. Board mem­ber and staff costs Fur­ther inform­a­tion can be found in sec­tion 2.3 – Remu­ner­a­tion and staff report.

Per­man­ently employed staff and Board mem­bers £’000Oth­ers £’000Total 2026 £’000Total 2025 £’000
Board mem­bers214-214195
Staff5,6281,4227,0506,249
Agency or short-term staff-13513599
5,8421,5577,3996,543
Board mem­bers
Fees198-198190
Social secur­ity costs16-165
214-214195
Staff
Salar­ies3,9711,0535,0244,536
Social secur­ity costs528132660467
Pen­sions1,1272371,3641,235
Appren­tice­ship levy2-211
5,6281,4227,0506,249
Non-payroll staff-13513599

Page 108 of 122

Note 7. Oth­er oper­at­ing costs

2026 £’0002025 £’000
Office run­ning costs292331
Inform­a­tion technology425225
Board and staff costs (exclud­ing salary/​fee costs)179175
Pro­fes­sion­al sup­port fees147104
Vehicles and office equip­ment rentals5253
Inde­pend­ent auditor’s fees2616
Land and build­ing rentals*41
1,125905

*Rent­als on leased prop­er­ties are from 1 April 2022 accoun­ted for under IFRS 16 whereby a right-of-use asset and lease liab­il­ity are recog­nised in the fin­an­cial state­ments. Depre­ci­ation is charged on the right-of-use asset and interest is recog­nised in the lease liab­il­ity. Rent­al costs shown above are those on low value assets that have not been capitalised.

No non-audit fees were paid to the extern­al aud­it­or dur­ing the year (2024÷25 £nil).

Note 8. Fin­an­cial Instru­ments and Expos­ure to Risks The Park Authority’s cash oper­at­ing and cap­it­al expendit­ure is met from the DEL cash budget alloc­a­tion from the Scot­tish Gov­ern­ment, from oth­er income sources and from con­tri­bu­tions from part­ner agen­cies to jointly fund pro­jects. The Park Author­ity has no powers to bor­row money or to invest sur­plus funds. Oth­er than fin­an­cial assets and liab­il­it­ies, which are gen­er­ated by day-to-day oper­a­tion­al activ­it­ies, and the invest­ment in Nation­al Parks Part­ner­ships LLP (Note 12), the Park Author­ity holds no fin­an­cial instruments.

Liquid­ity risk — the Park Authority’s net rev­en­ue resource require­ments are fin­anced by Scot­tish Gov­ern­ment, as is its cap­it­al expendit­ure. The Park Author­ity is not there­fore exposed to mater­i­al liquid­ity risks.

Cred­it risk — the Park Authority’s fun­ders are mainly Scot­tish Gov­ern­ment Depart­ments, Exec­ut­ive Agen­cies or oth­er Pub­lic Bod­ies. The Park Author­ity is there­fore not exposed to any mater­i­al cred­it risk.

For­eign Cur­rency Risk — the Park Author­ity is not exposed to for­eign cur­rency risk.

Page 109 of 122

The Park Authority’s fin­an­cial assets and liab­il­it­ies are cat­egor­ised by groups under IFRS 9 as

2026 £’0002025 £’000
Fin­an­cial assets
Trade and oth­er receivables1,6081,147
Cash and cash equivalents3,2802,342
4,8883,489
Fin­an­cial liabilities
Trade and oth­er payables3,9333,551
3,9333,551

Page 110 of 122

Note 9. Tan­gible assets

Inform­a­tion Tech­no­logy £’000Lease­hold prop­erty improve­ments £’000Park entry mark­ers £’000Oper­a­tion­al plant and equip­ment £’000Assets under con­struc­tion £’000Total £’000
Cost
At 31 March 20252923175777501,441
Addi­tions84900620236
Trans­fers000000
Dis­pos­als(127)00(23)0(150)
At 31 March 20262494075781401,527
Depre­ci­ation
At 31 March 2025(230)(212)(57)(488)0(987)
Charge for year(32)(22)0(59)0(113)
Dis­pos­als12500250150
At 31 March 2026(137)(234)(57)(522)0(950)
Cost
At 1 April 202428225057754331,376
Addi­tions103-223065
Trans­fers-64-(1)(63)0
Dis­pos­als-----0
At 31 March 20252923175777501,441
Depre­ci­ation
At 1 April 2024(196)(204)(57)(439)-(896)
Charge for year(34)(8)-(49)-(91)
Dis­pos­als-----0
At 31 March 2025(230)(212)(57)(488)0(987)
Car­ry­ing value
At 31 March 202611217302920577
At 31 March 20256210502870454

The Author­ity owns all assets cap­it­al­ised oth­er than right-of-use assets, (prop­erty and equip­ment), which are held under lease, as shown in Note 10. The Author­ity has no fin­ance leases.

