Item 5 Appendix1c Plans SlugainBurnRestoration 20260160DET
Cairngorms National Park Authority Ughdarras Pàirc Nàiseanta a’ Mhonaidh Ruaidh
Item 5 Appendix 1c 09 October 2026 Page 1 of 7
Agenda item 5
Appendix 1c
2026/0160/DET
Plans
Page 2
GENERAL NOTES
- ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
- ALL COORDINATES ARE IN METRES RELATIVE TO ORDNANCE SURVEY NATIONAL GRID.
- ALL DIMENSIONS MUST BE CHECKED/VERIFIED ON SITE.
- ANY DISCREPANCIES NOTED ON SITE ARE TO BE REPORTED TO THE SUPERVISOR IMMEDIATELY.
- THE ELECTRONIC VERSION OF THIS DRAWING IS NOT TO BE USED FOR SETTING OUT.
- THE LOCATIONS OF ANY KNOWN SERVICES SHOWN ON DRAWINGS ARE APPROXIMATE AND FOR GUIDANCE ONLY.
- SERVICES INFORMATION HAS BEEN BEEN PROVIDED BY THE CLIENT, DATED 23/04/2025.
DRAWING NOTES
- DRAWING TO BE READ IN CONJUNCTION WITH:
- PQZ-JBA-00 – 00-DR-C-001-Site_Location_Plan
- PQZ-JBA-00 – 00-DR-C-002-Site-Clearance
- PQZ-JBA-00 – 00-DR-C-003-General_Arrangement_1_of_2
- PQZ-JBA-00 – 00-DR-C-004-General_Arrangement_2_of_2
- PQZ-JBA-00 – 00-DR-C-005-Channel_Long_Section_1_of_2
- PQZ-JBA-00 – 00-DR-C-006-Channel_Long_Section_2_of_2
- PQZ-JBA-00 – 00-DR-C-007-Bridge_Long_Section
- PQZ-JBA-00 – 00-DR-C-008-Channel-Cross_Sections
- PQZ-JBA-00 – 00-DR-C-009-Bridge_Cross_Sections
- PQZ-JBA-00 – 00-DR-C-010-Standard-Details
- PQZ-JBA-00 – 00-DR-C-011-Step-Pool-Details
- PQZ-JBA-00 – 00-DR-C-012-Non-Technical_Overview_Plan
- PQZ-JBA-00 – 00-DR-S-013-Structural_General_Arrangement
- PQZ-JBA-00 – 00-DR-S-014-Sections_1_of_2
- PQZ-JBA-00 – 00-DR-S-015-Sections_2_of_2
LEGEND
- DIVERTED BT- UNDERGROUND
- FIN DRAIN
- 1.1m HIGH POST & WIRE FENCE
- IN SITU REINFORCED CONCRETE
- DUCT ACCESS CHAMBER
- PRECAST CONCRETE
Construction Notes
- DOWNSTREAM CHANNEL FEATURING STEP POOL MORPHOLOGY SEE DRAWING PQZ-JBA-00 – 00-DR-C-003
- CAST IN SITU BASE SLAB TO BE DESIGNED BY CONTRACTOR
- CAST IN SITU WING WALL TO BE DESIGNED BY CONTRACTOR
- NEW HIGHWAY EMBANKMENT TO ENABLE ROAD REALIGNMENT. SEE DRAWING PQZ-JBA-00 – 00-DR-C-007
- FIN DRAIN AS PER DRAWING PQZ-JBA-00 – 00-DR-S-015 TO HAVE REMOVABLE CAP ON UPSTREAM AND TO DISCHARGE AT DOWNSTREAM END OF WING WALL
- 3.3m WIDE CARRIAGEWAY CONSTRUCTION. SEE DETAIL 1 ON DRAWING PQZ-JBA-00 – 00-DR-C-010
- CAST IN SITU WING WALL TO BE DESIGNED BY CONTRACTOR
- GALVANISED N1/W2 STEEL PARAPET 1m HIGH WITH STAINLESS STEEL BOLT AND BASE PLATE FIXING DESIGNED BY CONTRACTOR.
