Cairngorms 2030 Com­munit­ies Fund Final report August 2026


Wel­come

Between March 2025 and June 2026, the Cairngorms Nation­al Park Author­ity, co-design pan­el mem­bers and Involve col­lab­or­ated to design the new Cairngorms 2030 Com­munit­ies Fund.

This report out­lines the ori­gins of the work and the pro­cess that the col­lab­or­at­ors went through from dis­cov­ery, recruit­ment, co-design and the final fund design.

Who took part in the process

  • 18 mem­bers of the pan­el – people who live in, work in or have a strong con­nec­tion to the Cairngorms Nation­al Park.
  • Col­leagues from across the Cairngorms Nation­al Park Authority.
  • An accom­pa­ny­ing advis­ory group drawn from across the geo­graphy of the Nation­al Park and bey­ond, with a wide range of rel­ev­ant backgrounds.
  • The Involve facil­it­a­tion team.

Con­tents

Exec­ut­ive summary

  1. Intro­duc­tion
  2. Dis­cov­ery and scope of the project
  3. Recruit­ing the co-design panel
  4. The co-design sessions
  5. Co-design tech­niques
  6. The co-design pan­el outputs
  7. Next steps

Exec­ut­ive summary

The Cairngorms 2030 Com­munit­ies Fund is the work of 18 pan­el mem­bers, sup­por­ted by Cairngorms Nation­al Park Author­ity Grants, Engage­ment and Com­mu­nic­a­tions colleagues.

Between March 2025 and June 2026, the par­ti­cip­a­tion char­ity Involve led a series of phases com­pris­ing dis­cov­ery, design, recruit­ment and finally co-design. The out­put of this pro­cess is a £1 mil­lion fund designed by 18 people who who live in, work in or have a strong con­nec­tion to the Cairngorms Nation­al Park.

The co-design included everything from eli­gib­il­ity cri­ter­ia to max­im­um award amounts, how the money would be dis­trib­uted and how suc­cess would be measured.

249 people expressed interest in tak­ing part in the pan­el. The final pan­el was drawn from 17 dif­fer­ent coun­cil areas across the Cairngorms and beyond.

The guid­ing ques­tion for the pro­cess was: How should this fund work, and how do we make sure com­munit­ies are genu­inely in control?

Pan­el mem­bers came togeth­er over nine ses­sions: three full days in per­son in the Cairngorms and six online ses­sions tak­ing place in the even­ings (to fit around pan­el­lists’ work and home commitments).

The pan­el decided that grant fund­ing needed to be sim­pler, more access­ible, trans­par­ent and encour­age more first time grantees.

They first decided that any­thing could be fun­ded as long as it was with­in the four Cairngorms 2030 themes. There would be a min­im­um 10% of the over­all fund pro­jects that pri­or­it­ise Equity Diversity and Inclusion.

Then they decided that there should be three dif­fer­ent grant sizes avail­able: small (£500 – £5,000), medi­um (£5,001 – £50,000) and large (£50,001 – £100,000).

The pan­el designed a dif­fer­ent pro­cess for each grant size. The most simple small grants would have a pre­sump­tion to say yes!’ to all applic­a­tions, provid­ing they meet min­im­um cri­ter­ia. More involved medi­um and large grants would require a recruited decision-mak­ing pan­el, made up of people with a close con­nec­tion to the Cairngorms.

The Park Author­ity would sup­port applic­ants through the pro­cess and ensure fund­ing oppor­tun­it­ies were effect­ively com­mu­nic­ated, includ­ing case stud­ies of suc­cess­ful grantees.

Over the next few years the pro­cess will be tested, eval­u­ated and refined to ensure that it best meets the needs of loc­al com­munit­ies. 4


Intro­duc­tion

5


About Cairngorms 2030

An intro­duc­tion by the Park Authority

Cairngorms 2030 is an ambi­tious pro­gramme that will see the Cairngorms become the UK’s first net zero nation­al park, turn­ing all the talk about tack­ling cli­mate change into pos­it­ive action on the ground.

The Park Authority’s ambi­tion is to focus on the innov­at­ive, col­lab­or­at­ive and trans­form­a­tion­al changes required to tackle the nature and cli­mate crisis.

Cairngorms 2030 is on a lar­ger scale than any­thing pre­vi­ously attemp­ted in the UK, and aims to inspire rur­al and urb­an com­munit­ies through­out Scot­land and beyond.

The programme’s vis­ion is that, by 2030, the Cairngorms Nation­al Park will be an exem­plar of people and nature thriv­ing togeth­er in a rap­idly chan­ging world.

Cairngorms 2030 is sup­por­ted by The Nation­al Lot­tery Her­it­age Fund, with thanks to play­ers of the Nation­al Lottery.

It is one of five pro­jects awar­ded a total of £50 mil­lion as part of the Her­it­age Hori­zons Awards. All five pro­jects share qual­it­ies of huge ambi­tion, sig­ni­fic­ant col­lab­or­a­tion and the pro­spect of life-chan­ging bene­fits for people and places.

