Item6Appendix1aPlans20200236DETand20200241LBC
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Agenda Item 6 Appendix la 26/02/2021
AGENDA ITEM 6
APPENDIX la
2020/0236/DET & 2020/0241/LBC
PLANS SUBMITTED WITH RENEWAL
Sinks MP 73.75 Pond Obelisk Memorial to Macpherson) Drain Graveyard Antainhead Dra B 9152 Raitts Burn Balavil Cottag Path (um) Sinks Mains of Balavil Subway 224.3m Railway Cottage Track Path (um) B 9152 MP 74 Balavil Π Π Path (um) Π Pond 223.4m Drain Lay-by 223 North Point 7 Drawn DM Checked by Date 10.09.20 Scale 1:2,500 Original Size A3 Project Mains of Balavil Ecological Updates Client Balavil Estate Ltd Title Location Plan Copyright Acknowledgement Ordnance Survey Crown Copyright 2020. All rights reserved. Quality Assurance UKAS 005 Quality Assurance ISO 9001:2008 Ironside Farrar Environmental Consultants Environmental Planners CivilEngineers Landscape Architects GraphicDesign 111 McDonald Road EDINBURGH EH7 4NW Tel. 0131 550 6500 Fax. 0131 557 6723 mall@Ironsidefarrar.com offices also In GLASGOW & MANCHESTER Drawing No. 50679⁄101 Revision 0 20 50 100 200m Licence No. AL100017966. SGS Certificate GB02/54539