Skip to content
Please be aware the content below has been generated by an AI model from a source PDF.

Item5Appendix1APlans20210105DETLaurelBank

CAIRNGORMS NATION­AL PARK AUTHOR­ITY Plan­ning Com­mit­tee Agenda Item 5 Appendix IA 24/06/2022

AGENDA ITEM 5

APPENDIX IA

2021/0105/DET

PLANS

SEC­TIONSEC­TION214.100 DATE REVI­SION REV DRW CHK 14.01.2021 P01 Plan­ning Applic­a­tion P01 AF GD 13.05.2021 P02 more details added P02 AF 25.05.2021 P03 pub­lic path at street enlarged P03 AF 26.05.2021 P04 Ham­mer­head revised P04 AF GD 26.05.2021 P05 pave­ment revised P06 AF GD 21.06.2021 P06 deck­ing revised to match eng. dr. P06 AF 04.10.2021 P07 Cycle pro­vi­sion updates and P07 cla­ri­fic­a­tion of cycle and bin pro­vi­sion 22.11.2021 Park­ing adjus­ted at Ripari­an strip P08 MP GD 15.12.2021 Hotel foot­print and park­ing altered P09 MP GD 07.01.2021 Hotel foot­print and park­ing altered P10 MP GD Sched­ule of Build­ings HOTEL83 rooms GFL 73.9 m² 21 rooms 2 wheel­chair access­ible, 19 double 1st FL 73.9 m² 31 rooms 1 wheel­chair access­ible, 11 fam­ily, 19 double 2nd FL 651 m² 31 rooms 1 wheel­chair access­ible, 10 fam­ily, 20 double GROUND FLOOR SHOP 1 75 m² SHOP 4 SHOP 2 73.9 m² SHOP 5 SHOP 3 73.9 m² SHOP 6 FIRST FLOOR TOTAL 12 SELF CATER­ING APART­MENTS 2BED 4P unit 76.6 m² 2BED 4P unit + DIN­ING 82.1 m² 2BED 4P unit enlarged 73.6 m² 3BED 6P unit 112.9 m² 2BED 4P unit 84.6 m² 2BED 4P unit + DIN­ING 88.5 m² SHEF­FIELD CYCLE STANDS Park­ing and access 209.85 under­ground car­park ground levels UPPER FLOOR APART­MENTS. 2 MAIN ENTRANCE TO UPPER FLOOR APARTMENTS,

MAIN ENTRANCE TO 2 Π FFL 213.650 SHOP 5 LIFT TO UPPER FLOOR APART­MENTS (SIZED TO TAKE SIZED TUTARE BICYCLE) BICYCLE STORE IN APART­MENT. 6000 4800 موع FFU=213.425 FFL-213.650 LIFT TO UPPER FLOOR APART­MENTS (SIZED TO TAKE BICYCLE) BICYCLE STORE IN APART­MENT. A PED­ES­TRI­AN LANE TOTAL 11 SELF CATER­ING APART­MENTS Key­plan 1 2 Park­ing spaces — 44 includ­ing 2 access­ible spaces at shop­ping area

