Item5Appendix2aConstructionSiteArea20200076DET
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Agenda Item 5 Appendix 2a 22/05/2020
AGENDA ITEM 5
APPENDIX 2a
2020/0076/DET
CONSTRUCTION METHOD STATEMENT PLANS CONSTRUCTION SITE AREA
COPYRIGHT The information contained in this drawing is the intellectual property of Balfour Beatty and must not be divulged to others or reproduced without their permission.
Location Plan Site Layout Plan
Main Site Compound Material Lay down area / Heli pad *Nominal Width of Construction Boundary — local deviation/micro-siting outwith this corridor for tracked plant where topography dictates
KEY Methodology Report Construction Boundary Existing Access Area of Permanent Remedial works
Site Plan Scale 1:2500 @ A0
Works area Balfour Beatty Material Lay down area and Heli pad Scale 1:1250 @ A0 TENDER DRAWING Cairngorms Funicular Repair Project Site Boundary