Item10Appendix1CumulativeWindFarms
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Agenda Item 10 10/03/2022
AGENDA ITEM 10
APPENDIX I
OURACK WIND FARM
CUMULATIVE WIND FARMS WITHIN 45KM
Appendix I — applicant’s figure, Cumulative Wind Farms within 45km
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Agenda Item 9 10/03/2023
Proposed turbine locations
Landscape and Visual Study Area
Local authority boundaries
Lines indicating the distance from the proposed turbines
Cairngorms National Park
Existing / Under Construction Wind Farms E01) Berry Burn E16) Farr E02) Paul’s Hill E17) Midtown of Glass E03) Hill of Glaschyle E18) Edintore E04) Cluny Farm E19) Clashindarroch E05) Rothes II E20) Followsters Farm E06) Rothes I E21) Cairnborrow E07) Kellas E22) Kildrummy E08) Bognie Farm E23) Bailiesward Farm E09) Hunthill E24) Garralhill Farm E10) Tom nan Clach E25) Cullisse E11) Moy E26) Upper Wheedlemont Farm E12) Dorenell E27) Balmanoon Farm E13) Ardoch Farm E28) Dunmaglass E14) Hill of Towie E15) Glen Kyllachy
Consented Wind Farms C01) Berry Burn C06) Meikleton Extension of Ardonald C02) Paul’s Hill II C07) Drodland C03) Cairn Duhie C08) Aberarder C04) Meikle Hill C09) Aultmore C05) Hill of Towie II
Application Wind Farms A01) Clash Gour A04) Rothes III A02) Cairn Duhie A05) Garbet Variation A03) Lethen A06) Clashindarroch II
Topography 1,309m AOD and above
0m AOD
OURACK WIND FARM — EIA REPORT Cumulative Wind Farms within 45km