More inform­a­tion on the Her­it­age Hori­zon Awards is avail­able on the Her­it­age Fund web­site. 6


The roots of the C2030 Com­munit­ies fund

An intro­duc­tion by the Park Authority

People com­ing togeth­er to make a dif­fer­ence is a famil­i­ar story in the Nation­al Park, wheth­er that is log banks being set up for neigh­bours strug­gling to heat their homes, or com­munity garden pro­jects that cre­ate peace­ful hideouts for people and wild­life alike.

This ini­ti­at­ive aimed to build on that work and take it to a whole new level.

In March 2026, 18 people — selec­ted anonym­ously by inde­pend­ent char­ity Involve to reflect a range of com­munit­ies across the Nation­al Park and bey­ond – came togeth­er for the first time to form a pan­el, work­ing togeth­er to design a new £1 mil­lion Cairngorms 2030 Com­munit­ies Fund from the ground up.

This included everything from eli­gib­il­ity cri­ter­ia to max­im­um award amounts and how the money was distributed.

From the out­set, we were aware that what the pub­lic sec­tor per­ceives as rel­at­ively simple pro­cesses can in prac­tice feel inac­cess­ible, cum­ber­some and lack­ing in rel­ev­ance for the people they are designed to benefit.

Through listen­ing, enga­ging and co-design­ing the grant scheme with people who live in and love the Nation­al Park, we believe a truly innov­at­ive meth­od of grant fund­ing has been realised.

Over the next few years the pro­cess will be tested and refined to ensure that it best meets the needs of loc­al com­munit­ies and the wider aims of Cairngorms 2030, whilst also meet­ing the needs of our fund­ing part­ners The Nation­al Lot­tery Her­it­age Fund. We’re really excited to see the community’s ideas put into action on the ground. 7


Who are Involve?

At Involve we have been run­ning par­ti­cip­at­ory pro­cesses across the UK since 2003, work­ing with gov­ern­ments, par­lia­ments, civil soci­ety, aca­dem­ics and mem­bers of the pub­lic to cre­ate, advoc­ate for and deliv­er new forms of pub­lic par­ti­cip­a­tion that re-vital­ise demo­cracy, improve decision mak­ing and enable people to shape the decisions that affect their lives.

We are real­ist­ic about the chal­lenges faced by demo­cracy, but optim­ist­ic about how to over­come them. We are com­mit­ted to ensur­ing our demo­cra­cies are vibrant and fit for the future by put­ting people at the heart of decision making.

We work across the UK and inter­na­tion­ally, with offices in Bel­fast and Lon­don. Many of our staff work from home across the UK or in a hybrid pat­tern, rather than being based at one of our offices, and we meet up reg­u­larly as a team.

We believe that decision mak­ing across the UK needs to be more:

Open – so that people can under­stand, influ­ence and hold decision makers to account for the actions and inac­tions of their governments;

Par­ti­cip­at­ory – so that people have the free­dom, sup­port and oppor­tun­ity to shape their com­munit­ies and influ­ence the decisions that affect their lives; and,

Delib­er­at­ive – so that people can exchange and acknow­ledge dif­fer­ent per­spect­ives, under­stand con­flict and find com­mon ground, and build a shared vis­ion for society.

There are a huge num­ber of demo­crat­ic innov­a­tions – from cit­izens’ assem­blies to crowd­law, cit­izens’ ini­ti­at­ives to co-pro­duc­tion and co-design – that put people at the heart of decision mak­ing by mod­el­ling these val­ues. 8


The co-design methodology

Involve were com­mis­sioned by the Cairngorms Nation­al Park Author­ity to sup­port devel­op­ing a grant fund using par­ti­cip­at­ory demo­cracy meth­ods. Involve sug­ges­ted a co-design panel.

Co-design allowed for a col­lab­or­at­ive pro­cess between cit­izens from vari­ous back­grounds and lived exper­i­ences, act­ively design­ing the grant fund with the assist­ance of col­leagues from the Park Author­ity, who brought their pro­fes­sion­al exper­i­ence in fund­ing policy and mech­an­ics to the table.

Co-design cre­ated space for the emer­gence of a design that was dir­ec­ted by the mem­bers of the pan­el, with spe­cial­ist advice and enabling bound­ar­ies provided by the Park Author­ity and others.

Co-design min­im­ised the ini­tial bound­ar­ies and pre-defined struc­tures around which decisions need to be made and when. This sup­por­ted mem­bers of the pan­el to take a more act­ive role in decision mak­ing at every step of the pro­cess, from ideation to cre­ation of the final fund struc­ture and governance.

The aim was to cre­ate a grant fund that was more access­ible and bet­ter served the needs of communities.

So what was the co-design panel?

The co-design pan­el was made up of people who who live in, work in or have a strong con­nec­tion to the Cairngorms Nation­al Park.

We spe­cific­ally focused on recruit­ing people who had pre­vi­ously been under-rep­res­en­ted in tra­di­tion­al grant fund­ing processes.

This pan­el worked togeth­er on the design and struc­ture of the grant scheme, the prin­ciples, decision mak­ing and gov­ernance. The pro­cess included learn­ing about cur­rent fund­ing avail­ab­il­ity, so that the pan­el could design some­thing that fit­ted with­in the exist­ing com­plex fund­ing landscape.