  • 55 includ­ing 3 access­ible for hotel NOTE 1 — LIFT/ELEVATOR: To upper floor apart­ments- each apart­ment has indi­vidu­al stor­age cup­board with­in each for cycles; lift res­ized to take bicycles NOTE 2 — VIS­IT­ORS CYCLE PARK­ING: 10 Shef­field stands — space for 20 bicycles (Loc­ated at main entrance to apart­ments.) 3 NOTE 3 — SHOP­PING CYCLE PARK­ING: 12 Shef­field stands — space for 24 bicycles 4 NOTE 4STAFF CYCLE PARK­ING: 6 Shef­field stands — space for 12 bicycles 5 NOTE 5 — BINS ENCLOS­URE: (Waste and recyc­ling will be factored with private refuse col­lec­tion) APART­MENTS: 2 x1100 litre gal­van­ized bins / 5 house­holds (one recycle, one refuse) total require­ments 5 recycle and 5 refuse bins This draw­ing has been pre­pared solely for the use of: and there are no rep­res­ent­a­tions of any kind made by NORR Con­sult­ants Lim­ited to any party with whom NORR Con­sult­ants Lim­ited has not entered into a con­tract. This draw­ing must not be used, repro­duced or revised without writ­ten per­mis­sion. This draw­ing shall not be used for con­struc­tion pur­poses until the CON­STRUC­TION” status appears under the Sheet Status. Con­struct­ors must only work to fiqured dimen­sions which are to be checked on site. Do not scale from hard copy draw­ings. 3BED 6P unit 2BED 4P unit 2BED 4P unit + DIN­ING SECOND FLOOR bum 3BED 6P unit at street 2BED 4P unit enlarged 3BED 6P unit 2BED 4P unit 2BED 4P unit + DIN­ING 6m ripari­an strip 5 136.2 m² 73.6 m² 112.9 m² 84.6 m² 88.5 m² : 8 x1 100 litre gal­van­ized bins (4 x recycle, 4 x refuse) : 8 x1 100 litre gal­van­ized bins (4 x recycle, 4 x refuse) NOTE 6 — EV CHAR­GING AREA — 5 park­ing spaes with EV char­ging points SHOPS HOTEL 6 4450 4450 BINS FOR APART­MENTS 4450 BINS FOR HOTEL 4450 MAIN ENTRANCE TO UPPER FLOOR APART­MENTS. BINS FOR SHOPS 4450 2 FFL = 213.650 LIFT TO UPPER FLOOR APART­MENTS (SIZED TO TAKE BICYCLE) BICYCLE STORE IN APART­MENT 1 LIFT TO UPPER FLOOR APM­NTS (SIZED TAKE BICYCLE) BICYCLE STORE IN APART­MENT 165150 651 m² 0002 213.60 213.840 495 11350 6000 0009 SHOP 32 1080 0009 开 2 5000 FFL 213.200 FFL = 212.975 SHOP 73.9 m² LIFT TO UPPER FLOOR APART­MENTS (SIZED TO TAKE BICYCLE) BICYCLE STORE IN APART­MENT. 212.70 FFL = 212.750 dOHS Ex 211.960 3.000 R2.5m 0469 213.150 2 EV char­ging spaces 6 3 R2m .300 Ex 212.050 3 3500 GRAMPI­AN ROAD 6000 008 Hotel drop off 6000 211.959 R6m cycle park­ing 2.4x90m Vis­ib­il­ity Splay 585 2.865 212.510 6000 211.965 Ex 212 Ex211.94 B 6000 6077 3100 5000 4 2500 & 210.500 0001 4 丼丼丼 5750 211.830 2.4x90m Vis­ib­il­ity Splay Ex 209.100 Ex 209 170 809170 210.000 North Arrow 6m ripari­an strip Ex 209.468 Ex 209800 Ex 209.764 A Ex 209.666 Detail Sym­bol Con­sult­ants A‑NOR-ZZ-XX-DR-A-0061 NORR NORR Con­sult­ants Lim­ited. An Ingeni­um Inter­na­tion­al Com­pany Drawn Date AF 20.02.20 Checked Date 17.08.20 Scale Cli­ent GD 1:150 @A1 UPLAND DEVEL­OP­MENTS LTD. * Pro­ject ‑E Road Sur­fa­cing Legend:- MIXED USE DEVEL­OP­MENT GRAMPI­AN ROAD Denotes extent of private tar­mac road sur­fa­cing AVIEMORE Draw­ing Title Denotes extent of private foot­path sur­fa­cing SITE PLAN Denotes extent of adopt­able tar­mac road sur­fa­cing Denotes extent of por­ous block pav­ing road sur­fa­cing Denotes extent of por­ous block car park sur­fa­cing Sheet Status Denotes extent of por­ous block ped­es­tri­an area sur­fa­cing. TBC by Archi­tect Pro­ject No. IAIV 18 – 0001 Draw­ing No. AVI-NOR-ZZ-XX-DR-A-0002 Rev. P10 1:2000m12m

