Formal Board Paper 8 Annex 1 - Committee Minutes

Form­al Board Paper 8 Annex 1 27 Novem­ber 2026 Page 1 of 24 Annex 1 Com­mit­tee Minutes Minutes of the Audit and Risk Com­mit­tee meet­ing Held online 19 June 2026 at 10.00am

Present Fiona McLean (Chair) Geva Black­ett Duncan Miller Ian McLar­en (Vice Chair) Bill Lob­ban Paul Gibb

In attend­ance Tom Reid, For­vis Maz­ars LLP Peter Clark, wbg Shaun Rod­dan, wbg Dav­id Camer­on, Dir­ect­or of Cor­por­ate Ser­vices and Deputy CEO Louise Allen, Head of Fin­ance and Oper­a­tions Sandy Allan, Inform­a­tion Sys­tems Man­ager until Eilidh Todd, Com­munit­ies and Rur­al Devel­op­ment Man­ager Brid­get Trus­sell, Com­munity Grants Man­ager Mikko Saari, Pro­cure­ment Officer Alix Hark­ness, Clerk to the Board

Form­al Board Paper 8 Annex 1 27 Novem­ber 2026 Page 2 of 24 Apo­lo­gies Grant Moir, Chief Exec­ut­ive Officer

Wel­come and apologies

  1. Fiona McLean, Chair of the Audit and Risk Com­mit­tee, wel­comed every­one to the meet­ing. Apo­lo­gies were noted.

Approv­al of minutes of pre­vi­ous meetings

  1. The draft minutes of the pre­vi­ous Audit and Risk Com­mit­tee meet­ing held on 13 March 2026 were approved with no amendments

Mat­ters arising not covered else­where | Ref | Action Detail | Who | When | Status | | —- | —- | —- | —- | —- | | 13/03/26 | At Para 18i
Refresh­er Audit & Risk Com­mit­tee train­ing to be organ­ised | Dav­id Camer­on | Fol­low­ing dir­ectly elec­ted elec­tions
March 2027 | | | 13/03/26 | At Para 28i)
Fol­low up audit on pro­ject ini­ti­ation to be car­ried out in 2027/2028. | Intern­al aud­it­ors | 2027⁄28 | |

  1. Louise Allen, Head of Fin­ance and Cor­por­ate Oper­a­tions referred to Paper 3 Intern­al audit review: New fin­ance sys­tem that was brought to the Com­mit­tee at their last meet­ing on 13 March 2026, which stated that out of office levels of author­ity were set appro­pri­ately. She had tried to put this con­trol in place it but it did not work as anti­cip­ated and there­fore con­sultancy will be needed to put that in place. She apo­lo­gised to the Com­mit­tee for hav­ing giv­en them the wrong inform­a­tion, as she had draf­ted the report before try­ing to do the work. She added that the expenses sys­tem was now up and run­ning and mak­ing a dif­fer­ence. Audit & Risk Com­mit­tee Chair acknow­ledged the update and advised there was no need for con­cern and said it was great to hear it was all in hand.

Form­al Board Paper 8 Annex 1 27 Novem­ber 2026 Page 3 of 24

  1. There were no oth­er mat­ters arising not covered elsewhere.

Declar­a­tions of interest

  1. There were no declar­a­tions of interest.

Intern­al audit annu­al report 2025/2026 (Paper 1)

  1. Peter Clark, wbg intro­duced the paper which sum­mar­ises the con­clu­sions and key find­ings from the intern­al audit work under­taken at Cairngorms Nation­al Park Author­ity dur­ing the year ended 31 March 2026, includ­ing the Intern­al Auditor’s over­all opin­ion on Cairngorms Nation­al Park Authority’s intern­al con­trol system.
  2. The Audit and Risk Com­mit­tee dis­cussed the report and made the fol­low­ing com­ments and obser­va­tions: a) The Chair quer­ied bench­mark­ing per­form­ance, not­ing that res­ults did not com­pare favour­ably. Assur­ance was provided by Peter Clark, wbg that there was no cause for con­cern, as the bench­mark­ing was based on a lim­ited sample size (two reviews). b) Dir­ect­or of Cor­por­ate Ser­vices and Deputy CEO noted that while res­ults appeared slightly weak­er, this was likely reflect­ive of the organisation’s ongo­ing growth and devel­op­ment. It was acknow­ledged that, although the pos­i­tion is not con­sidered a cause for imme­di­ate con­cern, it would con­tin­ue to be kept under review. c) Head of Fin­ance and Cor­por­ate Oper­a­tions raised a query regard­ing the basis of bench­mark­ing, spe­cific­ally wheth­er com­par­is­ons were made against organ­isa­tions of a sim­il­ar size or against imple­ment­a­tions of com­par­able com­plex­ity, not­ing the increased com­plex­ity of the recent fin­ance sys­tem imple­ment­a­tion. Peter Clark, wbg advised that bench­mark­ing was primar­ily under­taken against sim­il­ar organ­isa­tions; how­ever, as many com­par­able organ­isa­tions have exper­i­enced sim­il­arly com­plex sys­tem imple­ment­a­tions, this factor was con­sidered to be impli­citly reflec­ted with­in the bench­mark­ing. d) Dir­ect­or of Cor­por­ate Ser­vices and Deputy CEO com­men­ted on the repor­ted weak­ness in fol­low-up actions, not­ing the pres­ence of sev­er­al long-stand­ing recom­mend­a­tions. It was acknow­ledged that some earli­er recom­mend­a­tions by Azets, the pre­vi­ous intern­al aud­it­ors, had been broad in scope and required longer-term action to reach com­ple­tion. Assur­ance was provided that this issue was recog­nised and is being act­ively man­aged, with a focus on

Form­al Board Paper 8 Annex 1 27 Novem­ber 2026 Page 4 of 24 pro­gress­ing and clos­ing out­stand­ing actions over the com­ing year. It was fur­ther agreed that to date, recom­mend­a­tions from wbg have been more clearly defined and focused, and this has been help­ful in sup­port­ing their timely implementation.