The designed fund would be rolled out across the Cairngorms, enabling fund­ing to be dis­trib­uted in a new way that involves even more people in the pro­cess than ever before. 9


Our guid­ing question

When co-design­ing, a guid­ing ques­tion gives the pan­el a shared focus through­out the process.

It helps par­ti­cipants stay ori­ented when dis­cus­sions get complex.

It also provides a touch­stone for check­ing wheth­er the panel’s decisions are address­ing what they were brought togeth­er to do.

The guid­ing ques­tion — draf­ted by the Park Author­ity and Involve at the start of this co-design pro­cess — was:

How should this fund work and how do we make sure com­munit­ies are genu­inely in control? 10


Steps in the process

Phase 1, Dis­cov­ery phase (March – August 2025) This involved fram­ing what the fund is about, the bound­ar­ies that the co-design would work with­in and who needed to make decisions dur­ing each phase of the project.

Pre-engage­ment work and advis­ory group form­a­tion (July — Decem­ber 2025) Pre engage­ment work was car­ried out by the Park Author­ity to test mes­saging about the co-design work and build rela­tion­ships before launch­ing the design process.

An advis­ory group was estab­lished to hold Involve and the Park Author­ity to account on engage­ment and design of the pro­cess. They did not have any role in decision mak­ing itself, but instead acted as a crit­ic­al friend’ to sense check our approach to the sessions.

Recruit­ment of the co-design pan­el (Janu­ary — Feb­ru­ary 2026) The Park Author­ity advert­ised the oppor­tun­ity to be on the codesign pan­el via a multi-chan­nel cam­paign includ­ing social media, in-per­son events and postal drops, col­lect­ing expres­sions of interest via an online form.

Involve then ran a selec­tion pro­cess and onboarded a diverse group of people who live in, work in or have a strong con­nec­tion to the Cairngorms.

Co-design pan­el ses­sions (March – June 2026) From March-June 2026 we ran nine co-design ses­sions where the pan­el learned about fund­ing, dis­cussed meth­od­o­lo­gies and pro­cesses and came to final decisions about how the Com­munit­ies Fund should look.

Dur­ing ses­sion 9 the Park Author­ity presen­ted back their imple­ment­a­tion plans and sense checked them with the pan­el. 11


Who else was involved?

The advis­ory group were drawn from across the geo­graphy of the Nation­al Park and bey­ond, and with a wide range of back­grounds, including:

  • Par­ti­cip­at­ory demo­cracy exper­i­ence, pro­cess integ­rity and a stra­tegic perspective.
  • Loc­al expert­ise includ­ing farm­ing, loc­al busi­ness, com­munity group, equal­it­ies, bar­ri­ers to par­ti­cip­a­tion and youth engagement.

Par­ti­cip­a­tion in the advis­ory group was vol­un­tary and they had no dir­ect deliv­ery respons­ib­il­it­ies. They did not have the abil­ity to over­ride’ the codesign pan­el decisions. Instead they made recom­mend­a­tions on the codesign pro­cess, access­ib­il­ity and demo­crat­ic integrity.

From a gov­ernance per­spect­ive, the Park Author­ity ensured reg­u­lar updates to both their own gov­ern­ing board, as well as the Cairngorms 2030 pro­gramme fun­ders NLHF.

After each phase out­lined above, the pro­pos­als were shared with the Park Author­ity Board, to update the pro­ject risk register and share pro­gress. This was in addi­tion to monthly updates to NLHF12


Dis­cov­ery phase

13


Dis­cov­ery phase — March to August 2025

Between March and August 2025, Involve and the Park Author­ity spoke with people across the Cairngorms from dif­fer­ent audi­ence groups at events and through indi­vidu­al con­ver­sa­tions. This work helped us (Involve and the Park Author­ity) to refine the bound­ar­ies of the fund and under­stand more about four key ele­ments of the fund.

The key ele­ments iden­ti­fied through dis­cov­ery were:

  • Fea­tures of the fund
  • Pur­pose and ambitions
  • Meas­ures of success
  • Poten­tial chal­lenges 14

Fea­tures of the fund

The fund was designed to dis­trib­ute around £1 mil­lion, with a focus on the vis­ion and aims of Cairngorms 2030. It would have mul­tiple mod­els rather than a single struc­ture. There was open­ness to dif­fer­ent options for dif­fer­ent sizes / strands of fund­ing with­in an over­all fund, address­ing the diverse needs across dif­fer­ent geo­graph­ies, com­munit­ies of interest and backgrounds.

The fund needed to be easy for com­munit­ies to apply to, and be run by com­munit­ies rather than agencies.

The fund was co-designed with tar­geted recruit­ment across six key audi­ence areas for Cairngorms 2030 (com­munity groups and res­id­ents, farm­ers and land man­agers, interest groups, loc­al busi­nesses, under-rep­res­en­ted groups and young people). Par­ti­cipants were selec­ted via ran­dom sampling. Mem­bers of the co-design pan­el were paid for their time to reduce bar­ri­ers to involvement.

Pur­pose and ambitions

The fund is a key ele­ment of Cairngorms 2030, designed to empower com­munit­ies by put­ting loc­al people at the heart of decision mak­ing and giv­ing them more say in future fund­ing decisions.