……… SHOP 73.9 SHOP 1 73.9 m² SHOP 1 SHOP 12 73.9 m² SHOP 2 75.0 m² GROUND FLOOR PLAN 1 m² Π 2 bed 4p 76.6 m² 2 bed 4p + D 82.1 m² 2 bed 4p 73.6 m² 2 bed 4p 73.6 m² 3 bed 6p 112.9 m² 2 bed 4p 84.6 m² ……… ㅁㅁ XX Π ☑ 3 bed 6p 132.6 m² 2 bed 4p 73.6 m² 2 bed 4p 73.6 m² FIRST FLOOR PLAN SECOND FLOOR PLAN …………… SHOP 3 651 m² 2 bed 4p + d 88.5 m² 2 bed 4p 73.6 m² 2 bed 4p + d 88.5 m² □□ 154 هر 1650 16856925 N Π 2 bed 4p 73.6 m² 2 bed 4p + d 88.5 m² 2810 600 600 2615 BED­ROOM 1 en suite 10.90 m² BATH­ROOM 4.60 m² 1780 2000 BED­ROOM 2 10.14 m² 2835 2BED 4P DIN­ING KIT­CHEN LIV­ING ROOM 8.56 m² 19.10 m² 3060 3765 4350 3880 DIN­ING 9.70 m² 3056 1214 1600 4605 ………….. 1800 4350 2 bed 4p 73.6 m² Lift — Kone or equally approved allow­ing space for bicycle 3880 GROUND FLOOR SHOP 4 73.9 m² SHOP 1 75 m² SHOP 2 73.9 m² SHOP 5 73.9 m² SHOP 3 73.9 m² SHOP 6 651 m² FIRST FLOOR TOTAL 12 SELF CATER­ING APART­MENTS 2BED 4P unit 76.6 m² 2BED 4P unit + DIN­ING 82.1 m² 2BED 4P unit enlarged 73.6 m² 3BED 6P unit 112.9 m² 2BED 4P unit 84.6 m² 88.5 m² 2BED 4P unit + DIN­ING SECOND FLOOR TOTAL 11 SELF CATER­ING APART­MENTS 3BED 6P unit at street 2BED 4P unit enlarged 3BED 6P unit 2BED 4P unit 2BED 4P unit + DIN­ING 136.2 m² 73.6 m² 112.9 m² 84.6 m² 88.5 m² DATE REV DRW CHK P01 AF GD REVI­SION 14.01.2021 P01 Plan­ning Applic­a­tion 25.05.2021 P02 Cycle stor­age indic­ated with­in flats P02 AF GD 22.06.2021 P03 Lifts revised P03 AF GD This draw­ing has been pre­pared solely for the use of: and there are no rep­res­ent­a­tions of any kind made by NORR Con­sult­ants Lim­ited to any party with whom NORR Con­sult­ants Lim­ited has not entered into a con­tract. This draw­ing must not be used, repro­duced or revised without writ­ten per­mis­sion. This draw­ing shall not be used for con­struc­tion pur­poses until the CON­STRUC­TION” status appears under the Sheet Status. Con­struct­ors must only work to figured dimen­sions which are to be checked on site. Do not scale from hard copy draw­ings. Key­plan North Arrow Detail Sym­bol ENLARGED FLOOR PLANS 1:50 Con­sult­ants 2615 600 $00 2810 2000 BED­ROOM 2 10.14 m² BED­ROOM 1 en suite 10.90 m² BATH­ROOM 4.60 m² 2835 2BED 4P LIV­ING ROOM KIT­CHEN 19.10 m² 8.56 m² 3765 3060 1685 1650 3880 NORR NORR Con­sult­ants Lim­ited. An Ingeni­um Inter­na­tion­al Com­pany Drawn Date AF 20.02.20 Checked Date GD 17.08.20 Scale Cli­ent 1:150 @ A1 UPLAND DEVEL­OP­MENTS LTD. Pro­ject MIXED USE DEVEL­OP­MENT GRAMPI­AN ROAD AVIEMORE Draw­ing Title SELF CATER­ING APART­MENTS — FLOOR PLANS Sheet Status Pro­ject No. IAIV 18 – 0001 Draw­ing No. Rev. AVI-NOR-ZZ-XX-DR-A-0010 P03 AVI-NOR-ZZ-XX-DR-A-0001

