Formal Board Paper 7 - Board Committee's Annual Reports to the Board

Cairngorms Nation­al Park Author­ity Ugh­dar­ras Pàirc Nàiseanta a’ Mhon­aidh Ruaidh

Form­al Board Paper 7 26 Novem­ber 2026 Page 1 of 1

For inform­a­tion

Title: Board Committee’s Annu­al Reports to the Board Pre­pared by: Mari­aan Pita, Exec­ut­ive Sup­port Manager

Pur­pose

This paper presents the annu­al report of the Audit and Risk Com­mit­tee, Per­form­ance Com­mit­tee and Resources Com­mit­tee to Board mem­bers for comment.

Recom­mend­a­tions

The Board is asked to note the Annu­al Reports to the Board from the: a) Audit and Risk Com­mit­tee b) Per­form­ance Com­mit­tee c) Resources Committee

Back­ground

  1. In line with intern­al audit recom­mend­a­tions and as an ele­ment of the remit of the Com­mit­tees, each Com­mit­tee sub­mits an annu­al report cov­er­ing its activ­it­ies and reflect­ing on its oper­a­tions over the course of the last year to the full board. This paper presents the report for the Audit and Risk Com­mit­tee, Per­form­ance Com­mit­tee and Resources Com­mit­tee over the last annu­al cycle.

Mari­aan Pita 12 Novem­ber 2026 Mariaanpita@​cairngorms.​co.​uk


Cairngorms Nation­al Park Author­ity Ugh­dar­ras Pàirc Nàiseanta a’ Mhon­aidh Ruaidh

Audit and Risk Com­mit­tee Page 1 of 6

For decision

Title: Draft Audit and Risk Com­mit­tee annu­al report Pre­pared by: Mari­aan Pita, Exec­ut­ive Sup­port Manager

Pur­pose

To present the draft Audit & Risk Com­mit­tee Report for con­sid­er­a­tion pri­or to sub­mis­sion to the Board.

Recom­mend­a­tion

The Audit & Risk Com­mit­tee is reques­ted to: a) Con­sider the report and; b) Agree any amend­ments to it pri­or to cir­cu­la­tion to the Board.

Back­ground

  1. The Audit & Risk Com­mit­tee is required to report to the full Board on its activ­it­ies over the year, and on the reports presen­ted to the Com­mit­tee by the Authority’s intern­al and extern­al auditors.

  2. This Annu­al Report is presen­ted on behalf of the Audit & Risk Com­mit­tee to cov­er the peri­od of its oper­a­tions from Octo­ber 2025 to Octo­ber 2026.

Over­view

  1. The Com­mit­tee has over­seen the con­duct of the extern­al audit of the 2025⁄26 annu­al report and accounts dur­ing this peri­od, with the draft accounts for this fin­an­cial year sub­mit­ted to the committee’s meet­ing of Octo­ber 2026 in line with the agreed timetable for the 25⁄26 audit.

  2. Dur­ing the report­ing peri­od, the Com­mit­tee was sup­por­ted by Wbg as the Authority’s intern­al aud­it­ors and Maz­ars remain appoin­ted through Audit Scot­land as extern­al aud­it­ors to the Park Authority.


Cairngorms Nation­al Park Author­ity Ugh­dar­ras Pàirc Nàiseanta a’ Mhon­aidh Ruaidh

Audit and Risk Com­mit­tee Page 2 of 6

  1. The Com­mit­tee has con­tin­ued to work to the terms of ref­er­ence approved by the Board and main­tained over­sight of the Authority’s gov­ernance, risk man­age­ment, intern­al con­trol frame­work and fin­an­cial report­ing arrangements.

  2. The Com­mit­tee met three times over the peri­od covered by this report. All meet­ings were held as sched­uled and were quorate.

