Glenmore Visitor Management Plan
110620
Glenmore Visitor Management Plan Summer 2020
Overview
This Plan is a subset of the overall Cairngorms wide plan for the easing of lockdown. This plan will also tie in with specific plans being put in place by individual landowners. The timescales of these specific plans may differ, depending on the capacity each land manager has available to safely reopen facilities and services.
Timescales (based on SG Guidance) Phase I — 28 May until next review on 18 June
- You will also be permitted to travel short distances for outdoor leisure and exercise but advice to stay within a short distance of your local community and travel by walk, wheel and cycle where possible.
- In this phase we are planning to allow unrestricted outdoors exercise adhering to distancing measures and non-contact outdoor activities in the local area — such as golf, hiking, canoeing, outdoor swimming, angling — consistent with the wider rules and guidance applicable to any activity in this phase.
- In this phase we are planning the gradual opening of drive through food outlets as well as the re-opening of garden centres and plant nurseries with physical distancing. Associated cafes (e.g. in garden centres) should not reopen at this stage except for take away.
Phase 2 — Potentially from 18 June but no decision until review point
- People will be able to drive locally for leisure and exercise purposes.
- Pubs and restaurants can open outdoor spaces with physical distancing and increased hygiene routines
Phase 3 — Timescale Unknown
- In this phase you can drive beyond your local area for leisure and exercise purposes.
- Pubs and restaurants can open indoor spaces with physical distancing and increased hygiene routines.
Key Times for Visitor Management
- Friday — Sun is key visitor times
- School summer holidays from 3 July
On the Ground Staff Resources
Organisation | Numbers | Date Active | Work Underway |
---|---|---|---|
CNPA | 5 seasonal rangers + volunteer rangers in time | End June | Patrol routes being developed |
FLS | Two rangers and one visitor centre assistant based at Glenmore. One beat forester and two craftspeople based at Glenmore. Note that most of these staff | To be confirmed waiting for our Safe Working Protocol to be agreed. | Ongoing planning. Site reopening being discussed and prioritised. |
Rothiemurchus | also have some duties outside of Glenmore. I full time ranger in post | Ongoing | Ongoing planning. |
Cairngorm Mountain RSPB | |||
SNH | |||
Police Scotland | |||
Highland Council |
Key Hotspots
Key Countryside Location | Risk | Manager | Car Park capacities & other info | Toilets & proposed reopening date (where known) |
---|---|---|---|---|
Loch Pitoulish | Pitylouish estate | Limited — issues around camping and fires | Not applicable | |
Loch an Eilien | Rothiemurchus | Parking Spaces 96 plus overflow. | Toilets: Loch an Eilein, Single block with Male I cubicle and urinal Female- 2 cubicles Disabled Access & Nappy changing- I cubicle. | |
Coylumbridge Hotel | Britannia Hotel | 200 | Not applicable | |
Glenmore | FLS | 290 in total Sugar Bowl — 40 Allt Mhor — 33 Hayfield — 50 + 50 in field AlltBhan — 12 Visitor Centre — 28 Beach car park – 92 Lochside — 19 Loch Morlich ‑32 | ||
Glenmore | THC | Roadside car parking, approximately: “ski lane” between village and snow gates 140; reindeer centre 10; Glenmore shop 5. At the Glenmore end of Loch Morlich approx. 10 cars park informally off the road; in addition at very busy times when car parks are full 50+ often park half on the road all along the loch side, | Not applicable | |
Cairngorm Mountain | CMSL | restricting width on the carriageway Car parking capacity in the cas car parks is 600 cars; or 350 cars in the upper car park and max 52 coaches in the lower car park. Car parking capacity in the ciste car parks is 380; and the overspill car park next to the building brings it to around 420 cars | Closed at present and toilet in building unlikely to open. | |
Loch Garten | RSPB Scotand | 55 + 1 coach Garten, 15 at Mallachie & 7 at Garten Wood |
Key Towns
Village | Risk | Manager | Car Park capacities | Toilets & proposed reopening date (where known) |
---|---|---|---|---|
Aviemore | Highland Council |
Key Actions to progress Signage
Action | Owner | Timescale |
---|---|---|
Consistent signage for sites & access to be developed and distributed e.g. car park full. | Adam-Streeter Smith, CNPA | Temporary signs distributed. Contract let for developing suite to be available by end of June. Done for 28⁄0520 |
Use variable message sign at Rothiemurchus (controlled by CMSL) for key visitor information.. | Colin Matthews, CMSL |
Messaging (link to main cairngorms wide comms plan)
Action | Owner | Timescale |
---|---|---|
Consistent messages deployed across partners & CNPA website kept up to date with latest information. Start to add what car parks, toilets etc are open where at the right time. | Francoise Van Burren, CNPA + partners comms | Ongoing. Already done for weekends |
Car park capacity
Action | Owner | Timescale |
---|---|---|
CNPA to talk with FLS about potential works that could be done to help visitor management at Glenmore/Loch Morlich | Pete Crane, CNPA Paul Hibberd, FLS | Ongoing. |
Webcams to be deployed where possible to provide real-time information. Hosted on CNPA website and others. Potential to link to user friendly traffic light system for car parks e.g. red full, green open and available. | Adam Street Smith, CNPA + landowners | By end of June 2020. Technical details being looked at. |
Toilets and Facilities
Action | Owner | Timescale |
---|---|---|
Key public toilets to reopen safely in due course. Key issue and need to get agreed guidance of how to do this safely | Local Authorities & site managers | Ongoing but review position prior to 18 June. |
Information to be made clear where bins are not being picked up. Take your letter home key message | Site managers | Ongoing. Skip now in place at beach car park, Loch Morlich |