Page 111 of 122

Note 10. Right-of-use assets

Prop­erty £’000Vehicles £’000Office equip­ment £’000Total £’000
Cost
At 31 March 20252,595280272,902
Revalu­ations0000
Addi­tions0000
Dis­pos­als0(20)0(20)
At 31 March 20262,595260272,882
Depre­ci­ation
At 31 March 2025(367)(111)(15)(493)
Revalu­ations0000
Charge for year(130)(66)(7)(203)
Dis­pos­als020020
At 31 March 2026(497)(157)(22)(676)
Cost
At 1 April 20242,595215372,847
Revalu­ations0
Addi­tions-70-70
Dis­pos­als-(5)(10)(15)
At 31 March 20252,595280272,902
Depre­ci­ation
At 1 April 2024(236)(53)(17)(306)
Revalu­ations0
Charge for year(131)(63)(8)(202)
Dis­pos­als-51015
At 31 March 2025(367)(111)(15)(493)
Car­ry­ing value
At 31 March 20262,09810352,206
At 31 March 20252,228169122,409

Page 112 of 122

Note 11. Intan­gible assets

Soft­ware £’000Assets under con­struc­tion £’000Total £’000
Cost
At 31 March 2025104216320
Addi­tions000
Trans­fers216(216)0
Dis­pos­als(8)0(8)
At 31 March 20263120312
Amort­isa­tion
At 31 March 2025(63)0(63)
Charge for year(24)0(24)
Dis­pos­als808
At 31 March 2026(79)0(79)
Cost
At 1 April 2024115120235
Addi­tions-9696
Dis­pos­als(11)-(11)
At 31 March 2025104216320
Amort­isa­tion
At 1 April 2024(52)-(52)
Charge for year(22)-(22)
Dis­pos­als11-11
At 31 March 2025(63)0(63)
Car­ry­ing value
At 31 March 20262330233
At 31 March 202541216257

Note 12. Investments The Park Author­ity holds an invest­ment in Nation­al Parks Part­ner­ships LLP. At incor­por­a­tion, the Park Author­ity and the oth­er 14 UK Nation­al Parks con­trib­uted £12,000 for an equal share in the entity with a fur­ther cap­it­al call in March 2018.

Page 113 of 122

The invest­ment was fully impaired as at 31 March 2018, as the cap­it­al con­tri­bu­tions can­not be with­drawn or paid back. Under IFRS 9, the invest­ment is meas­ured at a fair value through the State­ment of Com­pre­hens­ive Net Expendit­ure. The fair value is assessed as nil, which is the same as the car­ry­ing value in the pri­or year.

Note 13. Trade receiv­able and oth­er cur­rent assets

2026 £’0002025 £’000
Amounts fall­ing due with­in one year:
Trade receiv­ables8722
Pro­ject income debtors1,169883
Pre­pay­ments and accrued income352242
1,6081,147

Note 14. Cash and cash equivalents

2026 £’0002025 £’000
Bal­ance as at 1 April2,3422,171
Net change in cash and cash equi­val­ent balances938171
Bal­ance as at 31 March3,2802,342

The year end bal­ances were held in com­mer­cial bank accounts, treas­ury depos­it facil­it­ies and as cash in hand.

Page 114 of 122

Note 15. Trade pay­ables and oth­er cur­rent liabilities

2026 £’0002025 £’000
Amounts fall­ing due with­in one year:
Trade pay­ables90310
Accru­als7771,097
Deferred income2,5001,639
Hol­i­day pay accrual236263
Cur­rent part of lease liabilities197189
4,6133,198
Amounts fall­ing due over one year:
Lease liab­il­it­ies2,0542,255
6,6675,453

Note 16. Pensions The Park Author­ity is a mem­ber of the Prin­cip­al Civil Ser­vice Pen­sions Scheme (PCSPS) which is an unfun­ded multi-employ­er defined bene­fit scheme. The Park Author­ity is unable to identi­fy its share of the under­ly­ing assets and liab­il­it­ies of the scheme. A full actu­ar­ial valu­ation was car­ried out as at 31 March 2020, details of it, and annu­al Resource Accounts, can be found at www​.civilser​vi​cepen​sion​s​cheme​.org​.uk

For the year ended 31 March 2026 employer’s con­tri­bu­tions of £1,320,141 (2024÷25: £1,198,907) were paid to the PCSPS. The con­tri­bu­tions were pay­able the rate of 28.97% of pen­sion­able pay, based on salary bands. The scheme’s Actu­ary reviews employ­er con­tri­bu­tion peri­od­ic­ally and fol­low­ing a full scheme valu­ation this rate will be applied until 2026⁄27. The con­tri­bu­tion rates reflect bene­fits as they are accrued, not when the costs are actu­ally incurred, and reflect past exper­i­ence of the scheme.