Key Activ­it­ies

  1. In addi­tion to man­age­ment reports from the Authority’s Intern­al and Extern­al Aud­it­ors, the com­mit­tee con­sidered the fol­low­ing mat­ters dur­ing the year: c) Risk man­age­ment: The Com­mit­tee main­tained stra­tegic over­sight of the Authority’s risk man­age­ment arrange­ments through reg­u­lar con­sid­er­a­tion of the Stra­tegic Risk Register. Reviews were under­taken in March, June and Octo­ber 2026, with con­sid­er­a­tion of wheth­er risks, con­trols and mit­ig­a­tion remained aligned with deliv­ery of the Cor­por­ate Plan 2023 to 2027 and evolving pri­or­it­ies. d) Gov­ernance: The Com­mit­tee con­sidered intern­al audit reviews of gov­ernance arrange­ments, includ­ing pro­ject ini­ti­ation and the gov­ernance frame­work sup­port­ing pro­ject man­age­ment. The Com­mit­tee mon­itored man­age­ment responses and actions arising from these reviews, provid­ing assur­ance that gov­ernance struc­tures and con­trols con­tin­ue to sup­port effect­ive decision-mak­ing and deliv­ery of the Authority’s pro­grammes and pro­jects. e) Fin­an­cial man­age­ment sys­tems: The Com­mit­tee con­sidered the intern­al audit review of the new fin­ance sys­tem, includ­ing the effect­ive­ness of con­trols and imple­ment­a­tion arrange­ments. f) Grants admin­is­tra­tion: The Com­mit­tee con­sidered the intern­al audit review of grants admin­is­tra­tion and man­age­ment and mon­itored actions arising from recom­mend­a­tions g) Busi­ness con­tinu­ity and IT resi­li­ence: The Com­mit­tee con­sidered an intern­al audit advis­ory review of IT dis­aster recov­ery arrange­ments and dis­cussed oppor­tun­it­ies to strengthen organ­isa­tion­al resi­li­ence and busi­ness con­tinu­ity plan­ning. The review iden­ti­fied a num­ber of exist­ing strengths and high­lighted oppor­tun­it­ies to fur­ther strengthen resi­li­ence through improved doc­u­ment­a­tion, clear­er recov­ery pri­or­it­ies, enhanced backup assur­ance, and

Cairngorms Nation­al Park Author­ity Ugh­dar­ras Pàiseanta a’ Mhon­aidh Ruaidh

Audit and Risk Com­mit­tee Page 3 of 6

reg­u­lar test­ing of recov­ery arrange­ments. Six improve­ment actions were iden­ti­fied to sup­port the con­tin­ued devel­op­ment of the Authority’s abil­ity to recov­er crit­ic­al sys­tems and ser­vices in the event of a major dis­rup­tion or cyber incident.

h) **Cairngorms 2030 Programme:** The Committee maintained oversight of governance and risk management associated with the Cairngorms 2030 Programme. Members received a detailed report on development of the Cairngorms 2030 Communities Fund and considered associated opportunities and risks.
i) **Procurement:** The Committee considered the draft Annual Procurement Report and monitored the continued development and implementation of procurement arrangements across the Authority
j) **Letter of representation:** the Committee considered the draft letter of representation from the Authority to Mazars, the external auditor, prior to its signature by the Accountable Officer, as an appropriate reflection of the Authority's position for preparation of the accounts for 2025/26 and conduct of the Authority's financial and wider control procedures over the course of the year. The Committee has also reviewed the underpinning detail set out in assurances to the external auditor relating to preventing fraud in the annual accounts, compliance with laws and regulations, litigation and claims, and going concern.
k) The Committee reviewed updates on information requests and complaints, ensuring appropriate oversight and consideration of matters presented.

Intern­al Audit

  1. The Com­mit­tee agreed and mon­itored deliv­ery of the intern­al audit plan dur­ing the year and con­sidered pro­gress reports from the intern­al aud­it­or. The Intern­al Audit Plan for 2026⁄27 was approved in March 2026.

