Skip to content
Please be aware the content below has been generated by an AI model from a source PDF.

Item5Appendix1PlansJune20200009DET

CAIRNGORMS NATION­AL PARK AUTHOR­ITY Plan­ning Com­mit­tee Agenda Item 5 Appendix I 25/06/2021

AGENDA ITEM 5

APPENDIX I

2020/0009/DET

PLANS

Kenil­worth Waver­ley Cot­tage Abbots­ford OLD STA­TION The Old Sta­tion Plot 3 ain­tained by COO Pond CG Site/​landscape plan -/500 10 15 20 25 30 35 Arkle High­lands Plot 5 Row­an House Plot Clair­ville plant­ing to be out­with tboun they are main­tained b Dun­roam­in Tree plant­ing to be plot bound­ar­ies to they are main­tained by New 2m path onto Spey­side Way. Hard stand­ing quarry dust until phase 2 is com­plete To future devel­op­ment. With gal­van­ised steel gate plant­ing to be out with bound­ar­ies they are main­tained by 8 x Afford­able units Play park amen­ity space Larach Mor Auchroisk 10 9 PLANT­ING SCHED­ULE ‑Sil­ver Birch 1.5 – 1.8m semi stand­ard ‑Row­an owan (SOR­BUS AUCU­PARIA) 1.5 – 1.8m semi stand­ard ‑Cherry (PRUN­US AVI­UM) North Plant­ing should be car­ried spe­cies an sath­er con­di­tions. Trees planted D- Eld­er (SAM­BU­CUS NIGRA) E‑Hawthom (CRATAE­GUS MONO­GYNA) F‑Blackthom (PRUN­US SPINOSA) the plant­ing sea­son (typ­ic­ally Octo­ber to May) sub­ject to vari­ous d with­in of col­lec­tion from nurs­ery. When plant­ing roots of pro­tec­tion should be securely fit­ted in hould be healed into the ground to avoid air pock­ets. Area around stem to be cleared im in dia­met­er. A slow release gen­er­al fer­til­izer should be used. Plant­ing pit should be at least 100mm deep­er and wider than root sys­tem. Bark mulch 100mm deep and 1m dia­met­er around tree LAND­SCAPE MAIN­TEN­ANCE It is inten­ded that the road and com­mun­al p Coun­cil. ividu­al ‑Grass ements occu­pant. the High­land adop­ted and main­tained by the Occu­pants to under­take 14no grass cuts includ­ing edging at 2 week inter­vals (April to Octo­ber). Allow main­tain­ing new tree bases pro­tec­ted from grass gut­ting machinery. lit­ter to be removed. Weed killer applied cleared earth circle 1m dia­met­er. Bases to be annu­ally. Mirador Tre rub­ber Trees to be neces­sary. Any min­im­um 75mm inc which I and repaired wher Pon Hous­ing asso­ci­ation. opin­ion of the plan­ning author­ity, are dying, being severely dam­aged or become ser­i­ously dis­eased with­in three years of plant­ing, shall be replaced by trees or shrub of sim­il­ar size and spe­cies of those ori­gin­ally required to be planted. TREE PRO­TEC­TION Leaf col­lec­tion when require Gravel drives kept free of weeds / / com­mun­al areas Afford­able devel­op­ment (un) 1 – 18) shall be main­tained by the ‑The per­meable Lockblock pav­ing sys­tem requires little main­ten­ance. Visu­al inspec­tion and sweep­ing the face 2 – 4 times a year is required. Keep­ing the sur­face debris free and clear of con­tam­in­a­tion ensure that sur­face remains per­meable nany years. Sweep­ing of the sur­face can be car­ried out manu­ally or mech­an­ic­ally. Mech­an­ic­al sweep­ing should be car­ried out with the suc­tion fea­ture of the machine turned off. Sur­face dress­ing grit that is mis­placed by sweep­ing eeds to be replaced to ensure the struc­tur­al and hydraul­ic per­form­ance of the sur­face. TREE PRO­TEC­TION DETAILS There trees pro­tec­tion should site, how­ever there are a small num­ber of trees along the south bound­ar­ies. ided as noted in the adja­cent detail. /​Wester Auchrnisk Path (um) SUDS with post and Novere AUCHROISK PLACE 8 INTEN­ANCE OF LINK PAT It is inten­ded that the path e adop­ted and main­tained by the High­land Coun­cil as part of the Path net­work. nd glass col­lec KIRK ROAD ESS West­holme Con­nec­tion to exist­ing pub­lic foot­path New link path on verge unty Cot­tages F Loc­a­tion 1:2500 KEY TAR­MAC PATH TAR­MAC ROAD SLOPED BANK, GRASS GRAVEL DRIVE LOCKBLOCK PARK­ING CON­CRETE PAVING/PATIO LINK PATH. GRAVEL ON TER­RAM 900mm high stock­proof 1.8m high ver­tic­al tim­ber fen 900mm high ver­tic­al Hedge edge plant­ing. Beech hedging to be main­tained at 0.9m high. Post and wire fence along side intern­al toplot lar­ies Low level b plant­ing, Broom (CYT­ISUS SCOPARI­US), Juni­per (JUNI­PER­US COM­MUNIS) Blae­berry, Hazel (CORYLUS AVEL­LANA) Moor­land grass Total units =18 8 Afford­able units (1118) to con­sist of: ‑2/2B/3B flexi units for social rent ‑2/3B5P semi vil­las for Lift ‑4/3B5P semi vil­las for MMR Plan­ning issue reyn­olds archi­tec­ture Itd. 1 tul­loch street, ding­wall. IV15 9JY tel. 01349 867766 fax. 01349 867769 fence www​.reyn​olds​-archi​tec​ture​.com 400mm high tim­ber fen Tree Pro­tec­tion No. Descrip­tion Date Tree Plant­ing A Plan­ning points 12.02.20 Low level Bol­lard Light­ing to link path B Land­scape alter­a­tions 28.04.20 C Updated for engin­eers 25.06.20 drain­age design D Land­scape alter­a­tions 12.08.20 Site alter­a­tions 02.10.20 F Site alter­a­tions 18.02.21 G Red line alter­a­tions 10.05.21 Link Path 1:50 Val­ley Con­struc­tion Ser­vices Hous­ing at Crom­dale Site/​landscape Plan Cam­brae Date 09.04.19 Play Area Drawn by GIR Fences 2019 021 – 000 1:25 Scale As indicated

