Item6Appendix2CumulativeZTVCraigWatch20220217PAC
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Agenda Item 6 11/11/2022
AGENDA ITEM 6
APPENDIX II
CRAIG WATCH WIND FARM
CUMULATIVE ZTV
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Agenda Item 6 11/11/2022
Appendix II — extract of applicant’s ER Figure 5.7b, cumulative ZTV for the proposed Craig Watch wind farm plus existing and consented wind farms
[Image of a map with a key that contains the following items: Study Area (45km), 10 km Radius Interval from Outer Turbines, Proposed Turbines, Viewpoint Location, Council Boundary, Cairngorms National Park, Operational and Consented Turbines, Zones of Theoretical Visibility. The map also contains the following text: Ardoch Fair, WindFarm, Moray, Highland, Aberdeen City, Extension, And, Cole, Hill, Aberdeenshire, Land to the Easterton.]