  2. The Com­mit­tee con­sidered the fol­low­ing intern­al audit reviews dur­ing the report­ing period


Cairngorms Nation­al Park Author­ity Ugh­dar­ras Pàirc Nàiseanta a’ Mhon­aidh Ruaidh

Audit and Risk Com­mit­tee Page 4 of 6

Table One: Sum­mary of Intern­al Audit Findings

Intern­al Audit StudyNum­ber of Recommendations
Very High RiskHigh RiskMod­er­ate RiskLim­ited Risk
2011⁄12 Total (7 studies)03149
2012⁄13 Total (4 studies)00010
2013⁄14 Total (7 studies)01911
2014⁄15 Total (4 studies)00513
2015⁄16 Total (9 studies)00910
2016⁄17 Total (8 studies)n/​a01111
2017⁄18 Total (3 studies)n/​a037
2018⁄19 Total (9 studies)n/​a1610
2019⁄21 Total (9 studies)051621
2021⁄22 Total (5 studies)04102
2022⁄23 Total (6 studies)29115
2023⁄24 Total (3 stud­ies + 2 advisory)4780
2023⁄24 Total4780
2024⁄25 Total (6 stud­ies +1 advisory)0061
2025⁄26 (7 stud­ies + 1 advisory)Very High RiskHigh RiskMod­er­ate RiskLim­ited Risk
Payroll0000
Gov­ernance0002
New fin­ance system00110
Pro­ject initiation0014
Com­plaints handling0012

Cairngorms Nation­al Park Author­ity Ugh­dar­ras Pàirc Nàiseanta a’ Mhon­aidh Ruaidh

Audit and Risk Com­mit­tee Page 5 of 6

Grants admin­is­tra­tion and man­age­ment0004
IT dis­aster recov­ery (advis­ory)n/​an/​an/​an/​a
Total for period00312

Extern­al Audit

  1. The Com­mit­tee con­sidered the Extern­al Audit Annu­al Report, togeth­er with the 2025⁄26 Draft Annu­al Report and Accounts and Let­ter of Rep­res­ent­a­tion, at its Octo­ber 2026 meet­ing. The Com­mit­tee reviewed and approved the accounts pri­or to their sub­mis­sion for sig­na­ture by the Account­able Officer and sub­sequent lay­ing before the Scot­tish Parliament.

  2. The Com­mit­tee mon­itored pro­gress of the extern­al audit through­out the year and con­sidered updates from Maz­ars at its March, June and Octo­ber meetings.

Stra­tegic Risk Management

  1. The Com­mit­tee con­tin­ued to over­see the Authority’s stra­tegic approach to risk man­age­ment through con­sid­er­a­tion of the Stra­tegic Risk Register at key stages through­out the year. It con­sidered wheth­er risk own­ers, con­trols and mit­ig­a­tion meas­ures remained appro­pri­ate to sup­port deliv­ery of stra­tegic objectives.

  2. The Com­mit­tee focused in par­tic­u­lar on risks asso­ci­ated with deliv­ery of major pro­grammes and pro­jects, includ­ing Cairngorms 2030, to ensure stra­tegic risks and emer­ging threats were iden­ti­fied, mon­itored and man­aged appropriately.

  3. The Com­mit­tee also con­sidered risk implic­a­tions arising from changes to organ­isa­tion­al sys­tems, gov­ernance arrange­ments and oper­a­tion­al deliv­ery. This included review of the Stra­tegic Risk Register at its March, June and Octo­ber 2026 meetings.


Cairngorms Nation­al Park Author­ity Ugh­dar­ras Pàirc Nàiseanta a’ Mhon­aidh Ruaidh

Audit and Risk Com­mit­tee Page 6 of 6

Con­clu­sions

  1. The Audit & Risk Com­mit­tee con­siders that it has been suc­cess­ful in pro­gress­ing the Board’s gov­ernance and intern­al con­trol pri­or­it­ies dur­ing the peri­od covered by this annu­al report.