Air source heat pump placed on slabs 1800 2388 2400 39.50° 2400 35.00° Sec­tion thru kit­chen Sec­tion thru gar­age 1:100 1:100 Ground floor 4000 st Gar­age Can­opy over 6500 1:100 Area= 115msq not includ­ing gar­age st en‑s 1300 1138 Bed­room 1 3035 3399 1839 4800 Lounge 4100 2911 00 00 Util­ity Kitchen/​dining/​living open fea­ture stair st 2237 w/​c 1200 coats Π 8300 w/​r 2600 velux velux w/​r ‑3310 w/​r St 2775 bath­room 3651 Bed­room 2 1838 1938- velux dress­er 3400- Mas­ter bed­room en‑s 2550 4647 velux 5200 3475 0 1 2 3 45 Scale 1:100 @ A3 Meters w/​r Bed­room 3 3310 Plan­ning issue First floor Slid­ing door 1:100 Area= 94msq No. 5200 $2388 1800 2400 45.00° reyn­olds archi­tec­ture Itd. 1 tul­loch street, ding­wall. IV15 9JY tel. 01349 867766 fax. 01349 867769 www​.reyn​olds​-archi​tec​ture​.com Descrip­tion NOTE- Plot 1 to be mirrored ver­sion of Plot 2 Date Drawn by Sec­tion thru entrance Scale 2019 021 – 050 1:100 Val­ley Con­struc­tion Ser­vices Hous­ing at Crom­dale Plans & sec­tions (Plots 1 & 2) 06.08.19 GIR 1:100

  1. Pro­tec­ted by copy­right, no repro­duc­tion without express per­mis­sion from architect.
  2. Con­tract­or is respons­ible for check­ing all dimen­sions pri­or to construction.
  3. Dis­crep­an­cies to be referred to archi­tect for decision.
  4. Must be read in con­junc­tion with writ­ten spe­cific­a­tion and engineers/​sub con­tract­ors con­struc­tion Information