It aims to shift power to com­munit­ies to address cli­mate action across four core themes: empower­ing com­munit­ies, trans­port, land­scapes, health and wellbeing.

This will make cli­mate action tan­gible and loc­ally relevant.

The ambi­tion extends bey­ond 2030 to inform the next Nation­al Park Part­ner­ship Plan, with par­ti­cip­at­ory approaches becom­ing embed­ded in ongo­ing Nation­al Park oper­a­tions rather than remain­ing sep­ar­ate. 15


Meas­ures of success

Suc­cess would be meas­ured against the Cairngorms 2030 vis­ion and should be con­nec­ted to the pro­gramme themes.

The Park Author­ity would pilot new mod­els of par­ti­cip­a­tion and learn what they can do to make cli­mate impacts per­son­al to res­id­ents. There would be an option to cap­ture stor­ies of change’ through­out the pro­cess and not just end-point met­rics. Suc­cess also included cre­at­ing sus­tain­able mod­els of fund­ing that could with­stand peaks and troughs’ and work effect­ively for 10 years into the future.

Chal­lenges

We heard about sev­er­al chal­lenges that could have an impact on par­ti­cip­a­tion work across Cairngorms 2030, includ­ing power imbal­ances and the risk of extract­ive consultation.

There was ten­sion around geo­graph­ic­al bound­ar­ies and form­al part­ner­ship arrange­ments. For the pro­cess, there was con­cern about avoid­ing con­sulta­tion fatigue with people hav­ing to repeat them­selves’ across mul­tiple engage­ment pro­cesses. There was also the chal­lenge of reflect­ing such a large land­mass with diverse com­munit­ies, includ­ing the risk that exist­ing fund­ing might get lost’ against a lar­ger £1 mil­lion pot.

There was also a need to cla­ri­fy what would hap­pen bey­ond the end of the pro­gramme in 203016


At the end of the dis­cov­ery phase, Involve and the Park Author­ity did the following:

  • We agreed a clear fund fram­ing and under­pin­ning nar­rat­ive for the fund, estab­lish­ing bound­ar­ies and the fund’s rela­tion­ship to tack­ling the nature and cli­mate crisis.
  • We rap­idly explored the approach to enga­ging with dif­fer­ent audi­ences and estab­lished the advis­ory group.
  • We examined a range of meth­od­o­lo­gic­al options with the Park Author­ity to bet­ter under­stand interest and feas­ib­il­ity of dif­fer­ent pre-engage­ment models.
  • Involve sup­por­ted the Park Author­ity team to build con­fid­ence and skills to con­tin­ue lead­ing engage­ment with res­id­ents, start­ing with com­munity con­ver­sa­tions about the co-design pro­cess and how to frame it in recruitment.
  • We launched recruit­ment in Janu­ary 2026, with the approach and par­ti­cipant tar­gets final­ised after con­clu­sion of wider com­munity con­ver­sa­tions about fund fram­ing. 17

Recruit­ing the co-design panel

18


Recruit­ment process

The aim was to bring togeth­er a pan­el made up of 18 mem­bers of the pub­lic who reflec­ted a mix­ture of dif­fer­ent exper­i­ences and back­grounds. The task was to bal­ance the need for a breadth of exper­i­ence with the need to have a pan­el size able to build rela­tion­ships, enabling dis­cus­sions with dis­agree­ment and trade off dis­cus­sions on the way to decisions.

Recruit­ment covered the full geo­graphy of the Nation­al Park, as well as people from the six key audi­ences of: com­munity groups and res­id­ents, farm­ers and land man­agers, interest groups, loc­al busi­nesses, under-rep­res­en­ted groups and young people.

The expres­sions of interest process

In order to reach as many people as pos­sible, the Park Author­ity star­ted with the over­all fram­ing of the fund and spoke with people in com­munit­ies to under­stand why would be rel­ev­ant to a loc­al res­id­ent or grantee, and why they would get involved.

The Park Author­ity then took a var­ied approach to rais­ing aware­ness of the oppor­tun­ity to be part of the co-design pan­el. In par­tic­u­lar the Park Authority:

  • Spe­cific­ally tar­geted loc­al media titles
  • Ran a tar­geted digit­al cam­paign, includ­ing hyper-loc­al social media advert­ising in spe­cif­ic locations
  • Asked part­ners to spread the word
  • Sent a post­card to every house­hold in the Nation­al Park plus nearby set­tle­ments such as Aboyne, Alford and Pit­lo­chry (circa 31,000 res­id­ents in total)
  • Did engage­ment through com­munity events etc
  • Sent out remind­er com­mu­nic­a­tions as the applic­a­tion dead­line approached 19

So who applied to be a part of the co-design panel?

We had 249 indi­vidu­al expres­sions of interest from people liv­ing, work­ing in or with a strong con­nec­tion to the Nation­al Park.

120 people had nev­er or almost nev­er’ pre­vi­ously engaged with the Park Authority.

This included 7.5% eth­nic minor­ity applic­ants, 11% LGB­TQ+ and 13.6% dis­abled people. All of these fig­ures are high­er than the equi­val­ent census figures.

Expres­sions of interest came from across the geo­graphy of the Cairngorms, as can be seen in the heat­map on the right.