  2. The Com­mit­tee wel­comes the work of the Authority’s Fin­ance team in once again main­tain­ing a high qual­ity and pro­fes­sion­al fin­an­cial account­ing ser­vice. The Com­mit­tee also recog­nises the valu­able work of the wider Cor­por­ate Ser­vices team in sup­port­ing a rap­idly expand­ing range of activ­it­ies and deliv­ery by the Park Author­ity and in help­ing achieve the organisation’s stra­tegic objectives.

  3. The Com­mit­tee has engaged through the year with issues iden­ti­fied by the Authority’s intern­al and extern­al aud­it­ors, and also by the Authority’s officers. The Com­mit­tee has received full reports on issues raised; con­sidered recom­mend­a­tions made; and approved responses and actions. The Com­mit­tee has shaped and approved the over­all audit plan and guided the dir­ec­tion and approach of the intern­al aud­it­ors and their pro­gramme of work. The Com­mit­tee has also mon­itored deliv­ery against approved action plans.

  4. Both the intern­al and extern­al aud­it­ors’ find­ings provide assur­ance to the Com­mit­tee and Board that the Authority’s intern­al con­trol and gov­ernance object­ives are being met effect­ively by management.

  5. The Com­mit­tee will con­tin­ue to over­see stra­tegic risk man­age­ment, gov­ernance, fin­an­cial man­age­ment and value for money, and to pro­mote the use of les­sons from audit activ­ity and oper­a­tion­al exper­i­ence to improve the Authority’s sys­tems and processes.

Mari­aan Pita for Audit & Risk Com­mit­tee mem­bers 20 Octo­ber 2026 mariaanpita@​cairngorms.​co.​uk


Cairngorms Nation­al Park Author­ity Ugh­dar­ras Pàirc Nàiseanta a’ Mhon­aidh Ruaidh

Per­form­ance Com­mit­tee Page 1 of 4

For inform­a­tion

Title: Com­mit­tee Annu­al Report Pre­pared by: Mari­aan Pita, Exec­ut­ive Sup­port Manager

Pur­pose

This paper presents the draft Annu­al Report of the Per­form­ance Com­mit­tee to mem­bers for com­ment pri­or to cir­cu­la­tion to the full board.

Recom­mend­a­tions

The Com­mit­tee is asked to: a) Con­sider the draft annu­al report of the Per­form­ance Com­mit­tee. b) Agree any amend­ments to the draft pri­or to cir­cu­la­tion to the full board.

Back­ground

In accord­ance with intern­al audit recom­mend­a­tions, and as part of the Com­mit­tees’ respons­ib­il­it­ies, each Com­mit­tee sub­mits an annu­al report to the Board out­lining its activ­it­ies and reflect­ing on its oper­a­tions over the past year.

This paper presents the annu­al report of the Per­form­ance Com­mit­tee, which has now com­pleted its report­ing cycle for the year.


Cairngorms Nation­al Park Author­ity Ugh­dar­ras Pàirc Nàiseanta a’ Mhon­aidh Ruaidh

Per­form­ance Com­mit­tee Page 2 of 4

Per­form­ance Com­mit­tee Annu­al Report to Board for Peri­od Septem­ber 2025 to Septem­ber 2026

Activ­ity in period

  1. The Com­mit­tee met four times up to and includ­ing the meet­ing of 11 Septem­ber 2026 in the peri­od covered by this report. The committee’s work over the peri­od was guided by an agreed pro­gramme of work.

