Item6Appendix1Plans20230267DETDistilleryLaggan
Cairngorms Item 6 Appendix 1 10 November 2023 National Park Authority Üghdarras Pàirc Nàiseanta a’ Mhonaidh Ruaidh
Agenda item 6
Appendix 1
2023/0267/DET
Plans
100 scale in metres 1:2500 Site Location Plan 1:2500 Π Dubh 281.9m Drain Pond Well rack Site Location Plan 1:1250 50 scale in metres 1:2500 260.9m 0 Bruach Mhór River Spey St Michael’s Chapel (site of) Burial Ground (disused) 258.5m DODO DO 100000 000000 DIST GENERAL WADE’S MILITARY ROAD TRACKY Dail na Ceardaich n OS/OB Speyside Distillers Dalchully Estate Laggan PH20 1BU 0125.PL.001 Site Location Plans PLANNING olli 3 May 23 As Noted@A0 blair architects volliblair.co.uk olli@olliblair.co.uk +44 (0)7500 601940
Landscape GA Plan Scale 1:1000 00000 ivate access road Road to Laggan River Spey Softworks Legend Refer to planting plan erz/22 36/P05 Meadow Species rich grassland across the site Wildflower meadow to entrance roads and spaces Shrub/herbaceous planting A mix of biodiverse species as a field layer at key spaces Hedges 1.2m tall hedging Wetland planting To ditches, swales, basins and Water bodies vetlands SuDS pond, cooling pond and existing pond Existing coniferous plantation retained 00 Existing coniferous plantation removed Existing Birch riparian woodland retained Extends with Spey Proposed woodland planting See planting plan for species specification Specimen trees Semi mature tree planting Wider landscape trees Semi mature tree planting Avenue trees Semi mature tree planting Existing rock outcrop Hardworks Legend Asphalta roads Insitu concrete surfacing Resin bound gravel paths and parking Self binding gravel wider landscape paths Natural stone paving To entrance spaces at marketing suite and distillery Natural stone sett paving To key points along access road and along General Wades Road Grasscrete To edge of access road and fire access routes Steps Stone steps on wider landscape path Deck Suspended steel access deck to marketing suite with balustrade Boundaries& Furniture Legend ‑13 Natural stone walls to match building Entrance wall 1m high Wall at office 1.5m high Deer Fencing 2.0m high stock fence on timber posts Double leaf gate 1.5m high steel gate, vertical bar. 3.7m wide Timber benches 3no. Cycle stands 9no.
- Bin store: Timber gate to front
- Low stone wall with integrated signage
- Visitor entrance space with drop off bay and visitor grasscrete parking bays set in woodland. Steps down onto lower field path with adjacent terraced cascade
- Path to Spey and field drain/linear wetland: See erz 22 36 S03 for further detail
- Marketing suite: Refer to Architect’s information
- Access bridge over General Wades Road Refer to Architect’s information
- Distillery Refer to Architect’s information
- SuDS pond with overflow to wetland to south Overhead cables
- Cooling pond with wetland overflow
- Cooling tower Refer to Architect’s information
- Power house Refer to Architect’s information
- Inground fuel tanks with standoff and access path
- Mounding adjacnet to cooling pond to assist with visual screening
- Sprinkler tanks ec Limited 21 James Montson Street www.erastudio.co.uk TF:0141 552 0888 Al dimensions are to be 28/04/2 18/09/2023 Warehouse and Subs Refer to Engineer’s information
- Pipie bridge Refer to Engineer’s information Speyside Distillery
- Warehouses Refer to Architect’s information
- Tank Refer to Engineer’s information
- Office Refer to Architect’s information
- SuDS basin planted with wetland margins PLANNING
- Swale 1:1000 @ A1
- Existing pond/wetland New check damn at outlet to manage water flow
- 2no. EV Charging bays
- Bike shelter 19/09/2023
amendm dat comment 22.09.23 Bridge level amended/distillery height raised 0.55m AH Marketing Suite North West Sectional Elevation EE Marketing Suite South West Sectional Elevation FF 0 2 3 scale in metres 1:50 10 ③ ⑦ ① ① 2 ② 1. Black Metal Standing Seam cladding
- Russwood Thermopine Timber Planks on edge or posts with Sioo mid tone grey finish. (Timber Planks 75 x 50mm with 95mm gaps for Balustrades, Louvres 75 x 32mm, cladding 75 x 20mm with 8mm gaps)
- Russwood Thermopine Planks or Louvres on Edge with Black Matt finish. (Timber Planks 75 x 32mm with 95mm gaps for vertical planks, horizontal louvres across windows 150 x 50mm with 125mm gaps).
- Galvanised steel walkway grating 5. Galvanised steel tubular structures
- Black Matt Alu-clad Windows & Doors 7. Frameless Curtain walling glazing system.
- Woodburning stove flue, black matt finish. client Speyside Distillers Ltd project New Distillery Dalchully drawing number 0125.PL.303 drawing title Marketing Suite NW & SW Elevations PLANNING a drawn by AH Laggan checked by OB riba work stage 3 date May 23 scale/original sheet size 1:50@A1 olli blair architects Ltd. Check all dimersions on site before work is undertaken. All goods, materials and workmanship to conform with cument building regulations, BSS and COP’s olli blair architects www.olliblair.co.uk olli@olliblair.co.uk +44 (0)7500 601940 company no. SC623834 Olli Blair Architects Ltd trading as olliblairarchitects reg address: Robertson House Shore Street Inverness IV1 1NF
Proposed North Elevation 1:100 Proposed West Elevation 1:100 H ① Proposed South Elevation 1:100 comment 28.05.23 Minor amendments 28.08.23 dotted line added showing the building raised by 550mm 22.09.23 Ridge & bridge height raised; materials consolidated 19 D
- Black Metal Standing Seam cladding 2. Black Sinusoidal metal roofing
- Balustrade formed with Russwood Thermopine 4 Timber Planks on edge or posts with Sioo mid tone grey finish.. Russwood Thermopine Louvres with Black Matt finish.