Every com­munity of the Nation­al Park was rep­res­en­ted, from Blair Atholl to Aviemore and Bal­later. 20


How were people selected?

Involve com­pleted the selec­tion pro­cess through ran­dom, anonymised strat­i­fied sampling. This meant doing a ran­dom selec­tion with­in pre-defined groups. These groups were: audi­ence, age, gender and geo­graph­ic loc­a­tion (via postcode).

Involve first filtered the expres­sions of interest by audi­ence and used a ran­dom num­ber gen­er­at­or to select three people in each audi­ence group.

We then reviewed the selec­ted group based on loc­a­tion, age and gender. Where we needed more bal­ance in any one of these cat­egor­ies, we ran­domly selec­ted from those over-rep­res­en­ted and removed them.

We then ran­domly selec­ted replace­ments from those under-represented.

For example, we con­cluded after ini­tial ran­dom selec­tion that we had over-rep­res­en­ted for people ages 25 – 54 and under rep­res­en­ted for people aged 55+ across the pan­el. We there­fore ran­domly selec­ted from those 25 – 54 and removed some pro­posed pan­el­lists. We then re-selec­ted from those 55+ and from the audi­ence groups that we have removed pan­el mem­bers from.

With recruit­ment pro­cesses that are open routinely for six weeks, there is often some nat­ur­al drop off when people who express interest are no longer able to make all of the dates when they are selec­ted. This res­ults in re-select­ing. This affected few­er than 20% of pan­el­lists dur­ing this pro­cess. 21


Sup­port­ing par­ti­cip­a­tion in the panel

Mak­ing it pos­sible to take part

We organ­ised a mix of online and in-per­son ses­sions so that pan­el­lists weren’t asked to travel long dis­tances across the Nation­al Park more often than neces­sary. Where even­ing online ses­sions did hap­pen, we kept them to a strict 2.5 hours with breaks.

We talked to every pan­el­list before the pro­cess began, so we under­stood what sup­port each per­son needed to take part, rather than assum­ing a single approach would work for every­one. This could mean any­thing from prin­ted mater­i­als to seat­ing arrange­ments – tailored to what each per­son told us needed. Ven­ues for in-per­son ses­sions were chosen for their accessibility.

Redu­cing prac­tic­al and fin­an­cial barriers

Pan­el­lists received a sti­pend of £20.17 per hour for their time and con­tri­bu­tion. Travel to and from ses­sions were reim­bursed, and we arranged lifts where these were needed.

For online ses­sions, we lent laptops to any­one who needed one, and provided tech sup­port throughout.

Pay­ment was also offered to cov­er oth­er needs that came with tak­ing part, includ­ing caring respons­ib­il­it­ies. 22


The final panel

Through the expres­sion of interest pro­cess we col­lec­ted con­tact details and demo­graph­ic data. This data was used for the pur­poses of recruit­ment selec­tion and con­tact­ing mem­bers only.

Pan­el mem­bers are from across the Cairngorms and wider, com­ing from the fol­low­ing com­munity coun­cil areas:

  1. Aviemore and Vicin­ity Com­munity Coun­cil area
  2. Bal­later, Crath­ie and Brae­mar Com­munity Coun­cil area
  3. Blair Atholl and Stru­an Com­munity Coun­cil area
  4. Boat of Garten Com­munity Coun­cil area
  5. Cro­mar Com­munity Coun­cil area
  6. Don­side Com­munity Coun­cil area
  7. Glen­liv­et and Inveravon Com­munity Coun­cil area
  8. Grant­own and Vicin­ity / Dul­nain / Crom­dale and Advie Com­munity Coun­cil areas
  9. Great­er Glasgow
  10. Inverness area
  11. Kil­liecrankie and Fin­castle Com­munity Coun­cil area
  12. Kin­craig / Kin­gussie Com­munity Coun­cil areas
  13. Kirriemuir Land­ward East Com­munity Coun­cil area
  14. Lag­gan / New­ton­more Com­munity Coun­cil areas
  15. Mid Deeside / Tor­phins Com­munity Coun­cil areas
  16. Mid Deeside Com­munity Coun­cil area
  17. Nethy Bridge Com­munity Coun­cil area 23

The final pan­el in charts

Gender of pan­el mem­bers (coded from free text answers)

  • Man: 50.0%
  • Woman: 44.4%
  • Queer / non bin­ary: 5.6%

Ages of pan­el mem­bers (census-based drop down list)

  • 16 – 240
  • 25 – 341
  • 35 – 444
  • 45 – 542
  • 55 – 643
  • 65 – 742
  • 75+: 1

Eth­nic make up of pan­el (census-based drop down list)

  • White Brit­ish: 3
  • White Scot­tish: 9
  • Black Afric­an: 2
  • Mixed or mul­tiple eth­nic groups: 1
  • White Oth­er: 1 24

Pan­el mem­ber pre­vi­ous exper­i­ence with the Park Authority

A key aim for recruit­ment of this co-design pan­el was to reach people who had not pre­vi­ously been involved with the Cairngorms Nation­al Park Authority’s work.

The charts below show the num­bers of pan­el mem­bers that had pre­vi­ously been involved with fund­ing or any oth­er sort of con­tact with the Park Authority.

