Item5Appendix1PlansBallaterOldSchool20200206DETand20200207LBC
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Agenda Item 5 Appendix 1 13/11/2020
AGENDA ITEM 5
APPENDIX I
2020/0206/DET AND 2020/0207/LBC
PLANS DE 61 ZL Masonic Hall Post 8 LOCATION PLAN SL This drawing is the property and copyright of Ian Rodger Architects. The information therein should not be reproduced in any form without the prior written permission of Ian Rodger Architects. Do not scale off this drawing: All dimensions to be checked on site, and any discrepancies to be brought to the attention of the architect before proceeding. Inchgarth Cottage SCHOOL LANE 6 ABERGELDIE ROAD Rev. Description Rannoch Fairdene Coorie Doon 28 26 VIEWFIELD PLACE N By Date Project HOUSING PROPOSALS Location FORMER BALLATER SCHOOL Client/s GRAMPIAN HOUSING ASSOC. Drawing Title LOCATION PLAN Job No. B232 Drawing No. Revision 001 Scale….at A4 Date Om 50m Drawn by 1:1000 DEC.’15 SR R IAN RODGER ARCHITECTS 28 Bridge Street Ballater AB35 5QP Tel. 01339 329029 info@ir-architects.co.uk www.ir-architects.co.uk 8 GROUND FLOOR / SITE PLAN (5097) xisting (5096) 50m visibility splay V V V Ο Existing Gate Inchgarth Cottage —SCHOOL-LANE Π (5081) cinatatec for existing school house for existing school house for existing school house Roadside Parking ABERGELDIE ROAD Exist 8 N trẻp (5087) 10m and re • existing tree (5074) existing vehicle access Coorie Doon EXTERNAL FINISHES LIGHTING 4m high Thorlux Starbeamlighting column, with 31W-4000K LED 1.05m high Thorlux Probe bollard, with 24W — 4000K LED Thorlux Cobalt Eyelid bulkhead fitting, with 15W-4000K LED, microwave presence detector PAVING Tobermore Shannon Duo permeable block paving, ‘Charcoal’, to vehicular areas; with “Natural” paving blocks to delineate parking bays Tobermore standard flags, ‘Natural’ to pedestrian areas NOTE: All vegetable soil to be removed from the footprint of the Building in accordance with Section 3.1 of the Building Standards This drawing is the property and copyright of Ian Rodger Architects. The information therein should not be reproduced in any form without the prior written permission of Ian Rodger Architects. Do not scale off this drawing: All dimensions to be checked on site, and any discrepancies to be brought to the attention of the architect before proceeding. 26 ting (5089) Amendment to Kerb buildouts as per Engineer’s Recommendations Accessible Parking Amendments Block Layout Amendments Building Standards Amendments Reduction of column lighting gotut, to assist bats Removal of temporary cons ruction access Windows added, to reflect elevations Landscaping and lighting Site context added Planning App Additional par Parking layout revi Scription pace, and refuse bins arrangement VIEWFIELD ROA Proje HOUSING PROPOSALS Location FORMER/BALLATER SCHOOL Client/s GRAMPIAN HOUSING ASSOC. Drawing Title/PROPOSED GROUND/SITE PLAN Job No B232 Drawing No. Revision 020 Scale….at A2 1:250 Date Drawn by MAY.’18 PP 28.02.20 23.01.28 PPPRRRRR&&& 12.11.19 85.06.19 26.82.19 20.08.19 08.02.19 30.01.19 31.12.18 28.12.18 18.06.18 31.05.18 By Date R IAN RODGER ARCHITECTS 28 Bridge Street Ballater AB35 5QP Tel. 01339 329029 info@ir-architects.co.uk www.k‑architects.co.uk 01 02 03 04 05 06 15 17 18 07 08 09 10 COURTYARD FLOOR PLAN 14 B< — >C L 01 02 103 <04 ك 091 06」 B< — >C 07 A 15 16 コ SOUTH ELEVATION — PAVILION B‑1 B— WEST ELEVATION (WEST SCHOOLHOUSE GABLE) 15 NORTH ELEVATION/SECTION A‑A 14 13 This drawing is the property and copyright of Ian Rodger Architects. The information therein should not be reproduced in any form without the prior written permission of Ian Rodger Architects. Do not scale off this drawing: All dimensions to be checked on site, and any discrepancies to be brought to the attention of the architect before proceeding. on of wall — & granite Steel lintol brick ingos Timber lintol & granite ingos Steel lintol Timber lintol Good granite & Tough ingos corner margins 03 02 01 Brick infill between doors SECTION B‑B Raggle into granite — from courtyard roof Granite knitted into side wall of link to pavilion SECTION C‑C 12 09 Granite chimney Timber lintol & timber infill 07 06 05 Rev. Additional Photographs Added Gable Drawing Added Notes Amendments Description 05.08.20 07.07.20 10.06.19 By Date Steel lintol & brick inges 08 Line of former lean-to building
