Item 8 Appendix 1b 12 June 2026 Page 1 of 3

2026/0060/DET

Plans


Typ­ic­al Trail Con­struc­tion Detail

  • Cross fall adjus­ted to suit flow for riders and ensure path sur­face drains
  • Path edges sta­bil­ised using stripped turf reclaimed from path tray
  • Suit­able form­a­tion (or lar­ger graded base aggregate)
  • 150mm Min­im­um depth com­pacted sub-base mater­i­al with high dust content
  • FALL
  • Turf lined top side ditch where neces­sary, this will run to twin wall pipe which will pass under the trail form­a­tion to allow sur­face water to drain away on the down­hill side.
  • Exist­ing ground level

Typ­ic­al Berm’ Trail Con­struc­tion Detail

  • 150mm Min­im­um depth com­pacted sub-base mater­i­al with high dust content
  • Cross fall adjus­ted to suit flow for riders and ensure path sur­face drains
  • FALL
  • Path edges sta­bil­ised using stripped turf reclaimed from path tray — max 45 degree batter
  • Exist­ing ground level
  • Turf lined top side ditch where neces­sary this will run to twin wall pipe which will pass under the trail form­a­tion to allow sur­face water to drain away on the down­hill side.
  • Suit­able form­a­tion (or lar­ger graded base aggregate)

Floated Trail Con­struc­tion Detail

  • Cross fall adjus­ted to suit flow for riders and ensure path sur­face drains
  • Trail edges sta­bil­ised using spot bor­row turfs from adja­cent ground
  • Geo­tex­tile Geogrid
  • FALL
  • 300mm Min­im­um depth com­pacted sub-base mater­i­al with lar­ger aggreg­ate at the base and cap­ping lay­er of dust
  • Exist­ing turf to be left in situ with geotextile/​geogrid placed on top
  • Geogrid (ter­ram or sim.)

Rock Fea­ture Con­struc­tion Detail

  • Path edges sta­bil­ised using stripped reclaimed from path tray
  • Quarry Dust (or suit­able as dug mater­i­al) com­pacted between rocks
  • Min­im­um 30% of stone mass below fin­ished ground level
  • Exist­ing ground level
  • Suit­able form­a­tion (or lar­ger graded base aggregate)
  • Land­scaped back­slope max 45deg bat­ter. Re-covered with loc­ally won organ­ic material

Piste Trail Con­struc­tion Detail

  • Base form­a­tion from suit­able as dug mater­i­al or lar­ger graded aggregate
  • Out­fall adjus­ted to suit flow for riders and ensure path sur­face drains
  • FALL
  • 150mm Min­im­um depth com­pacted sub-base mater­i­al with high dust content
  • Ditch back filled with stone
  • Exist­ing slope
  • Land­scaped back­slope max 45deg bat­ter. Re-covered with loc­ally won organ­ic material

Bench Cut Trail Con­struc­tion Detail

  • Base form­a­tion from suit­able as dug mater­i­al or lar­ger graded aggregate
  • Out­fall adjus­ted to suit flow for riders and ensure path sur­face drains
  • Exist­ing sideslope ground level
  • FALL
  • 150mm Min­im­um depth com­pacted sub-base mater­i­al with high dust content

PRO­POSED PLAN SHOW­ING SAFE CROSS­ING FOR CYC­LISTS, SCALE 1:500

  • NEW BAR­RI­ER FENCE WITH CLOSED GATE FOR VEHICLE ACCESS
  • GATE TO BE SET BACK MIN 6m FROM CARRIAGEWAY
  • RED DOT­TED LINES INDIC­ATE CYC­LISTS ROUTE
  • CYC­LISTS DIS­MOUNTSIGNAGE
  • LINE OF VIS­IB­IL­ITY = 120 m
  • FENCE WITH GATE
  • LEVEL GROUND AREA TO ENABLE CYC­LISTS TO DISMOUNT
  • USERS TO BE DIR­EC­TED ALONG PATH
  • EXIST­ING PATH TO BE UPGRADED WITH WHIN TYPE SURFACE
  • EXIST­ING CAR PARK
  • WHIN PATH TO BE SET BACK 1m MIN FROM ROAD
  • MIN­IM­UM VIS­IB­IL­ITY OF CAR­RIAGE­WAY TO BE 120m IN BOTH DIR­EC­TIONS AT THIS POINT
  • EXIST­ING CARRIAGEWAY
  • LINE OF VIS­IB­IL­ITY = 120 m

Pro­ject: THE LECHT 2090 STRATH­DON ABER­DEEN­SHIRE AB36 8YP Pro­ject no: B26/0502 – 01 Drawn: B.OHANLON Checked: Date: 25326 Scale: 1:500@A1 Draw­ing no: 005A