TAU UPVC FACIAS AND SOF­FITS TIM­BER EFFECT CLAD­DING ALUC­LAD WIN­DOWS OFF WHITE RENDER KING­SPAN METLA PAN­ELS AT STAIR­WELLS AND DORMERS NORTH ELEV­A­TION SCALE 1:100 1:100mm DATE REVI­SION 14.01.2021 P01 Plan­ning Applic­a­tion REV DRW CHK P01 AF GD This draw­ing has been pre­pared solely for the use of: and there are no rep­res­ent­a­tions of any kind made by NORR Con­sult­ants Lim­ited to any party with whom NORR Con­sult­ants Lim­ited has not entered into a con­tract. This draw­ing must not be used, repro­duced or revised without writ­ten per­mis­sion. This draw­ing shall not be used for con­struc­tion pur­poses until the CON­STRUC­TION status appears under the Sheet Status. Con­struct­ors must only work to figured dimen­sions which are to be checked on site. Do not scale from hard copy draw­ings. Key­plan North Arrow Detail Sym­bol Con­sult­ants A‑NOR-ZZ-XX-DRA-0001 NORR NORR Con­sult­ants Lim­ited. An Ingeni­um Inter­na­tion­al Com­pany Drawn Date AF 20.02.20 Checked Date GD 17.08.20 Scale 1:150 @A1 Cli­ent UPLAND DEVEL­OP­MENTS LTD. Pro­ject MIXED USE DEVEL­OP­MENT GRAMPI­AN ROAD AVIEMORE Draw­ing Title SELF CATER­ING APART­MENTS WEST AND NORTH ELEV­A­TIONS WEST ELEV­A­TION SCALE 1:100 Sheet Status Pro­ject No. IAIV 18 – 0001 DravAVI-NOR-ZZ-XX-DR-A-0011 Rev. P01

GREY RENDER GREY CON­CRETE ROOF TILES UPVC FACIAS AND SOF­FITS TIM­BER EFFECT CLAD­DING ALUC­LAD WIN­DOWS OFF WHITE RENDER KING­SPAN METLA PAN­ELS AT STAIR­WELLS AND DORMERS EAST ELEV­A­TION SCALE 1:100 1:1002m 3m ΠΕ DATE REVI­SION 14.01.2021 P01 Plan­ning Applic­a­tion REV DRW CHK P01 AF GD This draw­ing has been pre­pared solely for the use of: and there are no rep­res­ent­a­tions of any kind made by NORR Con­sult­ants Lim­ited to any party with whom NORR Con­sult­ants Lim­ited has not entered into a con­tract. This draw­ing must not be used, repro­duced or revised without writ­ten per­mis­sion. This draw­ing shall not be used for con­struc­tion pur­poses until the CON­STRUC­TION status appears under the Sheet Status. Con­struct­ors must only work to figured dimen­sions which are to be checked on site. Do not scale from hard copy draw­ings. Key­plan North Arrow Con­sult­ants Detail Sym­bol AI-NOR-ZZ-XX-DR-A-0001 NORR NORR Con­sult­ants Lim­ited. An Ingeni­um Inter­na­tion­al Com­pany Drawn Date AF 20.02.20 Checked Date GD 17.08.20 Scale 1:150 @A1 Cli­ent UPLAND DEVEL­OP­MENTS LTD. Pro­ject MIXED USE DEVEL­OP­MENT GRAMPI­AN ROAD AVIEMORE Draw­ing Title SELF CATER­ING APART­MENTS EAST AND SOUTH ELEV­A­TIONS SOUTH ELEV­A­TION SCALE 1:100 Sheet Status Pro­ject No. Draw­ing No. IAIV 18 – 0001 Dra AVI-NOR-ZZ-XX-DR-A-0012 Rev. P01

ISO A1-594m­mx841 mm 25 2 23 22 This draw­ing has been pre­pared solely for the use of UPLAND DEVEL­OP­MENTS LTD. and there are no rep­res­ent­a­tions of any kind made by NORR Con­sult­ants Lim­ited to any party with whom NORR Con­sult­ants Lim­ited has not entered into a con­tract This draw­ing must not be used, repro­duced or revised without writ­ten per­mis­sion. This draw­ing shall not be used for con­struc­tion pur­poses until the CON­STRUC­TION” status appears under the Sheet Status. Con­struct­ors must only work to figured dimen­sions which are to be checked on site. Do not scale from hard copy draw­ings DATE 22/12/21 First issue 11/01/22 Plan­ning issue ready 21 20 Zo 18 REVISION