  1. The Com­mit­tee con­sidered and noted the Intern­al Auditor’s over­all opin­ion as set out in page 4 of the report and endorsed the inclu­sion of that opin­ion with­in the Gov­ernance State­ment for 2025 – 26.
  2. Action Points Arising: None.

Intern­al audit review – IT dis­aster recov­ery advis­ory (Paper 2)

  1. Shaun Rod­dan, wbg presen­ted the res­ults of the Intern­al Auditor’s advis­ory review on IT dis­aster recov­ery pro­ced­ures. The pur­pose of the review was to assess the Park Authority’s IT Dis­aster Recov­ery (DR) arrange­ments in the con­text of cur­rent hybrid work­ing, cloud-based ser­vices, and recent digit­isa­tion. The review focused on the prac­tic­al effect­ive­ness of recov­ery plan­ning, sup­port­ing doc­u­ment­a­tion, and mit­ig­a­tion meas­ures, provid­ing prag­mat­ic recom­mend­a­tions to strengthen IT resi­li­ence going for­ward. This review formed part of our 2025⁄26 Intern­al Audit Annu­al Plan.
  2. Cairngorms Nation­al Park Author­ity staff made the fol­low­ing points: a) Head of Fin­ance and Cor­por­ate Oper­a­tions repor­ted it had been a really pos­it­ive exper­i­ence work­ing with Shaun Rod­dan and noted that devel­op­ment of the DR plan was some­thing the team needed helped with. She went on to recog­nise the know­ledge and skill with­in the team but that there is a need to doc­u­ment pro­cesses and pro­ced­ures. b) Sandy Allan, Inform­a­tion Sys­tems Man­ager explained he had found it a very use­ful pro­cess, high­lighted what the team already knew and iden­ti­fied a clear need around doc­u­ment­a­tion. c) Dir­ect­or of Cor­por­ate Ser­vices and Deputy CEO provided con­text link­ing the work on IT dis­aster recov­ery to the wider Busi­ness Con­tinu­ity Plan, not­ing that this area has remained a red-rated stra­tegic risk. He explained that the cur­rent work would con­trib­ute to a broad­er pro­gramme, incor­por­at­ing com­mu­nic­a­tions and organ­isa­tion­al response plan­ning, to devel­op an updated Busi­ness Con­tinu­ity Plan. The Chair wel­comed this joined-up, ​“twin-track” approach to risk man­age­ment and busi­ness continuity.

Form­al Board Paper 8 Annex 1 27 Novem­ber 2026 Page 5 of 24

  1. The Audit and Risk Com­mit­tee dis­cussed the report and made the fol­low­ing com­ments and obser­va­tions: a) A query was raised regard­ing the risk of staff inad­vert­ently act­ing on appar­ently legit­im­ate emails, par­tic­u­larly where com­mu­nic­a­tions appear to ori­gin­ate from trus­ted intern­al sources, and how con­sist­ent vigil­ance was main­tained. Inform­a­tion Sys­tems Man­ager advised that com­pre­hens­ive train­ing was in place, sup­por­ted by reg­u­lar aware­ness-rais­ing and staff com­mu­nic­a­tions. Plans are also in place to intro­duce sim­u­lated phish­ing exer­cises and enhanced test­ing to rein­force good prac­tice. It was acknow­ledged that cyber threats are increas­ingly soph­ist­ic­ated and that some resid­ual risk remains; how­ever, a strong cul­ture of aware­ness and ongo­ing train­ing provides assur­ance that this risk is being act­ively man­aged. b) The Chair thanked Shaun Rod­dan for the thor­ough and detailed report and praised the thor­ough­ness of intern­al audit review, not­ing the value of under­tak­ing advis­ory audits like these where appro­pri­ate. She exten­ded her thanks to the intern­al IT Team.

  2. The Audit and Risk Com­mit­tee agreed to the recom­mend­a­tions: a) Con­sider the intern­al auditor’s report and find­ings b) Endorse the man­age­ment responses to recom­mend­a­tions for future action and improvements

  3. Action Point Arising: None.

Sandy Allan and Shaun Rod­dan left the meet­ing at 10.38am

Intern­al audit review – com­plaints pro­ced­ure (Paper 3)

  1. Peter Clark, wbg presen­ted the res­ults of the Intern­al Auditor’s review on the Park Authority’s com­plaints pro­ced­ure. The pur­pose of the review was to con­sider the com­plaints hand­ling arrange­ments with­in the Park Author­ity, to assess wheth­er these are suf­fi­cient, fol­low good prac­tice, and adhere to cur­rent legis­la­tion and guid­ance. This review formed part of the 2026⁄27 Intern­al Audit Annu­al Plan.
  2. Deputy CEO and Dir­ect­or of Cor­por­ate Ser­vices made a com­ment on the com­plaints hand­ling review, not­ing the need to bal­ance trans­par­ent complaints

Form­al Board Paper 8 Annex 1 27 Novem­ber 2026 Page 6 of 24 pro­cesses with the organisation’s quasi-judi­cial plan­ning respons­ib­il­it­ies. He high­lighted that some com­plaints may be vex­a­tious or inap­pro­pri­ate, poten­tially pla­cing unne­ces­sary demands on resources. Assur­ance was provided that the recom­mend­a­tions have been accep­ted and that work would be under­taken to strengthen pro­cesses, includ­ing earli­er iden­ti­fic­a­tion of vex­a­tious com­plaints, while main­tain­ing a fair and appro­pri­ate approach to all val­id com­plaints. The import­ance of this bal­ance, giv­en leg­al con­sid­er­a­tions, was acknow­ledged by the Chair.

  1. The Audit and Risk Com­mit­tee dis­cussed the report and made the fol­low­ing com­ments and obser­va­tions: a) The Chair noted and wel­comed the import­ance of clearly defin­ing vex­a­tious com­plaints and the asso­ci­ated pro­cess. She con­sidered the report to be clear and provided appro­pri­ate assur­ance, with only minor recom­mend­a­tions iden­ti­fied. b) No fur­ther ques­tions were raised.