  2. In accord­ance with its Terms of Ref­er­ence, the Com­mit­tee provided scru­tiny and assur­ance over the deliv­ery of key pro­grammes, pro­jects and stat­utory func­tions where the Park Author­ity has a lead role or sig­ni­fic­ant deliv­ery respons­ib­il­ity. The Com­mit­tee con­sidered updates on: a) Cairngorms 2030, includ­ing quarterly pro­gramme deliv­ery reports and them­at­ic updates provided by the respect­ive leads, with in-depth reviews on areas such as restor­ing and enhan­cing land­scapes and trans­port. b) Cairngorms Peat­land ACTION Pro­gramme. c) Cairngorms Beaver Pro­ject. d) Cairngorms Nature Action Plan. e) Cairngorms Com­munity Led Loc­al Devel­op­ment (CLLD) and Cairngorms Trust deliv­ery. f) Deer incent­ive scheme g) Com­mu­nic­a­tions and Engage­ment activ­ity and asso­ci­ated per­form­ance meas­ures. h) Cli­mate adapt­a­tion fund 2025⁄26. i) Deliv­ery of stat­utory duties not­ing the sum­mary of access case­work under­taken by the Access and Infra­struc­ture Team, as con­ferred by the Land Reform (Scot­land) Act 2003. j) Emer­ging oppor­tun­it­ies relat­ing to col­lab­or­a­tion with the Scot­tish Food Com­mis­sion and wider pub­lic ser­vice reform

Review of Activ­it­ies and Commentary

  1. The Com­mit­tee con­tin­ued to focus on the deliv­ery and per­form­ance of major pro­grammes and pro­jects that con­trib­ute dir­ectly to the Park Authority’s stra­tegic object­ives and Nation­al Park Part­ner­ship Plan outcomes.

Cairngorms Nation­al Park Author­ity Ugh­dar­ras Pàirc Nàiseanta a’ Mhon­aidh Ruaidh

Per­form­ance Com­mit­tee Page 3 of 4

  1. A sig­ni­fic­ant pro­por­tion of the Committee’s work related to over­sight of the Cairngorms 2030 Pro­gramme. Reg­u­lar quarterly updates, togeth­er with them­at­ic deep dives, enabled mem­bers to mon­it­or pro­gress, risks, fund­ing and deliv­ery arrange­ments across this sub­stan­tial pro­gramme of work.

  2. The Com­mit­tee con­sidered pro­gress across a range of nature res­tor­a­tion and land man­age­ment pro­grammes, includ­ing peat­land res­tor­a­tion, beaver res­tor­a­tion activ­ity, deliv­ery of the Nature Action Plan and the Deer Incent­ive Scheme. Mem­bers were sat­is­fied that these pro­grammes con­tin­ued to make a sig­ni­fic­ant con­tri­bu­tion towards the Nation­al Park’s biod­iversity and cli­mate objectives.

  3. The Com­mit­tee also reviewed pro­gress in com­munity devel­op­ment and stake­hold­er engage­ment activ­ity through updates on the Cairngorms Trust, Com­munity Led Loc­al Devel­op­ment, com­mu­nic­a­tions and engage­ment activ­ity, and deliv­ery of stat­utory access duties. These reports provided assur­ance that the Author­ity con­tin­ues to work effect­ively with com­munit­ies, part­ners and stake­hold­ers across the Nation­al Park.

  4. There were no mat­ters dur­ing the report­ing peri­od requir­ing escal­a­tion to the Board. The Com­mit­tee was, how­ever, able to provide con­struct­ive chal­lenge and sup­port to officers on pro­gramme deliv­ery, per­form­ance report­ing and the man­age­ment of risks and oppor­tun­it­ies across a range of activities.

  5. The Com­mit­tee has con­tin­ued to review and refine its for­ward work pro­gramme to ensure over­sight remains focused on key stra­tegic pro­grammes, pro­jects and emer­ging areas of activ­ity. A pro­gramme of work for 2027 will be agreed at the meet­ing of 11 Decem­ber 2026.

Con­clu­sions

  1. The Com­mit­tee has oper­ated effect­ively dur­ing the report­ing peri­od in accord­ance with its Terms of Ref­er­ence, sup­port­ing the Board’s over­sight of pro­gramme deliv­ery, stra­tegic out­comes and organ­isa­tion­al performance.

  2. Through its work, the Com­mit­tee has sup­por­ted the Board’s over­sight of organ­isa­tion­al per­form­ance and deliv­ery against stra­tegic object­ives, while main­tain­ing a focus on out­comes, impacts and con­tinu­ous improvement.