Side 2 1:100 Side 1 1:100 Ver­tic­al tim­ber clad­ding Front 1:100 Nat­ur­al slate to plot 1 & 2 Etern­it fas­cias, slate grey White wet­dash Grey UPVC win­dows NOTE- Plot 1 to be mirrored ver­sion of Plot 2 0 1 2 3 4 5 Scale 1:100 @ A3 Meters Plan­ning issue reyn­olds archi­tec­ture Itd. 1 tul­loch street, ding­wall. IV15 9JY tel. 01349 867766 fax. 01349 867769 www​.reyn​olds​-archi​tec​ture​.com No. Descrip­tion A Elev­a­tions alter­a­tions Val­ley Con­struc­tion Ser­vices Hous­ing at Crom­dale Date 09.02.21 Elev­a­tions (Plots 1 & 2) Date 06.08.19 Drawn by GIR Scale 1:100 2019 021 – 051 Rear 1:100

  1. Pro­tec­ted by copy­right, no repro­duc­tion without express per­mis­sion from architect.
  2. Con­tract­or is respons­ible for check­ing all dimen­sions pri­or to construction.
  3. Dis­crep­an­cies to be referred to archi­tect for decision.
  4. Must be read in con­junc­tion with writ­ten spe­cific­a­tion and engineers/​sub con­tract­ors con­struc­tion Information

NOTE- Plot 1 to be mirrored ver­sion of Plot 2 Plan­ning issue reyn­olds archi­tec­ture Itd. 1 tul­loch street, ding­wall. IV15 9JY tel. 01349 867766 fax. 01349 867769 www​.reyn​olds​-archi​tec​ture​.com No. Descrip­tion A Elev­a­tions alter­a­tions Val­ley Con­struc­tion Ser­vices Hous­ing at Crom­dale Date 09.02.21 Extern­al views (Plots 1 & 2) Date 06.08.19 Drawn by GIR Scale 2019 021 – 052

  1. Pro­tec­ted by copy­right, no repro­duc­tion without express per­mis­sion from architect.
  2. Con­tract­or is respons­ible for check­ing all dimen­sions pri­or to construction.
  3. Dis­crep­an­cies to be referred to archi­tect for decision.
  4. Must be read in con­junc­tion with writ­ten spe­cific­a­tion and engineers/​sub con­tract­ors construction

000000000 3663- util­ity 2475 1200 coats 3800- 2635 1838 3300 Mas­ter en‑s dress­er 2638 st 2000 bath­room velux velux 3725 Mas­ter dress­er en‑s Bed­room 2 Bed­room 2 st 3081 3419 w/​r Bed­room 1 First floor 1:100 Area= 63msq st 1775 4100 Lounge Ground floor 1:100 Area= 66msq pock­et door w/​r 3150 Slid­ing door Slid­ing door 3800 Kitchen/​dining 7000 00 bo 100 100 Kitchen/​dining pock­et door coats st st bath­room velux w/​r Bed­room 1 w/​r Lounge st util­ity 2475 velux 2388 1800 2388 2400 Sec­tion thru kit­chen 1:100 1800 2400 40.00° 0 1 2 3 4 5 Scale 1:100 @ A3 Meters Plan­ning issue reyn­olds archi­tec­ture Itd. 1 tul­loch street, ding­wall. IV15 9JY tel. 01349 867766 fax. 01349 867769 www​.reyn​olds​-archi​tec​ture​.com No. Descrip­tion A Alter­a­tions Val­ley Con­struc­tion Ser­vices Hous­ing at Crom­dale Sec­tion thru entrance GI 1:100 Plans & sec­tions (Plots 3,4,5,6) Date 06.08.19 Drawn by GIR Scale 1:100 2019 021 – 040

  1. Pro­tec­ted by copy­right, no repro­duc­tion without express per­mis­sion from architect.
  2. Con­tract­or is respons­ible for check­ing all dimen­sions pri­or to construction.
  3. Dis­crep­an­cies to be referred to archi­tect for decision.
  4. Must be read in con­junc­tion with writ­ten spe­cific­a­tion and engineers/​sub con­tract­ors con­struc­tion Date 09.02.21

