CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Agenda Item 10 10/03/2022
AGENDA ITEM 10
APPENDIX 4
OURACK WIND FARM
CASTLE GRANT WESTERN BYPASS ROUTE
Appendix 4 — Castle Grant, Western Bypass Route
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Agenda Item 9 10/03/2023
NOTES
- DO NOT SCALE FROM THIS DRAWING MANUALLY OR ELECTRONICALLY.
- THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT PROJECT INFORMATION. ALLDATUM LEVELS AND DIMENSIONS ARE IN METRES UNLESS OTHERWISE STATED CONTAINS AERIAL MAP DATA 2021 MICROSOFT CORPORATION 2021 MAXAR CNES (2021) DISTRIBUTION NA BUSDS ACCURACY OF MAP NOT GUARANTEED DUE TO REPRODUCTION METHODS.
- STOPPING SIGHT DISTANCES FOR VISIBILITY SPLAYS BASED ON INFORMATION IN DESIGN MANUAL FOR ROADS AND BRIDGES, CD123 AND CD 109
- SURVEY SHOWN IS TOPOGRAPHICAL, SUPPLIED BY RJ MCLEOD, RECEIVED 13/10/2021.
IMPORTANT HEALTH, SAFETY & ENVIRONMENTAL INFORMATION
IN ADDITION TO THE HAZARDS AND RISKS NORMALLY ASSOCIATED WITH THE TYPE OF WORK DETAILED ON THIS DRAWING, PLEASE NOTE THE FOLLOWING ADDITIONAL RISKS TO HEALTH AND SAFETY:
PROPOSED SECTION THROUGH DAVA WAY 1:1000
NOTE EXISTING GROUND LEVELS AFTER CHAINAGE 200 IS BASED UPON INTERPOLATED GROUND LEVELS.
SCALE 1:1000
Sweco
RJ McLEOD
VATTENFALL
OURACK WIND FARM
CASTLE GRANT BRIDGE WESTERN BYPASS OPTION B
PRELIMINARY SO SKETCH CK A1 CK AS SHOWN 65201087 BR MT 0 65201087 – 100-1023-SK09
CHAINAGE EXISTING LEVELS PROPOSED LEVELS LEVEL DIFFERENCE
HORIZONTAL GEOMETRY
VERTICAL GEOMETRY
0.000 THE INTO THE ASOG PUBLIC HIGHWAY.
0.017 0.549%
PLACE DELIVERY VEHICLE NOTES
- BLADE DELIVERY VEHICLE SHOWN HAS BEEN SUPPLIED BY RJMCLEOD, DRAWING SSR SG170115 Template 04112019010007, RECEIVED 21/06/2021
- THE ACCURACY OF THE DELIVERY VEHICLE ARRANGEMENT AND STEERING CAPABILITIES TO BE CONFIRMED BY THE DELIVERY CONTRACTOR PRIOR TO ANY WORKS
- THE ACTUAL VEHICLES USED FOR THE DELIVERY OF BLADES AT THE OURACK WIND FARM DIFFER FROM THOSE SHOWN ON THIS DRAWING THEN ANY DESIGN BAGED UPON THIS INFORMATION WILL NEED TO BE REASSESSED TO CONFARM THAT IT IS ACCEPTABLE THE FOLLOWING VEHICLE ASSUMPTIONS HAVE BEEN MADE WITH REGARDS TO THE DELIVERY VEHICLE SUPPLIED TURNING RADIUS OF TRUCK ASSUMED TO BE 165M LOCK TO LOCK TURNING TIME ASSUMED TO BE 6 SECONDS. 4.2. 4.3 THE MAXIMUM DEGREE OF TRAILER WHEEL TURNING IS ASSUMED TO BE-45
R: 120.000 L:72357
1900 0.250 60 0.30 0305 0215 0363 0315 01 120 0.067
CASTLE GRANT BRIDGE
1
0516 180 0800 204.043-
9950 EP
PROPOSED BYPASS PLAN 1:1000
L‑64.623 L: 157.542 R‑600070 5600.000 R‑500.000 R‑500.000 K6.001 6.000 K5.000 12.60 L‑46.773 19.949 L 44.424 R: 120.000 0306 0.211 S210
CENTRELINE OPTION B LONGSECTION SCALE: H 1:1000,V 1:1000. Datum: 250.000 61.50m
BLADE DELIVERY VEHICLE 1:200
80.000 7600m 0.000 270.1 1700% L‑90547 0270 0.100- DAVA WAY 0.107- 0054 0.014 264 4.41 360 DEAT 0016 0.000 R: 175.000 L: 17.370 15.004 R‑500.000 K‑5000 SATO ‑31.789