Have you had any pre­vi­ous con­tact with the Cairngorms Nation­al Park Author­ity? This could include attend­ing events, apply­ing for fund­ing, being con­sul­ted, volun­teer­ing, or work­ing with them in any capacity.

  • No – almost noth­ing or have nev­er had con­tact: 11
  • Yes – lots: 1
  • Yes – some: 5

Have you been involved with com­munity fund­ing before?

  • Yes — in the Nation­al Park: 5.6%
  • Yes — out­side the Nation­al Park: 27.8%
  • No: 66.725

The co-design pan­el sessions

26


Our jour­ney in three phases

Found­a­tions

Ses­sions 1 – 3 Build under­stand­ing, hear from com­munit­ies, agree prin­ciples, decide on fund­ing structure

Design

Ses­sions 4 – 6 Design eli­gib­il­ity, applic­a­tions and the decision-mak­ing process

Final­ise

Ses­sions 7 – 9 Con­firm all decisions, final­ise the fund, pre­pare for launch 27


Our jour­ney: Foundations

1. Online

Ses­sion 1 – Wel­come and intro­duc­tion – Wed­nes­day 25 March 2026, 6 – 8:30pm

Ses­sion 1 was an online wel­come webin­ar that opened the co-design pro­cess for the Cairngorms 2030 Com­munit­ies Fund pan­el. It brought togeth­er the pan­el mem­bers for the first time, along­side the Involve facil­it­a­tion team and the Park Author­ity, to set the tone and agree ways of work­ing together.

The ses­sion intro­duced pan­el mem­bers to their role as co-design­ers, gave an over­view of the fund, and explained what the pro­cess will involve across the fol­low­ing months. Ses­sion 1 was about inform­a­tion and con­nec­tion — giv­ing people the chance to meet one anoth­er and begin to form the work­ing rela­tion­ships that the rest of the pro­cess depended on.

2. In-per­son

Ses­sion 2 – Explor­ing the fund and con­text – Sat­urday 28 March 2026, 9.30am-5pm

Ses­sion 2 brought the full pan­el togeth­er in per­son at Boat of Garten Hall for a full day of explor­a­tion and learn­ing. Par­ti­cipants heard from the Cairngorms Trust on the fund­ing land­scape, received a full account of the fund’s con­straints from the Park Author­ity and NLHF, and listened dir­ectly to voices from people in the com­munit­ies they are design­ing the fund for (all of whom had pre­vi­ously applied for fund­ing, both suc­cess­fully and unsuccessfully).

By the end of the day, the pan­el had a clear­er pic­ture of the land­scape they were work­ing in and a set of prin­ciples to guide their work together.

3. In-per­son

Ses­sion 3 – Defin­ing the fund­ing pots – Wed­nes­day 25 April 2026, 9:30am-5pm

Ses­sion 3 was a key ses­sion of the pro­cess. The pan­el arrived after a month-long gap, re-ori­ented to their Ses­sion 2 work, and then moved through a struc­tured arc from explor­a­tion of fund­ing mod­els to some decisions.

The morn­ing used small group work to exam­ine dif­fer­ent fund­ing struc­tures, their trade-offs and who they include or exclude. The after­noon brought the full group togeth­er to make up to three bind­ing decisions: the num­ber and shape of fund­ing pots, the alloc­a­tion of the £1 mil­lion across those pots and some pri­or­it­ised fund­ing areas with­in this agreed struc­ture. 28


Our jour­ney: Design

4. Online

Ses­sion 4 – Par­ti­cip­at­ory approaches and decision mak­ing – Wed­nes­day 6 May, 6 – 8.30pm

Ses­sion 4 was a know­ledge-build­ing and bridging ses­sion. The pan­el explored the range of par­ti­cip­at­ory decision-mak­ing approaches through case examples and break­out dis­cus­sions, then applied that learn­ing to the Com­munit­ies Fund, ima­gin­ing what pro­cesses could look like for dif­fer­ent pro­cesses of small, medi­um and large grants (which was decided in ses­sion 3). The ses­sion closed by sur­fa­cing the prac­tic­al unknowns’ that Ses­sions 5 to 7 needed to address. At this point, Involve also intro­duced the first fol­low-up sur­vey to cap­ture the panel’s insights and ideas before more detailed design work.

5. Online

Ses­sion 5 – Eli­gib­il­ity and applic­a­tions – Wed­nes­day 13 May 6 – 8.30pm

Ses­sion 5 was a design ses­sion. The pan­el has spent Ses­sions 1 to 4 build­ing con­text, agree­ing prin­ciples, decid­ing the broad fund struc­ture and explor­ing how oth­er par­ti­cip­at­ory funds work. Ses­sion 57 worked on the detailed design.

The ses­sion star­ted with the sur­vey res­ults from ses­sion 4 as the work­ing mater­i­al for the even­ing. The sur­veys, used from ses­sion 4 on, guided the group on areas of emer­ging con­sensus and areas where ques­tions remained. Decisions in this ses­sion about EDI built on the panel’s own lan­guage from pre­vi­ous ses­sions, and the Park Authority’s NLHF applic­a­tion com­mit­ments, to agree a work­ing definition.