Side 2 1:100 Front 1:100 Rear 1:100 Π Π Side 1 1:100 Con­crete roof tiles 0 1 2 3 4 5 Etern­it fas­cias, slate grey Scale 1:100 @ A3 Meters White wet­dash Ver­tic­al tim­ber clad­ding Grey UPVC win­dows Plan­ning issue reyn­olds archi­tec­ture Itd. 1 tul­loch street, ding­wall. IV15 9JY tel. 01349 867766 fax. 01349 867769 www​.reyn​olds​-archi​tec​ture​.com Descrip­tion Date 09.02.21 No. A Alter­a­tions Val­ley Con­struc­tion Ser­vices Hous­ing at Crom­dale Elev­a­tions (Plots 3,4,5,6) Date Drawn by Scale 2019 021 – 041 06.08.19 GIR 1:100

  1. Pro­tec­ted by copy­right, no repro­duc­tion without express per­mis­sion from architect.
  2. Con­tract­or is respons­ible for check­ing all dimen­sions pri­or to construction.
  3. Dis­crep­an­cies to be referred to archi­tect for decision.
  4. Must be read in con­junc­tion with writ­ten spe­cific­a­tion and engineers/​sub con­tract­ors con­struc­tion Information

Plan­ning issue reyn­olds archi­tec­ture Itd. 1 tul­loch street, ding­wall. IV15 9JY tel. 01349 867766 fax. 01349 867769 www​.reyn​olds​-archi​tec​ture​.com No. Descrip­tion A Alter­a­tions Val­ley Con­struc­tion Ser­vices Hous­ing at Crom­dale Date 09.02.21 Extern­al views (Plots 3,4,5,6) Date 06.08.19 Drawn by GIR Scale 2019 021 – 042

  1. Pro­tec­ted by copy­right, no repro­duc­tion without express per­mis­sion from architect.
  2. Con­tract­or is respons­ible for check­ing all dimen­sions pri­or to construction.
  3. Dis­crep­an­cies to be referred to archi­tect for decision.
  4. Must be read in con­junc­tion with writ­ten spe­cific­a­tion and engineers/​sub con­tract­ors construction

2037 7= 1138 V/C 1800 1800 2388 2400 Sec­tion thru kit­chen 1:100 4800 Lounge Slid­ing door 4100 Util­ity Kitchen/​dining st 4000 st coats Ground floor 1:100 7000 00 bo ‑3200- 2388 1800 2400 40.00° Sec­tion thru entrance 1:100 1:100 velux 2000 1600 2635 en‑s dress­er velux 2462 2638 bath­room velux 3419 w/​r Bed­room 1 Area= 77msq 1:100 Area= 62 First floor 1538 3800 Mas­ter Bed­room 2 3281 st 3200 3675 40.00° Sec­tion thru lounge 0 1 2 3 4 5 Scale 1:100 @ A3 Meters No. A Alter­a­tions Plan­ning issue reyn­olds archi­tec­ture Itd. 1 tul­loch street, ding­wall. IV15 9JY tel. 01349 867766 fax. 01349 867769 www​.reyn​olds​-archi​tec​ture​.com Descrip­tion Date 09.02.21 Val­ley Con­struc­tion Ser­vices Hous­ing at Crom­dale Plans & sec­tions (Plots 7,8,9,10) Date Drawn by Scale 2019 021 – 030 06.08.19 GIR 1:100

  1. Pro­tec­ted by copy­right, no repro­duc­tion without express per­mis­sion from architect.
  2. Con­tract­or is respons­ible for check­ing all dimen­sions pri­or to construction.
  3. Dis­crep­an­cies to be referred to archi­tect for decision.
  4. Must be read in con­junc­tion with writ­ten spe­cific­a­tion and engineers/​sub con­tract­ors con­struc­tion Information