  2. The Audit and Risk Com­mit­tee agreed to the recom­mend­a­tions: a) Con­sider the intern­al auditor’s report and find­ings b) Endorse the man­age­ment responses to recom­mend­a­tions for future action and improvements

  3. Action Point Arising: None.

Extern­al audit update (Paper 4)

  1. Tom Reid, For­vis Maz­ars LLP presen­ted the extern­al auditor’s pro­gress report set­ting out the pro­gress on the 2025⁄26 final accounts audit.
  2. Head of Fin­ance and Cor­por­ate Oper­a­tions provided an update on the audit pro­cess: a) Draft accounts are pro­gress­ing well and at an advanced stage. b) Com­mit­ted to sub­mit­ting them to extern­al aud­it­or by the end of the month. c) Audit pro­cesses expec­ted to begin the fol­low­ing week. d) An on-site vis­it is planned towards the end of the audit. e) This vis­it should help resolve any out­stand­ing issues effi­ciently. f) Over­all pos­i­tion: nearly ready to proceed.

Form­al Board Paper 8 Annex 1 27 Novem­ber 2026 Page 7 of 24

  1. The Audit and Risk Com­mit­tee dis­cussed the report and made the fol­low­ing com­ments and obser­va­tions: a) The Chair com­men­ted the planned on-site audit vis­it is wel­comed as bene­fi­cial for respond­ing to quer­ies. She acknow­ledged the good pro­gress on pre­par­a­tions b) No ques­tions raised by mem­bers. c) The Chair looked for­ward to receiv­ing the final report by October.

  2. The Audit and Risk Com­mit­tee noted the update.

  3. Action Point Arising: None.

Extern­al audit assur­ances (Paper 5)

  1. Louise intro­duced the paper and sum­mar­ised what the annexes detail. Tom Reid, Maz­ars presen­ted the Request for inform­a­tion from Man­age­ment and Those Charged with Gov­ernance pre­pared by Mazars.
  2. The Audit and Risk Com­mit­tee dis­cussed the report and agreed they were happy with it.
  3. The Audit and Risk Com­mit­tee agreed to the recom­mend­a­tions: a) Endorse the man­age­ment responses to recom­mend­a­tions for future action and improvements

  4. Action Point Arising: None.

Stra­tegic risk registers (Paper 6)

  1. Deputy CEO and Dir­ect­or of Cor­por­ate Ser­vices presen­ted the paper which sup­ports a review by the Com­mit­tee of the Park Authority’s stra­tegic risk man­age­ment position.
  2. The Audit and Risk Com­mit­tee dis­cussed the report and made the fol­low­ing com­ment and obser­va­tion: a) The Chair quer­ied why the Com­munit­ies Fund does not appear on the stra­tegic risk register and sought con­firm­a­tion that no risks have been iden­ti­fied requir­ing escal­a­tion. Dir­ect­or of Cor­por­ate Ser­vices and Deputy CEO con­firmed that the Com­munit­ies Fund pro­ject risk register has been regularly

Form­al Board Paper 8 Annex 1 27 Novem­ber 2026 Page 8 of 24 repor­ted to the Board at recent meet­ings and would be con­sidered again at the next meet­ing. He added that, to date, no risks iden­ti­fied with­in the pro­ject risk register have been con­sidered sig­ni­fic­ant enough to war­rant escal­a­tion to the stra­tegic risk register. While Board dis­cus­sions have res­ul­ted in actions to update and refine the pro­ject risk register, it was agreed that the cur­rent approach remains appro­pri­ate. The Com­mit­tee noted this position.

Eilidh Todd arrived at 10.53 am Brid­get Trus­sell arrived at 10.56am and left at 10.57am Brid­get Trus­sell arrived at 10.58am

  1. The Audit and Risk Com­mit­tee agreed to the recom­mend­a­tions: a) Con­sider the cov­er­age and adequacy of the Park Authority’s stra­tegic risk man­age­ment pos­i­tion and advise on any gaps or amend­ments required to the cur­rent stra­tegic risk register. b) Con­sider the cov­er­age and adequacy of the Cairngorms 2030 pro­gramme risk man­age­ment pos­i­tion and advise on any gaps or amend­ments required to the cur­rent pro­gramme risk register.

  2. Action Point Arising: None.

Cairngorms 2030 Com­munit­ies Fund Devel­op­ment (Paper 7)

  1. Eilidh Todd presen­ted the update on the work of the Cairngorms 2030 (C2030) Com­munit­ies Fund Pan­el, sup­por­ted by our appoin­ted con­sult­ants, Involve, and the staff team, in devel­op­ing the C2030 Com­munity Grants Fund. The paper is brought to the Audit and Risk Com­mit­tee at this point to sup­port a dis­cus­sion on the risk man­age­ment of this pro­ject in advance of con­sid­er­a­tion of the status of the pro­ject by the full board at its meet­ing on 26 June 2026. Since writ­ing the paper Eilidh advised of a couple of devel­op­ments: a) One final online ses­sion remain­ing with the pan­el which would take place next Wed­nes­day 24 June 2026. b) Behind the scenes, staff are work­ing tire­lessly to pre­pare the ideas formed by the pan­el into a tan­gible and real­ist­ic doc­u­ment to present back to them at the final session.

Form­al Board Paper 8 Annex 1 27 Novem­ber 2026 Page 9 of 24 Mikko Saari arrived at 11.02am