Ses­sion 5 also looked at struc­tur­al decisions, look­ing at three spe­cif­ic pro­pos­als from the sur­vey in sequence. The pan­el also dis­cussed the decision-mak­ing approaches that could be used for dif­fer­ent grants, using a short­l­ist­ing meth­od to nar­row options before dis­cus­sion, redu­cing the risk of the group going in circles. The ses­sion did not resolve all decisions and a fol­low-up sur­vey was to con­tin­ue the decisions into ses­sion 6.

6. Online

Ses­sion 6 — Focus on the decision pro­cess — Wed­nes­day 20 May, 6 – 8.30pm

Ses­sion 6 built dir­ectly on the sur­vey res­ults from ses­sion 5. The pan­el worked through four con­nec­ted blocks in a sequence designed so that each one informed the next: grant sizes and win­dows first, then eli­gib­il­ity and EDI to estab­lish who the fund is for and how inclu­sion is built in, then a shared defin­i­tion of com­munity, and finally the decision-mak­ing design itself.

The pan­el worked in break­out groups of six through­out, with shar­ing between groups after each block. The fol­low-up sur­vey for ses­sion 6 helped the pan­el to make decisions that could not be resolved in the room. 29


Our jour­ney: Finalise

7. In-per­son

Ses­sion 7 – Par­ti­cip­at­ory approaches and decision mak­ing – Sat­urday 30 May, 9.30am‑5:30pm

Ses­sion 7 was a full day in per­son, build­ing dir­ectly on the sur­vey res­ults and the out­puts from Ses­sions 5 and 6. The day was struc­tured around the applic­ant jour­ney — who applies, what they apply for, how they apply, how decisions are made and what hap­pens after — with draft mater­i­als from pre­vi­ous ses­sions pinned around the room.

The ses­sion star­ted with a recap of the jour­ney so far and a sum­mary of sur­vey responses, fol­lowed by a brief Park Author­ity update on what has been con­firmed as feas­ible and any pro­posed altern­at­ives to con­sider. The morn­ing was about pro­cess design: three par­al­lel groups worked through pro­cess options A, B and C in rota­tion, build­ing and refin­ing a draft design for each grant size.

After lunch, the pan­el recon­vened to resolve out­stand­ing issues. We had aimed to test the com­plete design against real scen­ari­os and devel­op the early out­lines of how the fund would be com­mu­nic­ated to dif­fer­ent audi­ences; how­ever, we did not have time for this on the day. We sched­uled an addi­tion­al ses­sion (ses­sion 8) and fol­lowed up ses­sion 7 with a sur­vey to col­late insights and inform the final session.

8. Online

Ses­sion 8 — Focus on eli­gib­il­ity and applic­a­tions — Wed­nes­day 17 June, 6 – 8.30pm

Ses­sion 8 focused on a the ques­tions that most need the panel’s input before the fund could be final­ised. The Park Author­ity shared a draft blue­print of the fund in response to all of the work of the pan­el up to that point. The pan­el worked through final decisions about the dif­fer­ent sizes of grants that people could apply for and how com­munit­ies would be involved in decision making.

This ses­sion was an extra ses­sion where feed­back across May showed that there were still some open ques­tions about the fund. Ses­sion 8 was about find­ing a way through these final decisions togeth­er. By the end of the ses­sion, the pan­el cla­ri­fied what the Park Author­ity needed to do to turn the blue­print into an oper­a­tion­al plan. We used a short fol­low-up sur­vey to cap­ture any­thing that needed more time to reflect on.

9. Online

Ses­sion 9 — Focus on the decision pro­cess Wed­nes­day 24 June, 6 – 8.30pm

Ses­sion 9 was the panel’s final ses­sion. The Park Author­ity presen­ted a plan for how they will put the Cairngorms 2030 Com­munit­ies Fund into action, based on all the decisions the pan­el had made over the pre­vi­ous eight sessions.

The pan­el reviewed this plan and gave feed­back on it, and held an ini­tial dis­cus­sion on how to involve mem­bers of the wider pub­lic in decisions about large grants.

A fol­low-up sur­vey then asked pan­el mem­bers for fur­ther views on involving the pub­lic in large grants and on how the fund should be com­mu­nic­ated more widely. 30


Co-design tech­niques

31


Our approach to design and decision-making

We designed this pro­cess to hand decision-mak­ing power to the pan­el and treated it as an emer­gent pro­cess through­out, adapt­ing as we went with flex­ible ses­sion plans.

We cre­ated a decision map to guide us through the decisions that had to be made across the pro­cess. Across nine ses­sions, the pan­el moved from under­stand­ing the fund’s con­text and con­straints, through shap­ing its prin­ciples and struc­ture, to mak­ing bind­ing decisions on how the money was alloc­ated and dis­trib­uted. Park Author­ity staff and out­side con­trib­ut­ors gave con­text, answered ques­tions, and offered feas­ib­il­ity input through­out. 32


Mak­ing power vis­ible: the decision map

This decision map set out, for every stage of the pro­cess, what kind of input the pan­el had and who held the final say. It was shared with the pan­el in Ses­sion 1, so every­one knew from the out­set what to expect.