- PRECAST HEADWALL TO BE DESIGNED BY CONTRACTOR
- 3No 5800mm WIDE x 1500mm LONG x 2750mm HIGH PRECAST CULVERT UNITS
- DUCT ACCESS CHAMBER — DESIGNED BY OTHERS
- SAFETY BARRIER CONNECTED TO SUITABLE CONNECTOR AT END TO BE DESIGNED BY CONTRACTOR.
- DIVERTED BT UNDERGROUND. REFER TO CIVIL DRAWING PQZ-JBA-00 – 00-DR-C-003
- ROAD HATCHING REMOVED IN CULVERT AREA FOR CLARITY
- CULVERT TO CULVERT JOINT.
- SAFETY BARRIER CONNECTED TO SUITABLE CONNECTOR AT END TO BE DESIGNED BY CONTRACTOR.
- CAST IN SITU CONCRETE JOINT. REFER TO PQZ-JBA-00 – 00-DR-S-015
- GALVANISED N1/W2 STEEL PARAPET 1m HIGH WITH STAINLESS STEEL BOLT AND BASE PLATE FIXING DESIGNED BY CONTRACTOR
- PRECAST HEADWALL TO BE DESIGNED BY CONTRACTOR
- CAST IN SITU WING WALL TO BE DESIGNED BY CONTRACTOR
- CAST IN SITU WING WALL TO BE DESIGNED BY CONTRACTOR
- BASE SLAB TO BE DESIGNED BY CONTRACTOR
- UPSTREAM CHANNEL FEATURING STEP POOL MORPHOLOGY SEE DRAWING PQZ-JBA-00 – 00-DR-C-003
SCALE 1:50 (m)
Document Control
| Rev. | Description | Date | Author | Designer | Checker | Approver |
|---|---|---|---|---|---|---|
| P02 | FOR REVIEW AND COMMENT | 31/03/26 | AJ | MA | SF | ST |
| P01 | FOR REVIEW AND COMMENT | 06/03/26 | MA | SF | ST |
JBA Consulting
Unit 2.1, Quantum Court, Research Avenue South, Heriot Watt Research Park, Riccarton, EDINBURGH EH14 4AP T: +44 (0)131 319 2940 E: info@jbaconsulting.com www.jbaconsulting.com Twitter @JBAConsulting
Project Title: SLUGAIN BURN RESTORATION Drawing Title: STRUCTURAL GENERAL ARRAGEMENT SCALE: 1:50
This map is reproduced from Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of His Majesty’s Stationary Office Crown copyright 2025. Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. Licence No. 100024198.
The Highland Council Cairngorms National Park Comhairle na Gàidhealtachd Pàirc Nàiseanta a’ Mhonaidh Ruaidh
Parent Model: PQZ-JBA-XX-XX-M3-S-0001-Design Security Classification: FOR PLANNING Author: A. Jaraba Designer: M. Awais Anjum Checker: S. Farrar Approver: S. Thomson Suitability: SHARED FOR REVIEW AND COMMENT Status: S3 Revision: P02 Information Container: PQZ-JBA-00 – 00-DR-S-013-Structural_General_Arrangement A1 Sheet Size
Page 3
GENERAL NOTES
- ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
- ALL COORDINATES ARE IN METRES RELATIVE TO ORDNANCE SURVEY NATIONAL GRID.
- ALL DIMENSIONS MUST BE CHECKED/VERIFIED ON SITE.
- ANY DISCREPANCIES NOTED ON SITE ARE TO BE REPORTED TO THE SUPERVISOR IMMEDIATELY.
- THE ELECTRONIC VERSION OF THIS DRAWING IS NOT TO BE USED FOR SETTING OUT.
- THE LOCATIONS OF ANY KNOWN SERVICES SHOWN ON DRAWINGS ARE APPROXIMATE AND FOR GUIDANCE ONLY.
- SERVICES INFORMATION HAS BEEN PROVIDED BY THE CLIENT, DATED 23/04/2025.