16 32 33 34 35 36 37 38 39 40 41 3 30 29 3422.50 mm 28 27 15 14 73 2 00 — base­ment level SCALE: 1:100 PLANT 33.1 m² 26 9 8 7 42 10 LIFT LIFT 6 5 4 3 2 REVDRW CHK Key­plan Detail Sym­bol North Arrow P01 P02 Detail No. Sheet No. NORR NORR Con­sult­ants Lim­ited. An Ingeni­um Inter­na­tion­al Com­pany SET OFFICE INFORM­A­TION www​.norr​.com 1 m20 10 64 210 SCALE1:200 PRIN­TED AT A3 m10 6 4 21 0 SCALE 1:100 PRIN­TED AT A1 Cli­ent Draw­ing Title UPLAND DEVEL­OP­MENTS LTD. Pro­ject PLAN — BASE­MENT LEVEL MIXED USE DEVEL­OP­MENT GRAMPI­AN ROAD AVIEMORE — ALTS OPTION 1 Drawn MP Checked GD Scale 1:100 @ A1 Date Sheet Status Date Pro­ject No. Draw­ing No. Rev. AVI-NOR-ZZ-XX-DR-A-0020. P02

ISO A1-594m­mx841mm 3 AVI-NOR-ZZ-XX-DR-A-0031 FIRE ESCAPE DELIV­ERY 17.4 m² WC 16.8 m² STAFF 16.4 m² WC 16.8 m² AVI-NOR-ZZ-XX-DR-A-0031 STORE 34.5 m² BAR STORE 16.8 m² STORE 26.2 m² BAR 174.8 m² 00 — Ground Floor SCALE: 1:100 KIT­CHEN 141.6 m² 2 AVI-NOR-ZZ-XX-DR-A-0030 LIFT LIFT RECEP­TION OFFICE AVI-NOR-ZZ-XX-DR-A-0030 DIN­ING 242.4 m² DATE 22/12/21 First issue REVI­SION REVDRW CHK P01 11/01/22 Plan­ning issue ready P02 This draw­ing has been pre­pared solely for the use of UPLAND DEVEL­OP­MENTS LTD. and there are no rep­res­ent­a­tions of any kind made by NORR Con­sult­ants Lim­ited to any party with whom NORR Con­sult­ants Lim­ited has not entered into a con­tract This draw­ing must not be used, repro­duced or revised without writ­ten per­mis­sion. This draw­ing shall not be used for con­struc­tion pur­poses until the CON­STRUC­TION” status appears under the Sheet Status. Con­struct­ors must only work to figured dimen­sions which are to be checked on site. Do not scale from hard copy draw­ings Key­plan CON­SER­VAT­ORY 97.3 m² North Arrow Detail Sym­bol 2 AVI-NOR ZZ-XX-DR-A-0031 m20 10 210 SCALE1:200 PRIN­TED AT A3 m10 Detail No. Sheet No. NORR NORR Con­sult­ants Lim­ited. An Ingeni­um Inter­na­tion­al Com­pany 5 Long­man Road, Inverness IV1 1RY Scot­land, UK norr​.com Drawn Date MP Checked Date GD Scale Cli­ent 1:100 UPLAND DEVEL­OP­MENTS LTD. Pro­ject MIXED USE DEVEL­OP­MENT GRAMPI­AN ROAD AVIEMORE — ALTS — OPTION 1 Draw­ing Title PLAN — GROUND FLOOR LEVEL Sheet Status 6 4 2 0 Pro­ject No. SCALE1:100 PRIN­TED AT A1 Draw­ing No. Rev. AVI-NOR-ZZ-XX-DR-A-0021 P02

