This document contains Scottish and Southern Electricity Networks (SSEN) Transmission's representation regarding planning application 2022/0069/DET for a battery energy storage facility near Boat of Garten. SSEN Transmission raises concerns about the proposed layout's potential impact on their existing underground cabling and the need to protect trees crucial for screening the nearby substation. They request that if the application is approved, a pre-commencement planning condition be included, requiring consultation with SSEN Transmission and approval for construction methods, access, landscaping, and tree planting to ensure the safety and operation of their infrastructure.