All employ­ees have the oppor­tun­ity to join the scheme, and can also opt to open part­ner­ship pen­sion accounts, a stake­hold­er pen­sion with an employ­er con­tri­bu­tion. Employer’s con­tri­bu­tions to the part­ner­ship pen­sion pro­vider dur­ing 2025⁄26 were £45,519 (2024÷25: £36,143).

Page 115 of 122

Note 17. Cap­it­al commitments

2026 £’0002025 £’000
Con­trac­ted cap­it­al com­mit­ments at 31 March 2026 not oth­er­wise included in the fin­an­cial statements
Prop­erty, plant, and equipment246

Note 18. Leases The Author­ity has entered into leases in the nor­mal course of our oper­at­ing activ­it­ies. Rent­als on leased assets are accoun­ted for under IFRS 16 whereby a right-of-use asset and lease liab­il­ity are recog­nised in the fin­an­cial state­ments. Depre­ci­ation is charged on the right-of-use asset and interest is charged to the lease liab­il­ity. Details of the right-of-use assets included in the State­ment of Fin­an­cial Pos­i­tion and of the depre­ci­ation charge recor­ded in the State­ment of Com­pre­hens­ive Net Expendit­ure are shown in Note 10.

Oblig­a­tions under non-can­cellable leases are giv­en in the table below:

Land and build­ings 2026 £’000Land and build­ings 2025 £’000Motor vehicles and office equip­ment 2026 £’000Motor vehicles and office equip­ment 2025 £’000
Not later than 1 year1241207369
Later than 1 and not later than 5 years46045447123
Later than 5 years1,5471,679--
2,1312,253120192

The expense related to short-life leases was £nil (2024÷25: nil). The expense related to low value assets was £3,672 (2024÷25: £1,440).

The cash out­flow in respect of leases for the year ended 31 March 2026 was £223,733 (2024÷25: £221,487).

Interest on lease liab­il­it­ies recog­nised in the State­ment of Com­pre­hens­ive Net Expendit­ure for the year ended 31 March 2026 was £29,621 (2024÷25: £33,330).

Page 116 of 122

Note 19. Con­tin­gent liabilities The Park Author­ity is the lead body for pro­jects sup­por­ted by the Nation­al Her­it­age Lot­tery Fund, includ­ing the Caper­cail­lie Frame­work Pro­ject and the new Cairngorms 2030: People and Nature Thriv­ing Togeth­er (formerly known as the Her­it­age Hori­zons pro­ject), as well as being the Account­able Body for Cairngorms LEAD­ER, which admin­istered the European fun­ded pro­ject (LEAD­ER) on behalf of the Cairngorms Loc­al Action Group (con­cluded in 2021⁄22).

Giv­en the nature of these arrange­ments, whereby advances are made to pro­jects and grant applic­ants, which, in turn, are reclaimed from the fun­ders, it is pos­sible that funds advanced may fall to be irre­cov­er­able. At this time, wheth­er any liab­il­ity will arise, or what its value might be, are mat­ters of uncertainty.

Beavers were rein­tro­duced to the Park in Decem­ber 2023 and, as a con­sequence, con­cern was expressed about the effect of beaver bur­row­ing on flood banks and the res­ult­ing impact on agri­cul­tur­al land. The Park Author­ity will provide grant assist­ance for any breach in the flood banks in the Nation­al Park that is proven to be caused by beaver bur­row­ing, and where the flood bank was shown pre­vi­ously to be in good con­di­tion. This com­mit­ment of grant sup­port is under­pinned by flood embank­ment sur­veys that estab­lish their cur­rent con­di­tion as a baseline, and the require­ment for evid­ence that beaver bur­row­ing caused dam­age lead­ing to col­lapse of the flood embank­ment. The Dir­ect­ors are of the opin­ion that the like­li­hood of fin­an­cial claim from this arrange­ment is low, and no claims have been made to date. The poten­tial fin­an­cial cost per annum is estim­ated to be a max­im­um of £50,000, which is judged to be the max­im­um cost of repair­ing a breach.

Note 20. Related party transactions The Park Author­ity is a Non-depart­ment­al Pub­lic Body of the Scot­tish Gov­ern­ment. The Park Authority’s spon­sor­ing body is the Nat­ur­al Resources Divi­sion, Envir­on­ment & Forestry Directorate.

The Scot­tish Gov­ern­ment and the Nat­ur­al Resources Divi­sion, Envir­on­ment & Forestry Dir­ect­or­ate are regarded as related parties. Dur­ing the year, The Park Author­ity has had vari­ous mater­i­al trans­ac­tions with the Depart­ment and with oth­er entit­ies for which the Depart­ment is regarded as the par­ent Depart­ment, viz: Forestry and Land Scot­land, Loch Lomond & Trossachs Nation­al Park, NatureScot, Scot­tish Envir­on­ment­al Pro­tec­tion Agency (SEPA), Scot­tish Land Commission.