  1. The Audit and Risk Com­mit­tee dis­cussed the report and made the fol­low­ing com­ments and obser­va­tions: a) A mem­ber asked what themes would be fun­ded and how was the over­lap with exist­ing funds being avoided? Com­munit­ies and Rur­al Devel­op­ment Man­ager advised that the pan­el were giv­en clear para­met­ers and inform­a­tion on exist­ing funds at the out­set to avoid duplic­a­tion. They focused on broad themes aligned with Cairngorms 2030 rather than spe­cif­ic pro­jects. b) A mem­ber asked what the four main fund­ing themes are? Com­munit­ies and Rur­al Devel­op­ment Man­ager con­firmed these were the four main C2030 Themes of: Empower com­munit­ies to share the future of their loc­al area. c) Trans­form the way land is man­aged and used to bene­fit nature. d) Make get­ting around the Cairngorms easi­er, safer and green­er. e) Foster health­i­er, hap­pi­er com­munit­ies with well­being at its heart empower­ing com­munit­ies, health and well­being, trans­form­ing trans­port, and nature. g) A mem­ber asked if spe­cif­ic pro­jects or fund­ing pri­or­it­ies already defined? Com­munit­ies and Rur­al Devel­op­ment Man­ager con­firmed they had not. She advised that pan­el has only set broad cri­ter­ia and prin­ciples; spe­cif­ic pro­jects would be determ­ined by com­munit­ies and their applic­a­tions after the fund opens for applic­a­tions. h) A mem­ber asked if there would be more detailed guid­ance on eli­gible pro­jects? Com­munit­ies and Rur­al Devel­op­ment Man­ager con­firmed that fur­ther detail would be avail­able and presen­ted at the Board meet­ing the fol­low­ing week. i) The Chair asked wheth­er the Com­munit­ies Fund approach, which gives com­munit­ies broad con­trol over fund­ing, was effect­ive; how the themes had been defined; and wheth­er the mod­el could be repeated without duplic­at­ing exist­ing funds. The Com­munity Grants Man­ager con­firmed that it could. She explained that the fund had been designed around four broad Cairngorms 2030 themes, with the pan­el giv­en clear para­met­ers and inform­a­tion on exist­ing fund­ing avail­ab­il­ity to avoid duplic­a­tion. At this stage, only high-level prin­ciples and cri­ter­ia had been set, with spe­cif­ic pro­jects to emerge once applic­a­tions open. The approach had demon­strated strong com­munity engage­ment, brought in new voices, and proved valu­able as a pro­cess in

Form­al Board Paper 8 Annex 1 27 Novem­ber 2026 Page 10 of 24 j) itself. It was con­sidered rep­lic­able in future, poten­tially with less reli­ance on con­sult­ants, and could be applied more widely across oth­er areas. The Chair asked what has been learned from the Com­munit­ies Fund pro­cess, par­tic­u­larly as an innov­at­ive test mod­el, and how has it worked in prac­tice? She acknow­ledged that the Com­munit­ies Fund has provided valu­able learn­ing as an innov­at­ive test bed, attract­ing interest from part­ners such as the Nation­al Lot­tery Her­it­age Fund as a mod­el that could be applied in oth­er con­texts. The pro­cess has demon­strated strong poten­tial for wider use, both with­in oth­er nation­al parks and more broadly. Com­munit­ies and Rur­al Devel­op­ment Man­ager advised that while over­all pro­gress had been pos­it­ive, it had also involved chal­len­ging dis­cus­sions, which were seen as an import­ant and neces­sary part of the pro­cess. A key strength was the use of inde­pend­ent facil­it­a­tion, allow­ing open and hon­est dia­logue without the Park Author­ity lead­ing dis­cus­sions. This cre­ated space for par­ti­cipants, includ­ing some ini­tially scep­tic­al of the Park Author­ity, to engage con­struct­ively and recog­nise its com­mit­ment to improve­ment. Over­all, it was repor­ted that the exper­i­ence has gen­er­ated import­ant insights into com­munity engage­ment, col­lab­or­a­tion, and future deliv­ery approaches. k) A mem­ber argued that the wider com­munity had not yet been engaged, only a small group of rep­res­ent­at­ives ie the Com­munity Fund Pan­el con­sist­ing of 18 mem­bers. Com­munity Grants Man­ager con­firmed that engage­ment thus far has been with the reflect­ive pan­el (approx. 18 mem­bers plus an advis­ory group), not the full com­munity. Wider com­munity involve­ment would come when the fund opens for applic­a­tions. l) A mem­ber asked what the pan­el has been asked to do. Com­munity Grants Man­ager advised that the pan­el have been tasked with design­ing the fund­ing pro­cess and prin­ciples, not select­ing pro­jects or mak­ing fund­ing decisions. m) A mem­ber raised con­cerns that suc­cess was being over­stated before the fund had been delivered. Com­munity Grants Man­ager acknow­ledged that the pro­ject was still in early stages; suc­cess so far relates to the innov­at­ive design pro­cess, with out­comes yet to be proven through deliv­ery. n) A mem­ber asked what the key achieve­ment so far was and how would effect­ive­ness be demon­strated? Dir­ect­or of Cor­por­ate Ser­vices and Deputy CEO advised that the fund has been designed by a reflect­ive group of poten­tial users, which is seen as a sig­ni­fic­ant and innov­at­ive shift from tra­di­tion­al cent­rally designed fund­ing mod­els. Com­munity Grants Manager

Form­al Board Paper 8 Annex 1 27 Novem­ber 2026 Page 11 of 24 o) advised that effect­ive­ness would be demon­strated through future deliv­ery; by assess­ing demand, applic­a­tions received, and how well fun­ded pro­jects align with the fund’s cri­ter­ia. A mem­ber asked what hap­pens next. Com­munit­ies and Rur­al Devel­op­ment Man­ager explained the next steps were clear com­mu­nic­a­tion of the cur­rent stage, fol­lowed by open­ing the fund, enabling applic­a­tions, and eval­u­at­ing out­comes over time. p) The Chair asked how the Com­munit­ies Fund would be mon­itored and sought assur­ance that there was con­fid­ence in the pro­posed approach. The Com­munit­ies and Rur­al Devel­op­ment Man­ager explained that mon­it­or­ing would be under­taken in two parts: i. The pro­cess (how the pan­el and design stage oper­ated), sup­por­ted by a struc­tured eval­u­ation pro­gramme. ii. The grants deliv­ery (how fund­ing is used and what out­comes are achieved), which will include built-in mon­it­or­ing of out­puts and impacts. Com­munity Grants Man­ager provided reas­sur­ance that there was con­fid­ence in the approach, as mon­it­or­ing and eval­u­ation are estab­lished prac­tices, and sys­tems will be developed along­side the next stage of deliv­ery. q) The Chair thanked the staff for this inform­a­tion and asked if mon­it­or­ing would be integ­rated into the next phase of the fund? Com­munity Grants Man­ager con­firmed that mon­it­or­ing require­ments would be built into the design of the fund­ing pro­cess and future decision-mak­ing stages ensur­ing out­comes are tracked effect­ively. r) A mem­ber sought clar­ity on how the pan­el was made inclus­ive for dif­fer­ent demo­graph­ics and work­ing pat­terns. Com­munit­ies and Rur­al Devel­op­ment Man­ager provided reas­sur­ance that a mix of even­ing online ses­sions and week­end in per­son meet­ings was used, along­side pay­ment, expenses, and child­care sup­port, enabling broad par­ti­cip­a­tion across ages and life­styles, includ­ing typ­ic­ally harder to reach groups like work­ing par­ents. s) The Chair asked what the risks were in trans­ition­ing from the design phase to the deliv­ery phase, and how would they be man­aged? Com­munit­ies and Rur­al Devel­op­ment Man­ager advised that there were recog­nised risks around loss of momentum and con­tinu­ity when mov­ing from design to deliv­ery, par­tic­u­larly as the panel’s role fin­ishes; these risks have been iden­ti­fied, and fur­ther detail on mit­ig­a­tion and man­age­ment will be developed and presen­ted at the next Board meet­ing on 26 June 2026.

