Item6GarbetWindFarm20210039PACAppendix2
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Agenda Item 6 23/04/2021
AGENDA ITEM 6
APPENDIX II
GARBET WIND FARM
CUMULATIVE ZTV
Appendix II — applicant’s cumulative ZTV for the proposed Garbet wind farm plus existing and consented wind farms
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Agenda Item 6 23/04/2021
[Map image with wind turbine locations, landscape area, local authorities, distance lines, national park, existing wind farms, Garbet wind farm visibility, and cumulative visibility]
Key:
- Proposed turbine locations
- Landscape and Visual Study Area
- Local authority boundaries
- Lines indicating the distance from the proposed turbine locations
- Cairngorms National Park
- Existing/consented wind farms may be theoretically visible
- Garbet wind farm may be theoretically visible
- Garbet and existing/consented wind farms may be theoretically visible
Notes: This drawing is based on a computer generated Zone of Theoretical Visibility (ZTV). The areas shown indicate the maximum theoretical visibility of the proposed turbines using OS Terrain 50 data only and do not take account of any screening from vegetation or built-form. The ZTV also includes an adjustment that allows for the Curvature and Light Refraction of the Earth.
This figure has been based on the following parameters:
- Turbine layout file: LGARBETHILL007.WFL
- Hub height: 112.5m
- Rotor diameter: 155m
- Height to blade tip: 190m
For cumulative wind farm codes please see Figure 6.12.
[Scale bar]
EnergieKontor
Garbet Wind Farm EIA Report
Cumulative ZTV — Garbet with all existing and consented wind farms
February 2021
wood. 41917-WOOD-XX-02-FG-L-0011-S3_R1
page 1 of 2