Skip to content
Please be aware the content below has been generated by an AI model from a source PDF.

Item 5 Appendix 1 Plans 20260135DET CairngormMountain

Cairngorms Nation­al Park Author­ity Ugh­dar­ras Pàirc Nàiseanta a’ Mhon­aidh Ruaidh

Agenda item 5

Appendix 1

2026/0135/DET

Plans

Item 5 Appendix 1 13 Novem­ber 2026 Page 1 of 2

N Do not scale from this draw­ing. SAFETY HEALTH AND ENVIR­ON­MENT­AL INFORM­A­TION IN ADDI­TION TO THE HAZARD/RISKS NOR­MALLY ASSO­CI­ATED WITH THE TYPES OF WORK DETAILED ON THIS DRAW­ING, NOTE THE FOL­LOW­ING RISKS AND INFORM­A­TION. RISKS LIS­TED HERE ARE NOT EXHAUST­IVE. REFER TO DESIGN ASSESS­MENT FORM NO. CONSTRUCTION:

DEMOLI­TION:

FOR INFORM­A­TION RELAT­ING TO USE, CLEAN­ING AND MAIN­TEN­ANCE SEE THE HEALTH AND SAFETY FILE. IT IS ASSUMED THAT ALL WORKS WILL BE CAR­RIED OUT BY A COM­PET­ENT CON­TRACT­OR WORK­ING, WHERE APPRO­PRI­ATE, TO AN APPROVED METH­OD STATE­MENT. Legend: Down­hill Tobog­gan Tobog­gan Bridge Tobog­gan Lift­er Sys­tem Foot­path to be Realigned Pro­posed Foot­path Tobog­gan track cor­ridor 5m either side of track unless noted oth­er­wise ATV Track

Car Park ATV Track R12 Pro­tec­tion Hut 400858-PC-1002 Pro­tec­tion Hut Notes:

  1. All dimen­sions on this draw­ing are in metres unless noted oth­er­wise. Do not scale from this draw­ing, only writ­ten dimen­sions are to be used. All levels and coordin­ates are giv­en to Ord­nance Datum (OS).
  2. This draw­ing is to be read in con­junc­tion with all archi­tec­tur­al and engin­eer­ing draw­ings, details and specifications.
  3. Any dis­crep­an­cies should be repor­ted to the engin­eer imme­di­ately so cla­ri­fic­a­tion can be sought.
  4. The con­tract­or is to keep a record of any vari­ations made on site so that draw­ings can be pre­pared upon com­ple­tion of the works. All vari­ations are to be agreed by the engin­eer and client.
  5. For clar­ity this draw­ing should only be prin­ted and read in colour.

Tobog­gan stor­age tun­nel Tick­et shed/​Entry plat­form. Exit plat­form and tunnel

1:1000 20m 40m 60m 80m 100m 400858-PC-1001

9m Foot­path to be moved 6m uphill and fenced Bridge 2 14m 14m 400858-PC-1004

Ski Tow Uphill trans­port Foot­path to be more realigned and fenced Bridge 1 17m 12m 12m Site Bound­ary (16518.067m², 1.65 Ha) 400858-PC-1003 R10 R10 ATV Track

Rev E D C B A Date 26.3.26 25.326 20.326 17.326 13.3.26 Descrip­tion Bound­ary updated Bound­ary and ATV track updated Added ATV Track, adjus­ted bound­ary and area UPDATE TO BOUND­ARY Update to site bound­ary and top shed Drwn. AH GS GS GS GS Chkd. Appd.

Cli­ent: FAIRHURST Bar­ony House Fair­ness Busi­ness Park INVERNESS IV2 7PA Tel: 01463 724 544 Cairngorm Mountain

Pro­ject Title: Cairngorm Toboggan

Draw­ing Title: Pro­posed Site Plan

Scale at A1: 1:1000 Drawn: LB Date: 03/02/2026 Draw­ing No.: 400858-PC-1000 Status: Plan­ning Checked: AH Date: 04/02/2026

Approved: DE Date: 04/02/2026 D