Form­al Board Paper 8 Annex 1 27 Novem­ber 2026 Page 12 of 24 t) A mem­ber reques­ted that fur­ther inform­a­tion be presen­ted to the Board next week, which included clear and fixed timelines should be estab­lished, includ­ing a defined applic­a­tion win­dow (e.g. four weeks) and a rap­id decision-mak­ing peri­od (e.g. one to two weeks). This would provide applic­ants with timely feed­back and great­er cer­tainty, help­ing them coordin­ate applic­a­tions along­side oth­er fund­ing oppor­tun­it­ies and man­age lar­ger pro­jects effectively

  1. The Audit and Risk Com­mit­tee agreed to the recommendations.
  2. Action Points Arising: i. Detailed guid­ance on eli­gible pro­jects to be provided as part of Board present­a­tion on 26 June 2026 (para 34d). ii. Devel­op and present a detailed mit­ig­a­tion and man­age­ment plan to address risks of loss of momentum and con­tinu­ity dur­ing the trans­ition from design to deliv­ery at the Board meet­ing on 26 June 2026 (para 340). iii. Set fixed applic­a­tion and decision timelines to provide timely feed­back and cer­tainty, to be presen­ted at the next Board meet­ing on 26 June 2026 (para 34p).

Brid­get Trus­sell and Eilidh Todd left the meet­ing at 11.29am.

Draft annu­al pro­cure­ment report (Paper 8)

  1. Mikko Saari, Pro­cure­ment Man­ager presen­ted the paper.
  2. The Audit and Risk Com­mit­tee dis­cussed the report and made the fol­low­ing com­ment: a) A mem­ber asked how year on year stat­ist­ics on loc­al sup­pli­er con­tracts should be inter­preted, giv­en that vari­ations in work could affect num­bers? Pro­cure­ment Man­ager con­firmed that fig­ures could fluc­tu­ate due to many vari­ables (e.g., type of work, reg­u­la­tions), so while increas­ing loc­al sup­pli­er use was desir­able, decreases may also be legit­im­ate; efforts are under­way to optim­ise con­sist­ency through con­sulta­tion with loc­al suppliers.

  3. The Audit and Risk Com­mit­tee noted the report.

  4. Action Point Arising: None.

Form­al Board Paper 8 Annex 1 27 Novem­ber 2026 Page 13 of 24 Mikko Saari left the meet­ing at 11.52am

Draft gov­ernance state­ment (Paper 9)

  1. Louise Allen presen­ted the draft gov­ernance statement.
  2. The Audit and Risk Com­mit­tee dis­cussed the report and agreed they were con­tent with it.
  3. The Audit and Risk Com­mit­tee agreed the draft gov­ernance statement.
  4. Action Points Arising: None.

Inform­a­tion requests and com­plaints update (Paper 10)

  1. Dav­id Camer­on, Deputy CEO and Dir­ect­or of Cor­por­ate Ser­vices presen­ted the paper.
  2. The Audit and Risk Com­mit­tee dis­cussed the report and made the fol­low­ing com­ments and obser­va­tions: a) Com­ment made that there were not too many recur­ring themes which was pos­it­ive. b) The Chair gave thanks to the Inform­a­tion Man­ager for pre­par­ing the report.

  3. The Audit and Risk Com­mit­tee noted the update.

  4. Action Points Arising: None.

AOCB

  1. There were no items of business.
  2. Motion to take the next items in con­fid­en­tial session.

Date of Next Meeting

  1. The date of the next meet­ing is 2 Octo­ber 2026 online.
  2. The pub­lic part of the meet­ing con­cluded at 11.55 am

Form­al Board Paper 8 Annex 1 27 Novem­ber 2026 Page 14 of 24 | Ref | Action Detail | Who | When | Status | | —- | —- | —- | —- | —- | | 13/03/26 | At Para 18i
Refresh­er Audit & Risk Com­mit­tee train­ing to be organ­ised | Dav­id Camer­on | Fol­low­ing dir­ectly elec­ted elec­tions
March 2027 | | | 13/03/26 | At Para 28i)
Fol­low up audit on pro­ject ini­ti­ation to be car­ried out in 2027/2028. | Intern­al aud­it­ors | 2027⁄28 | | | 19/06/2026 | At Para 34d
Detailed guid­ance on eli­gible pro­jects | Com­munit­ies and Rur­al Devel­op­ment Man­ager | Board present­a­tion on
26 June 2026 | | | 19/06/2026 | At Para 34o
Devel­op and present a detailed mit­ig­a­tion and man­age­ment plan to address risks of loss of momentum and con­tinu­ity dur­ing the trans­ition from design to deliv­ery | Com­munit­ies and Rur­al Devel­op­ment Man­ager | Board present­a­tion on
26 June 2026 | | | 19/06/2026 | At Para 34p
Set fixed applic­a­tion and decision timelines to provide timely feed­back and cer­tainty | Com­munit­ies and Rur­al Devel­op­ment Man­ager | Board present­a­tion on
26 June 2026 | |