Cairngorms Nation­al Park Author­ity Ugh­dar­ras Pàirc Nàiseanta a’ Mhon­aidh Ruaidh

Per­form­ance Com­mit­tee Page 4 of 4

  1. The Com­mit­tee wishes to record its thanks to officers for the qual­ity of reports presen­ted through­out the year and for their con­struct­ive engage­ment in sup­port­ing the Committee’s work.

Mari­aan Pita 30 Octo­ber 2026 mariaanpita@​cairngorms.​co.​uk


Cairngorms Nation­al Park Author­ity Ugh­dar­ras Pàirc Nàiseanta a’ Mhon­aidh Ruaidh

Resources Com­mit­tee Paper 3 06 Novem­ber 2026 Page 1 of 4

For inform­a­tion

Title: Resources com­mit­tee annu­al report Pre­pared by: Mari­aan Pita, Exec­ut­ive Sup­port Manager

Pur­pose

  1. This paper presents the annu­al report of the Resources Com­mit­tee to mem­bers for com­ment pri­or to cir­cu­la­tion to the Board.

Recom­mend­a­tions

  1. The Com­mit­tee is asked to: a) Con­sider the draft annu­al report of the Resources Com­mit­tee. b) Agree any amend­ments to the draft pri­or to cir­cu­la­tion to the Board.

Back­ground

  1. In line with intern­al audit recom­mend­a­tions and as an ele­ment of the remit of the Com­mit­tees, each Com­mit­tee sub­mits an annu­al report cov­er­ing its activ­it­ies and reflect­ing on its oper­a­tions over the course of the last year to the Board. This paper presents the report for the Resources Com­mit­tee over the last annu­al cycle.

Cairngorms Nation­al Park Author­ity Ugh­dar­ras Pàirc Nàiseanta a’ Mhon­aidh Ruaidh

Resources Com­mit­tee Paper 3 06 Novem­ber 2026 Page 2 of 4

Resources Com­mit­tee Annu­al Report to Board for Peri­od Novem­ber 2025 to Octo­ber 2026

Activ­ity in Period

  1. The Com­mit­tee met five times up to and includ­ing Octo­ber 2026 in the peri­od covered by this report.

  2. The Com­mit­tee has scru­tin­ised management’s work and sought assur­ance over the fol­low­ing key aspects of the Cairngorms Nation­al Park Authority’s oper­a­tions over the course of the report­ing peri­od: a) Chief Exec­ut­ive pay b) Staff pay pos­i­tion c) Budget mon­it­or­ing for both 2024⁄25 and 2025⁄26 d) Budget man­age­ment and devel­op­ment of future budget estim­ates. e) Health and Safety oper­a­tions. f) Staff engage­ment, includ­ing Staff Con­sultat­ive For­um dis­cus­sions. g) Work­force Man­age­ment Strategy 2030 h) Oper­a­tion­al Devel­op­ment and People Strategy i) Ana­lys­is of fund­ing provided to com­munit­ies with­in the Nation­al Park j) Deliv­er­ing the Cairngorms Nation­al Park Authority’s Equal­ity Duties, includ­ing scru­tiny of the Park Authority’s Equal Pay Audit. k) Staff absence report l) Report on staff turnover in 2025

  3. The Park Author­ity con­tin­ues to focus on the poten­tial to secure sig­ni­fic­ant inward grant fund­ing and private fin­ance in sup­port of its activities.

Review of activ­it­ies and commentary

  1. Over­all, the com­mit­tee feels it has been suc­cess­ful in dis­char­ging its remit and per­form­ing an appro­pri­ate and valu­able ele­ment of the Park Authority’s gov­ernance and assur­ance pro­cesses. Appro­pri­ate areas of over­lap with oth­er com­mit­tees on per­form­ance and risk man­age­ment have been recog­nised and min­im­ised, with mat­ters passed on between Com­mit­tees with­in their remits as necessary.