- raggle into granite Project HOUSING PROPOSALS Location FORMER BALLATER SCHOOL Client/s GRAMPIAN HOUSING ASSOC. Drawing Title EXISTING COURTYARD WALLS Job No. B232 Scale….at A1 1:100 Drawing No. Revision 030 C Date Drawn by JUL.’20 PP IAN RODGER ARCHITECTS 28 Bridge Street Ballater AB35 5QP Tel. 01339 329029 info@ir-architects.co.uk www.ir-architects.co.uk 01 02 03 04 05 06 15 17 07 08 09 10 G EDROOM BEDROOM UNIT 22 15 16 2ho. BED/HOUSE UNIT 07 2no. BED HOUSE BATHROOM 09 BEDROOM UNIT 08 2ng. BED HOUSE STO BEDROOM I 102 03 STORE UNIT 12 1.5no. BED HOUSE 06 STORE UNIT 09 2no. BED HOUSE UNB UNIT 11 BED 2no. BED HOUSE KITCHEN 00 KITCHEN UNIT 24 1.5no. BED HOUSE 17 COURTYARD FLOOR PLAN Existing cement render to be picked off. Granite walls to be finished with lime pointing, as N Existing approved with CNPA Granite Wall 18 Lime-based roughcast finish, colour to be agreed with CNPA Tooth in and make good each granite nib, and form cope on top SOUTH ELEVATION — PAVILION Rendered chimney to be removed, and roof made good UNIT 21 2no. BED HOUSE UNIT 23 3no. BED HOUSE Granite from chimneys downtakings to be utilised in repair of this corner Lime-based roughcast finish, colour to be agreed with CNPA Replace outer steel lintol with precast concrete lintol Granite base course to be reinstated towards rear of gable WEST ELEVATION (WEST SCHOOLHOUSE GABLE) 15 b NORTH ELEVATION/SECTION A‑A SECTION B‑B 04 Build out two sections, with blockwork, to line through with granite wall Roughcast taken along existing Make good, on raggle removal of granite lintol, and reinstate cope Lime-based roughcast finish, colour to be 12 agreed with CNPA —A SECTION C‑C Infill additional existing door opening widths with block and render 13 puter with Lime-based roughcast taken up to underside of tabling overhang Lime-based roughcast finish, colour to be agreed with CNPA Granite dressed comer stones, supplemented with others from downtakings, and roughcast set back from the corners 13 This drawing is the property and copyright of Ian Rodger Architects. The information therein should not be reproduced in any form without the prior written permission of Ian Rodger Architects. o the attention of the architect before proceeding. General: All existing slated roofs to be carefully stripped, and where possible slates retained for re-use; supplemented with second-hand Welsh slates te lintol 07 06 05 Chimney to be removed, and roof made good. Top of chimney breast chamfer to be completed with matching granite fillets. Replace with precast concrete lintol, and with ingos replaced new with brick/blockwork rp 03 02 01 rwp Roughcast taken along to existing corner margin A — - Chimney to be removed, and roof made good Lime-based roughcast finish, new colour to be rwp Replace with agreed with CNPA precast concrete linto Roughcast taken along to existing margin West Elevation Amended Additional Notes Added Unit 23 Chimney Added Gable Drawing Added Notes Amendments Chimney to be Rev. Description removed, and roof made good Remove timber lintol, build out with blockwork, and new precast concrete lintol, to line through with granite wall new 08 rwp SR 26.10.20 05.08.20 PP 04.08.20 07.07.20 PP 10.06.19 By Date Replace with precast concrete lintol Project HOUSING PROPOSALS Location FORMER BALLATER SCHOOL Client/s GRAMPIAN HOUSING ASSOC. Drawing Title PROPOSED COURTYARD WALLS Job No. B232 Scale….at A1 1:100 Drawing No. 031 Date Revision E Drawn by JUL.’20 PP R IAN RODGER ARCHITECTS 28 Bridge Street Ballater AB35 5QP Tel. 01339 329029 info@ir-architects.co.uk www.ir-architects.co.uk