Form­al Board Paper 8 Annex 1 27 Novem­ber 2026 Page 15 of 24 Minutes of the Resources Com­mit­tee meet­ing Held at Cairngorms Nation­al Park Author­ity office, Grant­own-on-Spey Hybrid 28 August 2026 at 09.00am

Present in per­son Rus­sell Jones (Chair) Sandy Brem­ner Derek Ross Elean­or Mack­in­tosh Jack­ie Brierton

Present online Lauren McCal­lum (Deputy Chair) Han­nah Grist

In attend­ance Grant Moir, Chief Exec­ut­ive Officer Kate Christie Head of Organ­isa­tion­al Devel­op­ment (online) Louise Allen, Head of Fin­ance and Cor­por­ate Oper­a­tions Kath­er­ine August, Fin­an­cial Account­ant Kar­en John­stone, Clerk to the Board

Apo­lo­gies Ian McLar­en Dav­id Camer­on, Deputy CEO and Dir­ect­or of Cor­por­ate Services

Wel­come and introductions

  1. The Chair wel­comed every­one to the meet­ing of the Resources Committee

Form­al Board Paper 8 Annex 1 27 Novem­ber 2026 Page 16 of 24 Approv­al of minutes of pre­vi­ous meetings

  1. The draft minutes from the pre­vi­ous meet­ing on 15 May 2026 were approved with no amendments.

Mat­ters arising not covered elsewhere

  1. There were not mat­ters arising.

Actions from 24 Janu­ary 2025 meet­ing: Inform­a­tion set out in Paper-6-FOISA_Complaints.pdf

Paper 1Policy still under con­sid­er­a­tion, but Staff Bene­fits doc­u­ment has been developed and cir­cu­lated, which already sets out a num­ber of exist­ing benefits
i.Return to com­mit­tee the new policy on staff recog­ni­tion and reward once available.
Paper 5Open
i.Deputy CEO and Dir­ect­or of Cor­por­ate Ser­vices and Jack­ie Brier­ton to Invest­ig­ate the pos­sib­il­ity of Cred­it Uni­ons for staff and park wide.

Action points from 29 August 2025 | At para 15 g | | Closed: — repor­ted verbally in update on staff turnover. | | —- | —- | —- | | i. | Cap­ture if staff are mov­ing on to more seni­or roles out with the Park Author­ity in future reports. | |

Action points from 7 Novem­ber 2025 | At para 12 | | Open, and tabled for June Health and Safety Com­mit­tee meet­ing | | —- | —- | —- | | i. | Dry runs of new pro­ced­ures inten­tion­ally trig­ger­ing health and safety tri­als to be con­sidered by the Health and Safety Committee. | |

Action points from 13 Feb­ru­ary 2026

Form­al Board Paper 8 Annex 1 27 Novem­ber 2026 Page 17 of 24 | Paper 4 — Staff Con­sultat­ive For­um | | Closed — con­firmed on 15 May 2026 that to date there have been no applic­a­tions. | | —- | —- | —- | | At para 18c | | | | i. | Bring back a report on uptake of the new sab­bat­ic­al policy. | |

Action points from 15 May 2026 | Paper 1 — Fin­ance Mon­it­or­ing | | Closed — paper on agenda | | —- | —- | —- | | At para 6a | | | | i. | Fur­ther ana­lys­is of how much expendit­ure on the com­munity wealth fund has been dir­ec­ted to organ­isa­tions, indi­vidu­als, or busi­nesses with­in the Nation­al Park versus out­side the Nation­al Park to be pre­pared and presen­ted to the Committee | |

Declar­a­tions of interest

  1. There were no declar­a­tions of interest.

Fin­ance mon­it­or­ing (Paper 1)

  1. Louise Allen, Head of Fin­ance and Cor­por­ate Oper­a­tions presen­ted the paper which presents a view of the Park Authority’s cur­rent fin­an­cial pos­i­tion. It included an estim­ate of the out­turn pos­i­tion for the fin­an­cial year 2025⁄26, togeth­er with the budget man­age­ment pos­i­tion at the end of July — month four of the 2026⁄27 fin­an­cial year.
  2. The Resources Com­mit­tee dis­cussed the paper and made the fol­low­ing com­ments: a) A Board Mem­ber asked if the extra costs incurred owing to the wild­fires will come from the Park Author­ity budget or if Scot­tish Gov­ern­ment (SG) will sub­sid­ise this. CEO noted that they are hope­ful SG will cov­er some of the costs, how­ever this is cur­rently uncon­firmed. It will be covered through a vari­ety of organ­isa­tions, not solely the Park Authority’s respons­ib­il­ity. b) A ques­tion was raised regard­ing staff over­time dur­ing the wild­fire peri­od and how these costs will be covered. CEO con­firmed that staff will be giv­en half as annu­al leave and half will be paid, as the amount of over-time incurred was too high for staff to take all the time back as flexi and still be able to meet

Form­al Board Paper 8 Annex 1 27 Novem­ber 2026 Page 18 of 24 c) work com­mit­ments / dead­lines. Over­all, the expec­ted addi­tion­al costs are between £20,000 — £30,000. Clar­ity was sought regard­ing insur­ance and if this would cov­er any addi­tion­al staff­ing costs. CEO explained that as the Park Author­ity is a gov­ern­ment body, it falls under the Scot­tish Government’s self-insur­ance arrange­ments; this includes liab­il­ity insur­ance. d) A Board Mem­ber ques­tioned why the Park Author­ity would be pay­ing to repair dam­aged equip­ment due to the fires, sug­gest­ing their own insur­ance would cov­er this. CEO explained that in the first instance the con­tract­ors’ insur­ance would cov­er this, but where there was a refus­al to pay out, the Park Author­ity would poten­tially cov­er this to ensure that volun­teer con­tract­ors are not out of pock­et. e) A ques­tion was raised regard­ing the gap cre­ated from the lack of staff turnover and how will that be filled. Head of Fin­ance and Cor­por­ate Oper­a­tions explained that Heads of Ser­vice are cur­rently engaged in a refore­cast of the budget, and budget will be real­loc­ated where this is neces­sary to meet spend­ing pri­or­it­ies. f) A com­ment was made regard­ing the £6,000 paid to Nethy Bridge com­munity to cov­er costs for the sup­port for volun­teer food divi­sion, not­ing that Scot­tish Fire and Res­cue Ser­vice (SFRS) should cov­er some of these costs. g) Board Con­vener com­men­ted regard­ing the verbal con­firm­a­tion of fund­ing for trans­port pro­jects, thank­ing all staff for their hard work and efforts to get to this stage.