Front 1:100 Con­crete roof tiles Etern­it fas­cias, slate grey White wet­dash Ver­tic­al tim­ber clad­ding Grey UPVC win­dows Side 1 1:100 0 1 2 3 45 Scale 1:100 @ A3 Meters Plan­ning issue reyn­olds archi­tec­ture Itd. 1 tul­loch street, ding­wall. IV15 9JY tel. 01349 867766 fax. 01349 867769 www​.reyn​olds​-archi​tec​ture​.com Descrip­tion Date 09.02.21 No. A Alter­a­tions Rear 1:100 Side 2 1:100 Val­ley Con­struc­tion Ser­vices Hous­ing at Crom­dale Elev­a­tions (Plots 7,8,9,10) Date Drawn by Scale 2019 021 – 031 06.08.19 GIR 1:100

  1. Pro­tec­ted by copy­right, no repro­duc­tion without express per­mis­sion from architect.
  2. Con­tract­or is respons­ible for check­ing all dimen­sions pri­or to construction.
  3. Dis­crep­an­cies to be referred to archi­tect for decision.
  4. Must be read in con­junc­tion with writ­ten spe­cific­a­tion and engineers/​sub con­tract­ors con­struc­tion Information

Plan­ning issue reyn­olds archi­tec­ture Itd. 1 tul­loch street, ding­wall. IV15 9JY tel. 01349 867766 fax. 01349 867769 www​.reyn​olds​-archi​tec​ture​.com No. Descrip­tion A Alter­a­tions Val­ley Con­struc­tion Ser­vices Hous­ing at Crom­dale Date 09.02.21 Extern­al views (Plots 7,8,9,10) Date 06.08.19 Drawn by GIR Scale 2019 021 – 032

  1. Pro­tec­ted by copy­right, no repro­duc­tion without express per­mis­sion from architect.
  2. Con­tract­or is respons­ible for check­ing all dimen­sions pri­or to construction.
  3. Dis­crep­an­cies to be referred to archi­tect for decision.
  4. Must be read in con­junc­tion with writ­ten spe­cific­a­tion and engineers/​sub con­tract­ors con­struc­tion Information

Bins 1881 st 2.314 m² 2129 shower 2105. 2300 bath­room 4.603 m² w/​r 0.964 m² st 1.644 m² bed­room 3 8.138 m² 3377 bed­room 1 10.060 m² 3214 st 3130 w/​r 0.964 m² bed­room 1 10.060 m² st 1.644 m² w/​r 0.805 m² w/​r 0.805 m² bed­room 2 10.289 m² w/​r 1.031 m² 2410 2919 First floor 1:100 Air source heat pump patio 4300 shower 3.964 m² 2129 Lounge 16.503 m² Ground floor 1:100 Kitchen/​dining 16.507 m² 4300 3839 3838 7792 3627 st bed­room 2 10.289 m² bed­room 3 8.138 m² patio Air source heat pump, shower Lounge 16.503 m² 3.964 m² G $t 2.314 m² 00 00 ob 00 Kitchen/​dining 16.507 m² TOTAL GF AREA= 50.9 msq TOTAL FF AREA= 48.1 msq 3 bed, 5 per­son bath­room 4.603 m² w/​r 1.031 m² Bins 2401 2400 30.00° Typ­ic­al Sec­tion 1:100 0 1 2 3 4 5 Meters No. Scale 1:100 @ A3 Plan­ning issue reyn­olds archi­tec­ture Itd. 1 tul­loch street, ding­wall. IV15 9JY tel. 01349 867766 fax. 01349 867769 www​.reyn​olds​-archi​tec​ture​.com Descrip­tion Val­ley Con­struc­tion Ser­vices Hous­ing at Crom­dale Plans (Plots 11,12,13,14,17,18) Date Drawn by Scale 2019 021 020 06.08.19 GIR 1:100

  1. Pro­tec­ted by copy­right, no repro­duc­tion without express per­mis­sion from architect.
  2. Con­tract­or is respons­ible for check­ing all dimen­sions pri­or to construction.
  3. Dis­crep­an­cies to be referred to archi­tect for decision.
  4. Must be read in con­junc­tion with writ­ten spe­cific­a­tion and engineers/​sub con­tract­ors con­struc­tion Inform­a­tion Date