ISO A1-594m­mx841mm 12(2) 142 FO 3112.13 mm 17(2) 80 6(2) LAUN­DRY 01- First Floor SCALE: 1:100 5(2) 21(2) 23(2) D GD 4(2) 1(2) 24(2) 25(2) 26(2) 27(2) 28(2) REFUGE WHEEL­CHAIR PASSING FIRE ESCAPE LIFT LIFT 32(2) 31(2) 30(2 DATE REVI­SION REVDRW CHK 22/12/21 First issue P01 11/01/22 Plan­ning issue ready P02 29(2) This draw­ing has been pre­pared solely for the use of UPLAND DEVEL­OP­MENTS LTD. and there are no rep­res­ent­a­tions of any kind made by NORR Con­sult­ants Lim­ited to any party with whom NORR Con­sult­ants Lim­ited has not entered into a con­tract This draw­ing must not be used, repro­duced or revised without writ­ten per­mis­sion. This draw­ing shall not be used for con­struc­tion pur­poses until the CON­STRUC­TION” status appears under the Sheet Status. Con­struct­ors must only work to figured dimen­sions which are to be checked on site. Do not scale from hard copy draw­ings Key­plan m20 10 27170 SCALE1:200 PRIN­TED AT A3 North Arrow Detail Sym­bol Detail No. Sheet No. NORR NORR Con­sult­ants Lim­ited. An Ingeni­um Inter­na­tion­al Com­pany 5 Long­man Road, Inverness IV1 1RY Scot­land, UK norr​.com Drawn Date Author Checked Date Check­er Scale 1:100 Cli­ent UPLAND DEVEL­OP­MENTS LTD. Pro­ject MIXED USE DEVEL­OP­MENT GRAMPI­AN ROAD AVIEMORE — ALTS — OPTION 1 Draw­ing Title PLAN — FIRST FLOOR LEVEL m10 6 4 2 0 Sheet Status SCALE 1:100 PRIN­TED AT A1 Pro­ject No. Draw­ing No. Rev. AVI-NOR-ZZ-XX-DR-A-0022 P02

ISO A1-594m­mx841mm 12(2 16(2) 17(2) LAUN­DRY 02 — Second Floor SCALE: 1:100 22(2) 3(2) 23121 212) 1(2) 24(2) 25(2) 26(2) 27(2) 28(2) REFUGE WHEEL­CHAIR PASSING FIRE ESCAPE LIFT LIFT 32(2) DATE REVI­SION REVDRW CHK 22/12/21 First issue P01 11/01/22 Plan­ning issue ready P02 29(2) This draw­ing has been pre­pared solely for the use of UPLAND DEVEL­OP­MENTS LTD. and there are no rep­res­ent­a­tions of any kind made by NORR Con­sult­ants Lim­ited to any party with whom NORR Con­sult­ants Lim­ited has not entered into a con­tract This draw­ing must not be used, repro­duced or revised without writ­ten per­mis­sion. This draw­ing shall not be used for con­struc­tion pur­poses until the CON­STRUC­TION” status appears under the Sheet Status. Con­struct­ors must only work to figured dimen­sions which are to be checked on site. Do not scale from hard copy draw­ings Key­plan 31(2) 30(2) m20 10 210 SCALE1:200 PRIN­TED AT A3 m10 North Arrow Detail Sym­bol Detail No. Sheet No. NORR NORR Con­sult­ants Lim­ited. An Ingeni­um Inter­na­tion­al Com­pany 5 Long­man Road, Inverness IV1 1RY Scot­land, UK norr​.com Drawn Date Author Checked Date Check­er Scale 1:100 Cli­ent UPLAND DEVEL­OP­MENTS LTD. Pro­ject MIXED USE DEVEL­OP­MENT GRAMPI­AN ROAD AVIEMORE — ALTS — OPTION 1 Draw­ing Title PLAN — SECOND FLOOR LEVEL Sheet Status 6 4 2 0 Pro­ject No. SCALE1:100 PRIN­TED AT A1 Draw­ing No. Rev. AVI-NOR-ZZ-XX-DR-A-0023 P02

ISO A1-594m­mx841mm 3/ AVI-NOR-ZZ-XX-DR-A-0031 14(3) AVI-NOR-ZZ-XX-DR-A-0031 12(3) 15(3) 11(3) 16(3) 10(3) 17(3) 03 — third floor plan SCALE: 1:100 80 2 AVI-NOR-ZZ-XX-DR-A-0030 6(3) 5(3) LAUN­DRY LAUN­DRY 18(3) AVI-NOR-ZZ-XX-DR-A-0030 DATE REVI­SION 11/01/22 Plan­ning issue ready REVDRW CHK P01 4(3) 1(3) ID This draw­ing has been pre­pared solely for the use of UPLAND DEVEL­OP­MENTS LTD. and there are no rep­res­ent­a­tions of any kind made by NORR Con­sult­ants Lim­ited to any party with whom NORR Con­sult­ants Lim­ited has not entered into a con­tract This draw­ing must not be used, repro­duced or revised without writ­ten per­mis­sion. This draw­ing shall not be used for con­struc­tion pur­poses until the CON­STRUC­TION” status appears under the Sheet Status. Con­struct­ors must only work to figured dimen­sions which are to be checked on site. Do not scale from hard copy draw­ings Key­plan D 3(3) 2(3) 2 AVI-NOR ZZ-XX-DR-A-0031 North Arrow Detail Sym­bol Detail No. Sheet No. NORR NORR Con­sult­ants Lim­ited. An Ingeni­um Inter­na­tion­al Com­pany 5 Long­man Road, Inverness IV1 1RY Scot­land, UK norr​.com Drawn Date Author Checked Date Check­er Scale 1:100 Cli­ent UPLAND DEVEL­OP­MENTS LTD. Pro­ject MIXED USE DEVEL­OP­MENT GRAMPI­AN ROAD AVIEMORE — ALTS OPTION 1 Draw­ing Title PLAN — THIRD FLOOR Sheet Status SET STATUS Pro­ject No. Draw­ing No. Rev. AVI-NOR-ZZ-XX-DR-A-0024 P01