  1. The Resources Com­mit­tee noted the paper agree­ing to the recom­mend­a­tions: a) Note the estim­ated out­turn pos­i­tion for the 2025⁄26 fin­an­cial year. b) Con­sider the budget man­age­ment pos­i­tion for 2026⁄27.

  2. Action Points Arising: None.

Ana­lys­is of fund­ing provided to the com­munity with­in the Nation­al Park (Paper 2)

  1. Louise Allen, Head of Fin­ance and Cor­por­ate Oper­a­tions presen­ted the paper which responds to a request for ana­lys­is of how much expendit­ure has been dir­ec­ted to organ­isa­tions, indi­vidu­als, or busi­nesses with­in the Nation­al Park.

Form­al Board Paper 8 Annex 1 27 Novem­ber 2026 Page 19 of 24

  1. The Resources Com­mit­tee dis­cussed the paper and made the fol­low­ing com­ments: a) Mem­bers thanked Head of Fin­ance and Cor­por­ate Oper­a­tions for the paper not­ing the inform­a­tion was use­ful to high­light oppor­tun­it­ies for fur­ther com­munity wealth-build­ing. b) A Board Mem­ber high­lighted that graphs in the annex should show, in the Nation­al Park, else­where in Scot­land, and UK — oth­er — not only Eng­land. Head of Fin­ance and Cor­por­ate Oper­a­tions agreed to update annex to reflect. c) Con­cern was raised regard­ing the title of the paper, sug­gest­ing that the title indic­ated this was all fund­ing giv­en to com­munit­ies, when in fact there was a lot more, spe­cific­ally in grants. Mem­bers and Head of Fin­ance and Cor­por­ate Oper­a­tions agreed to change the title to the same as the annex (Geo­graph­ic­al dis­tri­bu­tion of grants and con­tracts awar­ded dur­ing the fin­an­cial year 2025⁄26) as it was more appro­pri­ate. d) Dis­cus­sions were had on how often this paper should be brought to Resources Com­mit­tee, six months or annu­ally. It was noted that if the paper was to be presen­ted every six months, there may not be enough inform­a­tion for clear under­stand­ing of the funds alloc­ated and annu­ally may be more bene­fi­cial. CEO to dis­cuss and come back to the next meeting.

  2. The Resources Com­mit­tee noted the paper agree­ing to the recom­mend­a­tions: a) Note the inform­a­tion provided.

  3. Action Points Arising: i. Change title of paper to match Annex 1, Geo­graph­ic­al dis­tri­bu­tion of grants and con­tracts awar­ded dur­ing the fin­an­cial year 2025⁄26, as this reflects the con­tents of the paper bet­ter and re-upload to the web­site. ii. Change the word­ing of the graphs to show in the Nation­al Park, else­where in Scot­land, and UK — oth­er. This should be re-uploaded to the web­site. iii. CEO to dis­cuss if this paper should be brought every six months or annually.

Cairngorms Nation­al Park Author­ity equal pay audit 2025⁄26 (Paper 3)

  1. Kate Christie, Head of Organ­isa­tion­al Devel­op­ment presen­ted the paper which high­lights the Park Authority’s 2025⁄26 gender pay gap, using data as at 31 March 2026. The gender pay gap across the organ­isa­tion as a whole is iden­ti­fied, as well as across dir­ect­or­ates, grades and con­tract type (full time and part time). The

Form­al Board Paper 8 Annex 1 27 Novem­ber 2026 Page 20 of 24 paper also explores recruit­ment data and iden­ti­fies pos­sible reas­ons for the pay gap.

  1. The Resources Com­mit­tee dis­cussed the paper and made the fol­low­ing com­ments: a) Head of Organ­isa­tion­al Devel­op­ment noted that the table at para­graph 21 was incor­rectly col­our-coded, explain­ing this would be updated and reup­loaded to the web­site. b) A Board Mem­ber ques­tioned if there were any oth­er bench­mark stat­ist­ics relat­ing to the mean gender pay gap from oth­er organ­isa­tions. Head of Organ­isa­tion­al Devel­op­ment will request this data from oth­er Non-Depart­ment­al Pub­lic Body’s (NDPB’s) and share with Com­mit­tee mem­bers. c) CEO high­lighted that the heads of ser­vice is now a 50 / 50 mix of males and females which causes an increase in the pay gap as newly appoin­ted staff start at the bot­tom of the band, there­fore this will improve over the com­ing years as staff travel through the band. d) A Board Mem­ber high­lighted the import­ance of insur­ing the right people are in the right pos­i­tions due to their skills and qual­i­fic­a­tions, regard­less of gender. Head of Organ­isa­tion­al Devel­op­ment agreed not­ing there is a robust recruit­ment pro­cess with a sift pan­el of three people along with a selec­tion pan­el com­pris­ing a mix of male and female pan­el­list to ensure no there are no uncon­scious bias. We are con­fid­ent this robust pro­cess ensures that the best per­son is appoin­ted the role regard­less of that person’s demo­graph­ic. e) Dis­cus­sions were had around sup­port net­works and ment­or­ing staff at lower levels. Head of Organ­isa­tion­al Devel­op­ment noted that this is some­thing that is being con­sidered. It was high­lighted that the Women in Lead­er­ship course was for seni­or levels to enhance skills and con­fid­ence to allow staff move into seni­or roles, how­ever some­thing sim­il­ar could be done with bands C and D. f) Dis­cus­sions were had on sup­port for young people and help­ing them devel­op and enter the work force. Head of Organ­isa­tion­al Devel­op­ment explained that the HR team are involved with young people, devel­op­ing trans­fer­able skills and help­ing high school stu­dents with com­plet­ing applic­a­tions and inter­view skills. g) A Board Mem­ber com­men­ted that the new Head of Com­mu­nic­a­tions and Engage­ment pos­i­tion could be used as a good news story, high­light­ing also as a poten­tial good news story that 64% of the work force in the Park Author­ity are female.