Front 1:100 Π Con­crete roof tiles Etern­it fas­cias, slate grey White wet­dash Grey wet­dash at corner Grey UPVC win­dows Hori­zont­al tim­ber clad­ding Side 1 1:100 0 1 2 3 4 5 Meters Scale 1:100 @ A3 Plan­ning issue reyn­olds archi­tec­ture Itd. 1 tul­loch street, ding­wall. IV15 9JY tel. 01349 867766 fax. 01349 867769 www​.reyn​olds​-archi​tec​ture​.com Descrip­tion Date 09.02.21 No. A Alter­a­tions Rear 1:100 Side 2 1:100 Val­ley Con­struc­tion Ser­vices Hous­ing at Crom­dale Elev­a­tions (Plots 11,12,13,14,17,18) Date Drawn by Scale 06.08.19 GIR 1:100 2019 021 021

  1. Pro­tec­ted by copy­right, no repro­duc­tion without express per­mis­sion from architect.
  2. Con­tract­or is respons­ible for check­ing all dimen­sions pri­or to construction.
  3. Dis­crep­an­cies to be referred to archi­tect for decision.
  4. Must be read in con­junc­tion with writ­ten spe­cific­a­tion and engineers/​sub con­tract­ors con­struc­tion Information

Plan­ning issue reyn­olds archi­tec­ture Itd. 1 tul­loch street, ding­wall. IV15 9JY tel. 01349 867766 fax. 01349 867769 www​.reyn​olds​-archi​tec​ture​.com Descrip­tion Date 09.02.21 No. A Alter­a­tions Val­ley Con­struc­tion Ser­vices Hous­ing at Crom­dale Extern­al views Plots (11,12,13,14,17,18) Date Drawn by Scale 2019 021 022 06.08.19 GIR

  1. Pro­tec­ted by copy­right, no repro­duc­tion without express per­mis­sion from architect.
  2. Con­tract­or is respons­ible for check­ing all dimen­sions pri­or to construction.
  3. Dis­crep­an­cies to be referred to archi­tect for decision.
  4. Must be read in con­junc­tion with writ­ten spe­cific­a­tion and engineers/​sub con­tract­ors con­struc­tion Information

Bins Air source heat pump st_​$2200 bath­room 4.631 m² w/​r 1.031 m² Future par­ti­tion for addtion­al single bed­room First floor 1:100 100 00 3104 Shw rm 4.140 m² st 2129 2400 1323 5529 patio 3300 21053214 bed­room 1 10.028 m² st 5444 bed­room 2 7792 Kitchen/​dining/​Lounge 33.672 m² Ground floor 1:100 3685 18.418 m² 3120 w/​r bed­room 1 10.028 m² st w/​r 1.150 m² st 1.150 m² Future door 3377 3377 Future door 5444 bed­room 2 Redund­ant Room patio Kitchen/​dining/​Lounge 33.672 m² TOTAL GF AREA= 48.4 msq TOTAL FF AREA= 45.2 msq st po 00 Shw rm 4.140 m² 2 bed, 4 per­son (Flex­ible to 3 bed 5 per­son) shower over st G bath­room 4.631 m² Future par­ti­tion for addtion­al single bed­room w/​r 1.03 m² Air source heat pump Bins 2401 2400 30.00° Typ­ic­al Sec­tion 1:100 0 1 2 3 4 5 Meters No. Scale 1:100 @ A3 Plan­ning issue reyn­olds archi­tec­ture Itd. 1 tul­loch street, ding­wall. IV15 9JY tel. 01349 867766 fax. 01349 867769 www​.reyn​olds​-archi​tec​ture​.com Descrip­tion Val­ley Con­struc­tion Ser­vices Hous­ing at Crom­dale Plans (Plots 15,16) Date 06.08.19 Drawn by GIR Scale 1:100 2019 021 025

  1. Pro­tec­ted by copy­right, no repro­duc­tion without express per­mis­sion from architect.
  2. Con­tract­or is respons­ible for check­ing all dimen­sions pri­or to construction.
  3. Dis­crep­an­cies to be referred to archi­tect for decision.
  4. Must be read in con­junc­tion with writ­ten spe­cific­a­tion and engineers/​sub con­tract­ors con­struc­tion Inform­a­tion Date
×

We want your feedback

Thank you for visiting our new website. We'd appreciate any feedback using our quick feedback form. Your thoughts make a big difference.

Thank you!