- Galvanised steel walkway grating 6. Galvanised steel tubular structures
- Black Matt Alu-clad Windows/Doors / Rooflights
- Black Aluminium Sills 9. Frameless Curtain walling glazing system.
- Stone Mix (type & colour to be agreed).
- Matt Black Aluminium half round gutters and downpipes to match roofing colour.
- Galvanised Metal vent grille.
- Matt Black metal louvred vents and metal doors with integrated metal vents.
- Timber Doors with Sioo mid tone grey finish.
- Boiler Flue, Black Matt finish.
- Not Used
- Lime harling ① ① COOLING TOWER (SHOWN INDICATIVE) 11 Π ⑧ Proposed East Elevation 1:100 D 25 scale in metres 1:100 5 7.5 10 Note: All Equipment sizes and specification provided by Charles Scott & Partners client drawing number Speyside Distillers Ltd 0125.PL.301 project drawing title C New Distillery Distillery drawn by Dalchully Elevations AH/OB Laggan PLANNING checked by OB riba work stage 3 date May 23 scale/original sheet size 1:100 @A1 olli blair architects Ltd. Check all dimersions on site before work is undertaken. All goods, materials and workmanship to conform with curent building regulations, BSS and COP’s qulations, BSS and COP’s olli blair architects www.olliblair.co.uk olli@olliblair.co.uk +44 (0)7500 601940 company no. SC623834 Oli Blair Architects Ltd trading as olliblairarchitects reg address: Robertson House Shore Street Inverness IV1 1NF auth.
South West Elevation North East Elevation ⑦ 4
- Russwood Thermopine cladding with matt black paint finish.
- Black Metal Sinusoidal Sheet Roofing
- Natural Stone mix 4. Black Matt Alu-clad Windows & Doors
- Black Metal half round gutters and down pipes.
- Photovoltaics indicative only be specialist designed.
- Woodburning stove flue, black matt finish. ① ② ① 9 4 ② South East Elevation North West Elevation ⑦ ② ② ⑤ 4 4 ① ⑦ ⑦ Suite 2 Meeting Section A‑A 0 1 scale in metres 1:50 amendments rev. date comment 22.09.23 Job number corrected & drawing titles corrected client Speyside Distillers Ltd project New Distillery Dalhully drawing number 0125.PL.307 drawing title Office Section AA & Elevations PLANNING a 2 10 drawn by OB Laggan checked by AH riba work stage 3 date May 23 scale/original sheet size 1:50@A1 olli blair architects Ltd. Check all dimersions on site before work is undertaken. All goods, materials and workmanship to conform with cument building regulations, BSS and COP’s olli blair architects www.olliblair.co.uk olli@olliblair.co.uk +44 (0)7500 601940 company no. SC623834 Olli Blair Architects Ltd trading as olliblairarchitects reg address: Robertson House Shore Street Inverness IV1 1NF
Proposed North Elevation (Warehouse No.1) 1:100 0 Proposed South Elevation (Warehouse No.1) 1:100 Proposed East Elevation (Warehouse No.1) 1:100 Proposed West Elevation (Warehouse No.1) 1:100 2.5 scale in metres 1:100 7.5 10 date comment 21.09.23 door relocated and steel amended, lean-to pitch reduced 1. Black box profile insulated cladding
- Black roller shutter doors
- Black louvred metal vents client Speyside Distillers Ltd project a New Distillery drawn by Dalchully OB/AH Laggan checked by AH riba work stage olli 3 drawing number 0125.PL.305 drawing title Warehouse No. 1 Elevations PLANNING date May 23 scale/original sheet size 1:100@A1 olli blair architects Ltd. Check all dimer sions on site before work is undertaken. All goods, materials and workmanship to conform with curent building regulations gulations, BSS and COP’s blair architects www.olliblair.co.uk olli@olliblair.co.uk +44 (0)7500 601940 company no. SC623834 Oli Blair Architects Ltd trading as olliblairarchitects reg address: Robertson House Shore Street Inverness IV1 1NF auth.
Location of Access Road Upgrade / Resurfacing Works at Start of Access Track Scale 1:2500 Location of Proposed Track Upgrade Works Extent of Access Road Upgrade / Resurfacing Works Scale 1:200 MINIMUM 2000 Typical Speed Bump Layout and Section Scale 1:25 50.0m Legend:- Extent of Existing Bitmac Surfacing Shown Thus Extent of Proposed Bitmac Construction Speed Bump 259.09 2.5% STANDARD CONSTRUCTION COMBINED BASE & GEOGRID BINDER Typical Road Construction Scale 1:25 & SUB-BAS Typical Road Surfacing Tie In Detail Scale 1:25 PLANNING CHARLES SPEYSIDE DISTILLERY SCOTT PARTNERS LAGGAN NEWTOWNMORE PH20 1BU NEW DISTILLERY AND MATURATION SITE Venlaw Building ACCESS ROAD UPGRADE WORKS 9070 C037