Skip to content
Please be aware the content below has been generated by an AI model from a source PDF.

Item6Appendix1Plans20190347DET

CAIRNGORMS NATION­AL PARK AUTHOR­ITY Plan­ning Com­mit­tee Agenda Item 6 Appendix 1 13/12/2019

AGENDA ITEM 6

APPENDIX I

2019/0347/DET

PLANS

LOWER SIDE FLOW SPLASH STONES TRACK SILT TRAP PLAN VIEW TWIN WALLED PIPE 450/600MM TRACK SPLASH STONES SEC­TION­AL VIEW ALONG PIPE DRAIN­AGE CHANNEL/ PAR­AL­LEL BOR­ROW PIT. Λ SILT TRAPTWIN WALLED PIPE 450/600MM 0 FLOW UPPER SIDE RE LAID TURES ROAD CROSS­ING CUL­VERT FROM PAR­AL­LEL BOR­ROW PIT/ DRAIN­AGE CHAN­NEL 2 3 4 5 6 SCALE IN METRES 1:50

Π 0 Do Π Cre­ag Bhalg Cre­ag­bui Wood­land Croft­car­noch Plant­a­tion N Track Sections

  1. Croft­car­noch — 1700m Note — all dis­tances are approx­im­ate 1504 ARCHI­TEC­TUR­AL & BUILD­ING CON­SULTANCY Cli­ent: Bish­ops Well Cot­tage, Dal­guise, Dunkeld, Perth­shire, PHB OJX email:dmartin1504@gmail.com tel:07740373820 Bal­avil Estate Pro­ject: Con­struc­tion of Forest/​Woodland Access Tracks Address: Bal­avil Estate, Kin­gussie, Inver­mess-shire Dwg Title: Site Plan Scale: 1:7500 Dwg Deals: Oct 2019 plan­ning 150 300 450 600 750 SCALE IN METRES 1:7500

UPPER SIDE EXCAV­ATED SHALLOVY BOR­ROW PIT/DRAINAGE 2M CHAN­NEL PLACED TURE NEN ONSITE MATER­I­AL — CENTRE CAM­BER 3M REPLACED TURF SEED MIX REPLACED TURE IM ORI­GIN­AL TRACK SUR­FACE PLACED TURF LOWER VAL SIDE TYP­IC­AL CON­STRUC­TION LAY­OUT FOR REPAIR­ING TRACKS INC. SHAL­LOW BOR­ROW PITS. 0 1 2 3 4 SCALE IN METRES 1:50 56

B Bal­avil A Plan Ref 1 — 27th Novem­ber 2019

×

We want your feedback

Thank you for visiting our new website. We'd appreciate any feedback using our quick feedback form. Your thoughts make a big difference.

Thank you!