Cairngorms Nation­al Park Author­ity Ugh­dar­ras Pàirc Nàiseanta a’ Mhon­aidh Ruaidh

Resources Com­mit­tee Paper 3 06 Novem­ber 2026 Page 3 of 4

  1. This annu­al report is more a fac­tu­al record of the activ­it­ies of the Com­mit­tee over the peri­od, rather than a qual­it­at­ive eval­u­ation of the work of the Committee.

  2. There have been no instances of need for escal­a­tion of con­cerns to the Board. Where appro­pri­ate, rel­ev­ant mat­ters have been high­lighted to oth­er com­mit­tees to sup­port coordin­ated assur­ance and effect­ive governance.

  3. The Com­mit­tee con­sidered a broad range of fin­an­cial, organ­isa­tion­al devel­op­ment and work­force mat­ters dur­ing the year. Par­tic­u­lar atten­tion was giv­en to fin­an­cial plan­ning and mon­it­or­ing, work­force strategy, staff engage­ment, health and safety, equal­ity and work­force met­rics. Through this work, the Com­mit­tee has provided assur­ance to the Board regard­ing the effect­ive­ness of man­age­ment arrange­ments and intern­al con­trols across these areas.

  4. The Com­mit­tee also con­sidered sev­er­al stra­tegic work­force mat­ters in a con­fid­en­tial ses­sion dur­ing the year, includ­ing long-term work­force plan­ning, organ­isa­tion­al devel­op­ment and employ­ee engage­ment. These dis­cus­sions sup­por­ted the Committee’s role in provid­ing stra­tegic over­sight of the Authority’s people resources.

  5. The Com­mit­tee received ana­lys­is of the geo­graph­ic­al dis­tri­bu­tion of grants and con­tract awards made dur­ing 2025⁄26, provid­ing assur­ance on the Authority’s con­tri­bu­tion to com­munity wealth build­ing with­in the Nation­al Park. The Com­mit­tee noted that 100% of grant fund­ing was awar­ded with­in the Park and that, over­all, 70% of grant and con­tract expendit­ure was dir­ec­ted towards bene­fit­ing com­munit­ies with­in the Park. Mem­bers also con­sidered the oppor­tun­it­ies and con­straints asso­ci­ated with pub­lic pro­cure­ment reg­u­la­tions and the actions being taken to increase oppor­tun­it­ies for loc­al sup­pli­ers and con­tract­ors to com­pete for future work.

  6. The Com­mit­tee has not iden­ti­fied any changes required to its terms of ref­er­ence over the course of this report­ing period.

Con­clu­sions

  1. The oper­a­tion of the Resources Com­mit­tee con­tin­ues to provide an import­ant and effect­ive com­pon­ent of the Park Authority’s assur­ance frame­work. Its over­sight of

Cairngorms Nation­al Park Author­ity Ugh­dar­ras Pàirc Nàiseanta a’ Mhon­aidh Ruaidh

Resources Com­mit­tee Paper 3 06 Novem­ber 2026 Page 4 of 4

fin­an­cial and people resources enables com­pre­hens­ive scru­tiny of the man­age­ment of these key areas, while sup­port­ing Mem­bers in provid­ing stra­tegic dir­ec­tion and con­trib­ut­ing to the effect­ive plan­ning and stew­ard­ship of the organisation’s resources.

  1. Cur­rent mem­bers believe there are no sig­ni­fic­ant changes needed in the Committee’s oper­a­tions over the com­ing year. Com­mit­tee mem­bers will con­tin­ue to work with seni­or officers to evolve and adapt report­ing struc­tures as required.

  2. The Com­mit­tee wishes to record its appre­ci­ation for the sup­port provided by officers through­out the year, par­tic­u­larly for the qual­ity of report­ing, pro­fes­sion­al advice and con­struct­ive engage­ment that has assisted the Com­mit­tee in car­ry­ing out its respons­ib­il­it­ies effectively.

Mari­aan Pita 19 Octo­ber 2026 mariaanpita@​cairngorms.​co.​uk