The over­all pat­tern moved from receiv­ing inform­a­tion and explor­ing ideas early on, through shap­ing pro­pos­als in the middle ses­sions, to mak­ing decisions by Ses­sion 7. The aim was to help the pan­el under­stand what kind of power they held at each point – and to give them a clear basis for hold­ing oth­ers to account for the decisions that weren’t theirs to make.

But this struc­ture wasn’t fixed. With­in that over­all shape, we adap­ted the pro­cess as we went — giv­ing the pan­el as much room as pos­sible to influ­ence how things unfol­ded, while still mak­ing steady pro­gress towards a decision. When the pan­el felt they needed more time to get some­thing right, they chose to add an extra ses­sion rather than being rushed into one. Facil­it­at­ors also adap­ted each session’s design in response to how the pan­el was actu­ally work­ing, not just to the ori­gin­al plan. The decision map gave every­one shared, com­mon ground to work from – it didn’t lock the pro­cess into mov­ing at a fixed pace.

RECEIVEThe pan­el is giv­en inform­a­tion by speak­ers, the Park Author­ity or NLHF. They can ask ques­tions but are not being asked to pro­duce or decide anything.
EXPLOREThe pan­el dis­cusses, ques­tions, and makes sense of inform­a­tion. They are form­ing views and sur­fa­cing con­cerns, but not yet com­mit­ting to positions.
SHAPEThe pan­el drafts, pro­poses or cre­ates some­thing — cri­ter­ia, prin­ciples, pro­cesses. Work­ing drafts sub­ject to later confirmation.
DECIDEThe pan­el makes a bind­ing decision that will be car­ried for­ward into the final fund design. This is where genu­ine decision-mak­ing power sits.
ADVISEThe pan­el provides input or recom­mend­a­tions, but the final decision rests with anoth­er body (Park Author­ity board or staff, NLHF).
33

Gen­er­at­ing and test­ing options

Before any decision was made, the pan­el explored the range of options in front of them. In small groups, they worked through dif­fer­ent options against a set of guid­ing ques­tions — who bene­fits, who might be excluded, and what each option would make pos­sible or harder.

One exer­cise, known as a gal­lery walk, set up examples of real-world case stud­ies around the room like an exhib­i­tion. Small groups moved between them, adding notes dir­ectly onto each dis­play to say what looked worth try­ing and what looked worth avoiding.

The pan­el also tested draft ideas against hypo­thet­ic­al scen­ari­os, walk­ing through inven­ted but real­ist­ic examples to ask simply: where would this pro­cess break down?

Examples of tech­niques we used

Gal­lery walkSmall groups moved between real examples set out like an exhib­i­tion, not­ing what looked worth try­ing and what looked worth avoiding.
Small-group workGroups dis­cussed each option against the same ques­tions: who bene­fits, who might be excluded, what it would make pos­sible or harder.
Scen­ario testingThe Pan­el tested draft ideas against fic­tion­al but real­ist­ic grant cases, ask­ing simply: where would this break down?

Real world examples

Dur­ing the second in-per­son ses­sion, the pan­el heard dir­ectly from people in the Nation­al Park who had applied for fund­ing them­selves – some suc­cess­fully, some not. Con­trib­ut­ors came from farm­ing, com­munity devel­op­ment and loc­al edu­ca­tion pro­jects, and spoke frankly about their own recent exper­i­ence, fol­lowed by a ques­tion-and-answer session.

This gave the pan­el a groun­ded sense of the fund­ing that’s already avail­able, and the real obstacles people can face try­ing to access it. 34


Reach­ing decisions

There wasn’t one fixed meth­od for reach­ing a decision. Dif­fer­ent ses­sions called for dif­fer­ent approaches, and we adap­ted as we went rather than fol­low­ing a single script through­out. Decisions were mostly reached through group dis­cus­sion, with one facil­it­at­or lead­ing and a second writ­ing up the group’s emer­ging view on a flipchart in real time, vis­ible to everyone.

Inter­act­ive tools, such as giv­ing each par­ti­cipant a set of sticky dots to place on the options they favoured, turned abstract trade-offs into some­thing people could phys­ic­ally act on. Where the Pan­el couldn’t reach full agree­ment, a fall­back approach — such as a high major­ity threshold, agreed in advance — meant a decision could still move forward.

Between ses­sions, sur­veys let pan­el mem­bers vote on options, give input on spe­cif­ic ques­tions, and raise any­thing else in an open text box. Both the raw res­ults and a facil­it­at­or sum­mary were shared with the pan­el before the next stage of work.

Examples of tech­niques we used

Whole-group delib­er­a­tion with live cap­tureWhile the group talked, a facil­it­at­or wrote up what was emer­ging on a flipchart every­one could see – so people could check it reflec­ted the dis­cus­sion, or chal­lenge it if not.
Inter­act­ive budget allocationEach par­ti­cipant used sticky dots to mark visu­ally how they’d split the fund­ing across the options on offer.
Con­sensus-first, with agreed fallbackThe pan­el aimed for full agree­ment first. Where that wasn’t pos­sible, a fall­back (an agreed threshold of sup­port) let the decision pro­ceed rather than stall.
35

Delib­er­a­tion and work­ing through difference

Bey­ond indi­vidu­al tech­niques, a few struc­tur­al choices ran through­out. The pan­el held real dif­fer­ences of view, so we built