Item 6 Appendix 1b Plans 20250300DET Hydro Electric Scheme Blairgowrie
Cairngorms National Park Authority Ughdarras Pàirc Nàiseanta a’ Mhonaidh Ruaidh
Item 6 Appendix 1b 24 April 2026 Page 1 of 6
Agenda item 6
Appendix 1b
2025/0300/DET
Plans
NOTES:
Key:
- Ownership Boundary
- Development Boundary
- Development Boundary with no works proposed
- Existing Track
Ownership Boundary is outwith the area of the drawing
Development Area
- Intake 1 — 7m x 5m = 35m²
- Intake 2 — 7m x 3m = 21m²
- Penstock — 782m x 1m = 782m²
- Turbine House — 6m x 6m = 36m²
- Transfer Pipe — 170m x 1m = 170m²
- Outfall — 16m x 1m = 16m²
- Cable Run — 565m x 0.3m = 169.5m²
- Laydown Area — 20m x 10m = 200m²
Total Working Area = 1429.5m²
Total Development Boundary Area (including area with no works) = 83,375m²
This document is confidential and for the sole use of the intended recipient. Any unauthorised use of this document is strictly prohibited.
| Rev. | Drawn | Checked | Description | Date |
|---|---|---|---|---|
| 03 | LS | LS | Updated drawing format to display single red line boundary | 06/11/25 |
| 02 | KM | LS | Updated to show location for the detailed site plans and updated turbine house area | 17/10/25 |
Project Proterra Energy Ltd
283 — Dalmunzie Estate
Drawing Description Development Boundary Plan
Drawn (init./date): KM 10/10/2025 Checked (init./date): LS 15/10/2025 Scale & sheet size: 1:5000 @A3 Dimensions: m
Drawing No.: 283 – 06-DWG03-REV03
NOTES:
This document is confidential and for the sole use of the intended recipient. Any unauthorised use of this document is strictly prohibited.
| Rev. | Drawn | Checked | Description | Date |
|---|---|---|---|---|
Project Proterra Energy Ltd
283 — Dalmunzie Estate
Drawing Description Turbine House Elevations
Drawn (init./date): KM 29/09/2025 Checked (init./date): LS 15/10/2025 Scale & sheet size: 1:40 @ A3 Dimensions: m
Drawing No.: 283 – 06-DWG09-REV01
NOTES:
Plan and Eleveation of the proposed abstraction on the Allt Coire a’ Ghearraig (NO 08580 70406).
Single wall concrete weir fitted with a stainless steel abstraction box fitted on the downstream face. Stainless steel Coanda screen fitted to the abstraction box.
HOF Plate
Stainless steel HOF plate with 60° angle and 131mm head to allow for Q90 = 5 l/s to pass before abstraction begins.
Screen Approach Weir
1200mm Width, 100mm Head, Cd=1. Weir passes Q=65l/s
Q_design = 35 l/s
Overflow Weir:
Broad Crested Weir 2.0m x 0.25m Cd = 1.7 Weir passes Q=425 l/s
Q_0.1 = 375 l/s (Q0.1 of the Allt Coire a’ Ghearraig) + 18 l/s (Max abstraction of Intake 2) = 393 l/s
Total Flow accommodated by the intake:
- HOF + Intake Weir + Overflow Weir
- = 5+65+425
- = 495 l/s
This document is confidential and for the sole use of the intended recipient. Any unauthorised use of this document is strictly prohibited.
| Rev. | Drawn | Checked | Description | Date |
|---|---|---|---|---|
Project Proterra Energy Ltd
283 — Dalmunzie Estate
Drawing Description Intake 1 Plan — Allt Coire a’ Ghearraig
Drawn (init./date): KM 17/09/2025 Checked (init./date): LS 15/10/2025 Scale & sheet size: 1:20 @ A3 Dimensions: mm
Drawing No.: 283 – 06-DWG11-REV01
NOTES:
Proposed abstraction on an unnamed tributary of the Allt Coire a’ Ghearraig (NO 08668 70268)
Interlocking timber sleepers construction
Apertures cut out for HOF orifice plate and transfer pipe.
HOF Plate
Stainless steel plate with 65mm Ø orifice. 65mm Ø orifice, 125mm head (centre of orifice to bottom of transfer pipe), Cd=0.6 Q=3.118 l/s Q>Q_90 = 3 l/s
Transfer Pipe
Material: 225mm Ø Twinwall Pipe Length: 175m Orifice plate fitted to the upstream end. 125mm Ø Orifice, 300mm Head, Cd=0.6 Q=17.86 l/s
Max Abstraction = 1.3 x Q30 = 1.3 x 14 = 18.2 l/s Q<1.3 x Q30
Overflow Weir:
Broad Crested Weir 1.0m x 0.20m Q=152 l/s
Total Flow accommodated by the intake:
- = HOF + Transfer Pipe + Overflow Weir
- = 3+18+152
- = 173 l/s
This document is confidential and for the sole use of the intended recipient. Any unauthorised use of this document is strictly prohibited.
| Rev. | Drawn | Checked | Description | Date |
|---|---|---|---|---|
| 02 | KM | LS | Updated to show elevation orientation | 17/10/25 |
Project Proterra Energy Ltd
283 — Dalmunzie Estate
Drawing Description Intake 2 Unnamed Burn
Drawn (init./date): KM 15/10/2025 Checked (init./date): LS 15/10/2025 Scale & sheet size: 1:20 @ A3 Dimensions: mm
Drawing No.: 283 – 06-DWG04-REV02
NOTES:
- Ground Level
- Penstock Pipe
This document is confidential and for the sole use of the intended recipient. Any unauthorised use of this document is strictly prohibited.
| Rev. | Drawn | Checked | Description | Date |
|---|---|---|---|---|
| 02 | KM | LS | Updated to show annotation of the scale within the inserts | 17/10/25 |
Project Proterra Energy Ltd
283 — Dalmunzie Estate
Drawing Description Penstock Section
Drawn (init./date): KM 13/10/2025 Checked (init./date): LS 15/10/2025 Scale & sheet size: See insert Dimensions: mm
Drawing No.: 283 – 06-DWG12-REV01