Page 117 of 122

In addi­tion, the Park Author­ity has had a small num­ber of mater­i­al trans­ac­tions with oth­er Scot­tish Gov­ern­ment depart­ments and oth­er cent­ral, loc­al and UK gov­ern­ment bod­ies includ­ing: Aber­deen­shire Coun­cil, Angus Alive, Audit Scot­land, Civil Ser­vice Pen­sion Fund, HITRANS, High­land Coun­cil, HM Rev­en­ue & Cus­toms, Nation­al Parks Part­ner­ship LLP, Scot­tish Police Author­ity and South of Scot­land Enterprise.

There were neither pay­ments nor receipts out­stand­ing at either year end.

No Board mem­ber, seni­or man­ager or oth­er related parties have under­taken any mater­i­al trans­ac­tions with the Park Author­ity dur­ing the year.

The table below provides inform­a­tion on trans­ac­tions under­taken by the Park Author­ity with organ­isa­tions sup­por­ted by Board mem­bers and seni­or managers.

Page 118 of 122

Board Mem­berOrgan­isa­tionRela­tion2026 Pay­ments £’0002026 Receipts £’0002025 Pay­ments £’0002025 Receipts £’000
Geva Black­ettBal­later Roy­al DeesideMem­ber--5-
Brae­mar Com­munity LimitedHus­band — Chair--31-
Deeside Com­munity Game LarderPro­posed Trustee47---
Marr Area PartnershipHus­band — Chair40-10-
Sandy Brem­nerSave the Spring ProgrammeSteer­ing Group Member45---
The River Dee TrustTrust­ee and Director145---
Jack­ie BriertonGrow­bizPast CEO--30-
Dav­id Camer­on, Elean­or MackintoshCairngorms TrustTrust­ees144-50-
Peter Cos­groveGrant Arms HotelReceipt of hospitality8---
Rus­sell JonesKin­gussie Caman­achd ClubPast Pres­id­ent20---
John KirkNethy Bridge Com­munity CentreMem­ber5---
Elean­or MackintoshTomin­toul and Glen­liv­et Devel­op­ment TrustMem­ber10---
Fiona McLearnNation­al Lot­tery Her­it­age FundMem­ber of Com­mit­tee of Scotland-1,029-1,868
Nation­al Trust for ScotlandMem­ber41---
Uni­ver­sity of the High­lands and IslandsRect­or5-5-

Page 119 of 122

Board Mem­berOrgan­isa­tionRela­tion2026 Pay­ments £’0002026 Receipts £’0002025 Pay­ments £’0002025 Receipts £’000
Grant MoirNation­al Parks PartnershipMem­ber22---
Steve Mickle­wrightTrees for LifeEmploy­ee42---
Duncan MilerTul­lochgor­um FarmPart­ner26---
Xan­der McDade (to Septem­ber 2024)Nation­al Parks UKRep­res­ent­at­ive--1263

Page 120 of 122

Note 21. Third-party assets The Park Author­ity acts as cus­todi­an for cash received for res­tor­a­tion and after­care of two quar­ries (£213,812) and for developers’ con­tri­bu­tions (£213,428) held until such time that a decision is made on the applic­a­tion of those funds. Neither the Park Author­ity nor Scot­tish Gov­ern­ment more gen­er­ally has a dir­ect bene­fi­cial interest in those funds at the year end. Third-party assets are not pub­lic assets and are not recor­ded in the primary fin­an­cial statements.

2026 £’0002025 £’000
Bank bal­ances and mon­ies on deposit427347

Page 121 of 122

APPENDIX 1 – ACCOUNTS DIRECTION

  1. The Scot­tish Min­is­ters, in pur­su­ance of The Nation­al Parks (Scot­land) Act 2000, hereby give the fol­low­ing direction.

  2. The state­ment of accounts for the fin­an­cial year ended 31 March 2022, and sub­sequent years, shall com­ply with the account­ing prin­ciples and dis­clos­ure require­ments of the edi­tion of the Gov­ern­ment Fin­an­cial Report­ing Manu­al (FReM) which is in force for the year for which the state­ment of accounts are prepared.

  3. The accounts shall be pre­pared so as to give a true and fair view of the income and expendit­ure and cash flows for the fin­an­cial year, and of the state of affairs as at the end of the fin­an­cial year.

  4. This dir­ec­tion shall be repro­duced as an appendix to the state­ment of accounts. The dir­ec­tion giv­en on 12 Janu­ary 2006 is hereby revoked.

Signed: Don­ald Hende­r­son, Deputy Dir­ect­or of Nature Divi­sion by the author­ity of the Scot­tish Ministers