DRAWING NOTES
- DRAWING TO BE READ IN CONJUNCTION WITH:
- PQZ-JBA-00 – 00-DR-C-001-Site_Location_Plan
- PQZ-JBA-00 – 00-DR-C-002-Site-Clearance
- PQZ-JBA-00 – 00-DR-C-003-General_Arrangement_1_of_2
- PQZ-JBA-00 – 00-DR-C-004-General Arrangement 2 of 2
- PQZ-JBA-00 – 00-DR-C-005-Channel_Long_Section_1_of_2
- PQZ-JBA-00 – 00-DR-C-006-Channel_Long_Section_2_of_2
- PQZ-JBA-00 – 00-DR-C-007-Bridge_Long_Section
- PQZ-JBA-00 – 00-DR-C-008-Channel-Cross_Sections
- PQZ-JBA-00 – 00-DR-C-009-Bridge_Cross_Sections
- PQZ-JBA-00 – 00-DR-C-010-Standard-Details
- PQZ-JBA-00 – 00-DR-C-011-Step-Pool-Details
- PQZ-JBA-00 – 00-DR-C-012-Non-Technical_Overview_Plan
- PQZ-JBA-00 – 00-DR-S-013-Structural_General_Arrangement
- PQZ-JBA-00 – 00-DR-S-014-Sections_1_of_2
- PQZ-JBA-00 – 00-DR-S-015-Sections_2_of_2
LEGEND
- EXISTING GROUND
- PROPOSED GROUND
- BRIDGE DECK WATERPROOFING
- IN SITU REINFORCED CONCRETE
- PRECAST CONCRETE
- CLASS 1X RIVER GRAVELS
- UPPER SUBSTRATE
- LOWER SUBSTRATE
- CLASS 6N BACKFILL COMPACTED
Section 1 (SCALE 1:50)
- PRECAST PARAPET ON TOP OF CULVERT UNIT.
- CAST IN SITU WING WALL TO BE DESIGNED BY CONTRACTOR
- GALVANISED N1/W2 STEEL PARAPET 1m HIGH WITH STAINLESS STEEL BOLT AND BASE PLATE FIXING DESIGNED BY CONTRACTOR.
- 315.225
- 0.4m THICK CLASS 1X RIVER GRAVELS
- 0.25 TO 0.5m THICK COHESIVE LOWER SUBSTRATE SEE APPENDIX 6⁄70
- 650
- 3600
- 3300
- 315.150
- REFER TO DETAIL 1 ON CIVIL DRAWING PQZ-JBA-00 – 00-DR-C-5000 FOR ROAD CONSTRUCTION DETAIL
- PRECAST HEADWALL ON TOP OF CULVERT UNIT
- 313.200 EXPECTED 1 IN 200-YEAR FLOOD LEVEL
- 312.079 APPROX. Q95 WATER LEVEL
- PRECAST CULVERT UNITS TO BE DESIGNED BY CONTRACTOR
- 75mm THICK BLINDING UNDER CULVERT UNITS
Section 2 (SCALE 1:50)
- 5500
- 1300
- 3600
- 3300
- 7000
- 1300
- 315.225
- 315.150
- SHEAR KEY
- CAST IN SITU BASE SLAB
- 50mm THICK BLINDING UNDER BASE SLAB AND SHEAR KEY
- 4208
- DIVERTED BT CABLE TO BE ENCLOSED IN THE DUCT.
- TOP OF SLAB TO BE WATERPROOFED WITH BBA SPRAY APPLIED SYSTEM
- 313.200 EXPECTED 1 IN 200-YEAR FLOOD LEVEL
- CAST IN SITU WING WALL TO BE DESIGNED BY CONTRACTOR
- 312.079 APPROX. Q95 WATER LEVEL
- RIVER CHANNEL MAKE UP OMMITED FOR CLARITY
SCALE 1:50 (m)
Document Control
| Rev. | Description | Date | Author | Designer | Checker | Approver |
|---|