ISO A1-594m­mx841 mm This draw­ing has been pre­pared solely for the use of UPLAND DEVEL­OP­MENTS LTD. and there are no rep­res­ent­a­tions of any kind made by NORR Con­sult­ants Lim­ited to any party with whom NORR Con­sult­ants Lim­ited has not entered into a con­tract This draw­ing must not be used, repro­duced or revised without writ­ten per­mis­sion. This draw­ing shall not be used for con­struc­tion pur­poses until the CON­STRUC­TION” status appears under the Sheet Status. Con­struct­ors must only work to figured dimen­sions which are to be checked on site. Do not scale from hard copy draw­ings DATE 22/12/21 First issue 11/01/22 Plan­ning issue ready REVI­SION 04 — Roof plan SCALE: 1:100 REVDRW CHK Key­plan Detail Sym­bol North Arrow P01 P02 Detail No. Sheet No. NORR NORR Con­sult­ants Lim­ited. An Ingeni­um Inter­na­tion­al Com­pany SET OFFICE INFORM­A­TION www​.norr​.com m20 10 64 210 SCALE1:200 PRIN­TED AT A3 m10 6 4 2 1 0 SCALE 1:100 PRIN­TED AT A1 Cli­ent Draw­ing Title UPLAND DEVEL­OP­MENTS LTD. Pro­ject PLAN — ROOF MIXED USE DEVEL­OP­MENT GRAMPI­AN ROAD AVIEMORE — ALTS OPTION 1 Drawn MP Checked Date Sheet Status SET STATUS Date Pro­ject No. Scale 1:100 @ A1 Draw­ing No. Rev. AVI-NOR-ZZ-XX-DR-A-0025. P02

ISO A1-594m­mx841 mm Elev­a­tion 6‑a SCALE: 1:100 Elev­a­tion 2 a SCALE: 1:100 This draw­ing has been pre­pared solely for the use of UPLAND DEVEL­OP­MENTS LTD. and there are no rep­res­ent­a­tions of any kind made by NORR Con­sult­ants Lim­ited to any party with whom NORR Con­sult­ants Lim­ited has not entered into a con­tract This draw­ing must not be used, repro­duced or revised without writ­ten per­mis­sion. This draw­ing shall not be used for con­struc­tion pur­poses until the CON­STRUC­TION” status appears under the Sheet Status. Con­struct­ors must only work to figured dimen­sions which are to be checked on site. Do not scale from hard copy draw­ings DATE 22/12/21 First issue 11/01/22 Plan­ning issue ready REVI­SION REVDRW CHK Key­plan Detail Sym­bol North Arrow P01 P02 Detail No. Sheet No. NORR NORR Con­sult­ants Lim­ited. An Ingeni­um Inter­na­tion­al Com­pany SET OFFICE INFORM­A­TION www​.norr​.com m10 6 SCALE1:100 4 2 1 0 Cli­ent Draw­ing Title UPLAND DEVEL­OP­MENTS LTD. Pro­ject ELEV­A­TIONS — SHEET 1 MIXED USE DEVEL­OP­MENT GRAMPI­AN ROAD AVIEMORE — ALTS — OPTION 1 Drawn MP Checked GD Scale 1:100 @ A1 Date Sheet Status Date Pro­ject No. Draw­ing No. Rev. AVI-NOR-ZZ-XX-DR-A-0030 P02

×

We want your feedback

Thank you for visiting our new website. We'd appreciate any feedback using our quick feedback form. Your thoughts make a big difference.

Thank you!