Skip to content
Please be aware the content below has been generated by an AI model from a source PDF.

Item6Appendix1PlansGlenRoadTrack20220421DET

Cairngorms Item 6 Appendix 1 28 April 2023 Nation­al Park Author­ity Ügh­dar­ras Pàirc Nàiseanta a’ Mhon­aidh Ruaidh

Agenda item 6

Appendix 1

2022/0421/DET

Plans

Cre­ag na bolaire Ban­chor Creng in Lon Cre­ag nan Abhag 68 Cre­agan Dearg Ah Stac 800500N 800000NLOC­A­TION PLAN (NTS) 799500N GLEN ROAD All Cha MIDDLE ROAD 0 MIDDLE ROAD BRIDGE GLEN ROAD 2700000 DOG TRI­AL ROAD Pa GLEN­BAN­CHOR ROAD DOG TRI­AL AL ROAD ROAD Hut Circle 0 2705000 Circle GLEN­BAN­CHOR ROAD STRONE ROAD 801500N 0 Path (um) 0 GLEN­BAN­CHOR ROAD A86 MAIN STUDE 801000N B00500N 800000N 799500N EXIST­ING BAL­LO­CHROAN COR­RIE ROAD EXIST­ING BOR­ROW 2726125 801243M Hut Cirde Do not scale from this draw­ing. SAFETY HEALTH AND ENVIR­ON­MENT­AL INFORM­A­TION IN ADDI­TION TO THE HAZARD/RISKS NOR­MALLY ASSO WITH OF TYPES OF WORK DETAILED ON THIS DRAW­ING NOTE THE FOL­LOW­INGE AND INFORM­A­TION. RISKS RISKS USTED HERE ARE NOT EXHAUST­IVE, REFER TO DESIGN ASSESS­MENT CON­STRUC­TION: DEMOLI­TION: FOR INFORM­A­TION RELAT­ING TO USE, CLEAN­ING AND MAIN­TEN­ANCE SEE THE HEALTH AND SAFETY FILE. IT IS ASSUMED THAT ALL WORKS WILL BE CAR­RIED OUT BYCOM­PET­ENT STATE­MENT. NOTES: WORK­ING, IG, WHERE APPRO­PRI­ATE, TO AN APPROVED METHOD

  1. ORD­NANCE SUR­VEY, © CROWN COPY­RIGHT 2018. ALL RIGHTS RESERVED. LICENCE NUM­BER 100022432. LEGEND EXIST­ING BIT­MAC ROA EXIST­ING UNSUR­FACED EXIST­ING GRAVEL TRACK EXIST­ING RIVER/POND ODLAND AREA BOUND­ARY PRO TRACK ABAN­DONED OPOSED TRACK IST­ING BOR­ROW 50m 100m 150m 200m 250m SCALE 1:5000 FAIRHURST PIT­MAIN & Tel: 01483 724 544 GLEN­BAN­CHOR LTD. Pro­ject PIT­MAIN & GLEN­BAN­CHOR ESTATE FORESTRY EXTRAC­TION NEW­TON­MORE SITE LOC­A­TION PLAN GLEN ROAD & GLEN­BAN­CHOR ROAD TO BAL­LO­CHROAN COR­RIE ROAD 1:5000 PLAN­NING DE 21/11/2022 21/11/2022 21/11/2022 143146045

802000N 301500N Drain Caim B01000N B00000N Lurg wnship 45M4M PASSING PLACE (DRY BOUND FIN­SH) Chao Car Park 308 EXIST­ING MIDDLE ROAD SHEET 2 Jen­ba Roa 45M5M PASSING RACE (DRY BOUND FIN­ISH CAR­RIAGE­WAY TO BE REALIGNED REPLACE­MENT BRIDGE CON­STRUC­TED. Hut Circle River 45M4M PASSING PLACE (DR BOUND ANSH 300569 2695 45M4M PASSING PLACE (DRY BOUND FIN­ISH) Town­ship Town­ship 0 Hut Circle SHEET Cre­ag Bheag Cre­ag Bheag Path (um) EXIST­ING DOG TRI­AL ROAD SHEET 1 Shingle 45M4M PASSING PLACE (DRY BOUND FIN­SH) 45M4M PASSING 270000E PLACE (DRY BOUND FIN­ISH Shingle Shin rack Town­ship Ford Path (um) Path (um) Grouse Butts Pond Caochan n Bualle Duche Glen­ban­chor 298.7 500円 Ο Hut Circles Ford SHEET 4 Path (um) Ford Path (um) Shiel­ings 295.0m 89 Farm­steads Ris Ponds Allt na Loinne Buidhe Wed 271000E Water Path (um) Water Col­lects Col­lects Cot Ban sgadh SHEET 5 EXIST­ING BAL­LO­CHROAN COR­RIE ROAD SHEET 6 Ponds Path (um) (um) Pond Path (um) Path (um) Path (um) Ford Fords 0 0 50m 100m 150m 200m 250m SCALE 1:5000 271500E Track Ford Step­ping Stones Path (um) Path (um) Dam 00 B Ford Hut Circle EXIST­ING STRONE ROAD Reser­voir (covered) Da FB 72000E Sheep Pens Step­ping Pords EXIST­ING BOR­ROW PIT 272612E 801249N NH7201SE 272500E N Farm­stead Grouse Butts Do not scale from this draw­ing. SAFETY HEALTH AND ENVIR­ON­MENT­AL INFORM­A­TION IN ADDI­TION TO THE HAZARD/RISKS NOR­MALLY ASSO­CI­ATED WITH THE TYPES OF WORK DETAILED ON THIS DRAW­ING, NOTE THE FOL­LOW­ING RISKS AND INFORM­A­TION. RISKS LIS­TED HERE ARE NOT EXHAUST­IVE REFER TO DESIGN ASSESS­MENT FORM CON­STRUC­TION: DEMOLI­TION: FOR INFORM­A­TION RELAT­ING TO USE, CLEAN­ING AND MAIN­TEN­ANCE SEE THE HEALTH AND SAFETY FILE. IT IS ASSUMED THAT ALL WORKS WILL BE CAR­RIED OUT BYCOM­PET­ENT CON­TRACT­OR WORK­ING, WHERE APPRO­PRI­ATE, TO AN APPROVED METH­OD STATE­MENTNOTES:

  1. ORD­NANCE SUR­VEY, © CROWN COPY­RIGHT 2018. ALL RIGHTS RESERVED. LICENCE NUM­BER 100022432
  2. TOPO­GRAPH­IC­AL & UAV SUR­VEY BY CAINTECH SEPTEM­BER 2021.
  3. CO-ORDIN­ATES ARE TO NATION­AL GRID (GPS NET­WORK) & LEVELS ARE IN METRES AND ARE TO ORD­NANCE DATUM.
  4. REFER TO DRAW­INGS NO. 143146÷012017 FOR SHEETS NO. 1 – 6.
  5. DESIGN TO BE UPDATED AND FINAL­ISED WITH GROUND INVEST­IG­A­TION INFORMATION.
  6. SUP­PLE­MENT­ARY TOPO­GRAPH­IC­AL & UAV SUR­VEY BY PALS AUGUST 2022.
  7. EXIST­ING BOR­ROW PIT ORD­NANCE SUR­VEY CO-ORDIN­ATES: 272612E 801249N & NATION­AL GRID REF­ER­ENCE: NH7201SE. LEGEND EXIST­ING BIT­MAC ROAD EXIST­ING UNSUR­FACED ROAD EXIST­ING GRAVEL TRACK EXIST­ING RIVER/POND BOUND­ARY PRO­POSED TRACK PRO­POSED TRACK ROUTE ABAN­DONED EXIST­ING BOR­ROW PIT22.09.22 GLEN­BAN­CHOR ROAD TO BAL­LO­CHROAN COR­RIE ROAD EXTRAC­TION TRACK ROUTE MW DE DE AMENDED BETWEEN BETWEEN CH49OM-2302m. RED LIME BOUND­ARY REVISED/ADDED GLEN­BAN­CHOR ROAD PASSING PLACES AMENDED. 21.12.21 SCALE BAR ADDED PRO­POSED EXTRAC­TION TRACK ROUTE & DESIGN DE 08.12.21 2NO. PASSING PLACES, CAR­RIAGE­WAY REALIGN­MENT & REPLACE­MENT BRIDGE ADDED AS INSTRUC­TED BY CALE­DO­NI­AN BUILD­ING SUR­VEY­ORS LTD. Rev. Date Descrip­tion Drwm. Chkd. Appd. Cli­ent: FAIRHURST PIT­MAIN & Elive House GLEN­BAN­CHOR LTD. ech­wood Busi­ness Park INVERNESS IV2 38W Tel: 01463 724 544 Fax: 0844 381 4412 Dare Pro­ject Tibilec PIT­MAIN & GLEN­BAN­CHOR ESTATE FORESTRY EXTRAC­TION TRACK NEW­TON­MORE Draw­ing Title: PRO­POSED TRACK LAY­OUT & LOC­A­TION PLAN GLEN­BAN­CHOR ROAD TO BAL­LO­CHROAN COR­RIE ROAD Crag­gan Scale at A1: Status: 1:5000 PLAN­NING Draw Checked: Approved: Crof­troy MW DE DE New­ton­more Date: Date: Date: 22/11/2021 24/11/2021 Nuide 24/11/2021 Blal­laid Ban­chor Mains Draw­ing No.: Revi­sion: LOC­A­TION PLAN (NTS) 143146011 C
×

We want your feedback

Thank you for visiting our new website. We'd appreciate any feedback using our quick feedback form. Your thoughts make a big difference.

Thank you!