Form­al Board Paper 8 Annex 1 27 Novem­ber 2026 Page 21 of 24

  1. The Resources Com­mit­tee noted the paper agree­ing to the recom­mend­a­tions: a) Com­mit­tee are asked to note the gender pay gap.

  2. Action Points Arising: i. Update the col­ours on the table at para­graph 21 re-upload to the web­site. ii. Head of Organ­isa­tion­al Devel­op­ment to reach out to NDPB’s to gath­er stat­ist­ics on mean gender pay gap to allow bench­mark comparisons.

Staff Con­sultat­ive For­um minutes (Paper 4)

  1. Kate Christie, Head of Organ­isa­tion­al Devel­op­ment presen­ted the paper which sets out the minutes from the Staff Con­sultat­ive For­um (SCF) meet­ing held on 08 June 2026.
  2. The Resources Com­mit­tee noted the paper agree­ing to the recom­mend­a­tions: a) Note the minutes of the meeting.

  3. Action Points Arising: None.

Health and Safety Com­mit­tee minutes (Paper 5)

  1. Kate Christie, Head of Organ­isa­tion­al Devel­op­ment presen­ted the paper which sets out the minutes from the Health and Safety Com­mit­tee meet­ing held on 11 June 2026.
  2. The Resources Com­mit­tee dis­cussed the paper and made the fol­low­ing com­ments: a) Dis­cus­sions were had around the inap­pro­pri­ate com­ments and verbal abuse towards Rangers, not­ing that two incid­ents is a small num­ber, how­ever still too many. A Board Mem­ber ques­tioned if there was a com­mon theme amongst the reports. Head of Organ­isa­tion­al Devel­op­ment explained there was no com­mon theme. This is some­thing the Health and Safety Com­mit­tee are mon­it­or­ing. b) Dis­cus­sions were had around the first fines with­in the fire byelaws tak­ing place with Board Mem­bers ques­tion­ing if there will be pub­li­city on this. CEO con­firmed this will be made pub­lic; how­ever, times­cales are still unclear for this process.

Form­al Board Paper 8 Annex 1 27 Novem­ber 2026 Page 22 of 24 c) Dis­cus­sions were had around the tem­por­ary fire byelaw sig­nage with a Board Mem­ber not­ing they find it dif­fi­cult to read and ask­ing what the fixed signs will look like. CEO explained the designs have been made for these as they have to adhere to the road authority’s sig­nage, which will be shared with Com­mit­tee Members.

  1. The Resources Com­mit­tee noted the paper agree­ing to the recom­mend­a­tions: a) Note the minutes of the meeting.

  2. Action Points Arising: iii. CEO to share the fixed fire byelaw road signs.

AOCB

  1. None

Date of Next Meet­ing The date of the next meet­ing is 06 Novem­ber 2026. The meet­ing con­cluded at 9.58am Motion for con­fid­en­tial ses­sion to be set out will be to pro­tect con­fid­en­ti­al­ity of staff.

Actions from 24 Janu­ary 2025 meet­ing: Inform­a­tion set out in Paper-6-FOISA_Complaints.pdf

Paper 1Policy still under con­sid­er­a­tion, but Staff Bene­fits doc­u­ment has been developed and cir­cu­lated, which already sets out a num­ber of exist­ing benefits
i.Return to com­mit­tee the new policy on staff recog­ni­tion and reward once available.
Paper 5Open

Form­al Board Paper 8 Annex 1 27 Novem­ber 2026 Page 23 of 24 | i. | Deputy CEO and Dir­ect­or of Cor­por­ate Ser­vices and Jack­ie Brier­ton to Invest­ig­ate the pos­sib­il­ity of Cred­it Uni­ons for staff and park wide. | |

Action points from 29 August 2025 | At para 15 g | | In hand — will be repor­ted in 2026 Staff Reten­tion paper. | | —- | —- | —- | | i. | Cap­ture if staff are mov­ing on to more seni­or roles out with the Park Author­ity in future reports. | |

Action points from 7 Novem­ber 2025 | At para 12 | | Open, and tabled for June Health and Safety Com­mit­tee meet­ing | | —- | —- | —- | | i. | Dry runs of new pro­ced­ures inten­tion­ally trig­ger­ing health and safety tri­als to be con­sidered by the Health and Safety Committee. | |

Action points from 28 August 2026 | Paper 2 — Ana­lys­is of fund­ing provided to the com­munity with­in the Nation­al Park | | | | —- | —- | —- | | i. | Change title of paper to match Annex 1 as this reflects the con­tents of the paper bet­ter and re-upload to the web­site. | Com­pleted | | ii. | Change the word­ing of the graphs to show: in the Nation­al Park, else­where in Scot­land, and UK — oth­er. This should be re-uploaded to the web­site. | Com­pleted | | iii. | CEO to dis­cuss if this paper should be brought every six months or annually. | |

Paper 3 — Cairngorms Nation­al Park Author­ity Equal Pay audit 2025⁄26
i.Update the col­ours on the table at para­graph 21 re-upload to the website.
ii.Head of Organ­isa­tion­al Devel­op­ment to reach out to NDPB’s to gath­er stat­ist­ics on

Form­al Board Paper 8 Annex 1 27 Novem­ber 2026 Page 24 of 24 | | mean gender pay gap to allow bench­mark com­par­is­ons. | | | —- | —- | —- | | Paper 5 — Health and Safety Com­mit­tee minutes | | | | At para 21 c | | | | i. | CEO to share the fixed fire byelaw road signs. | |