Item7Appendix1CumulativeZTVCloiche20200121PAC
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Agenda Item 7 11/11/2022
AGENDA ITEM 7
APPENDIX I
CLOICHE WIND FARM
PROPOSED WIND FARM CUMULTIVE EFFECTS WITH CONSENTED AND OPERATIONAL WINDFARMS
Appendix I — applicant’s figure, ZTV cumulative baseline
[Image of map with wind farm locations and boundaries]
Key sse Renewables ash CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Agenda Item 7 11/11/2022
Site Boundary 29 Turbine Proposed Development Turbine 40km Wider Study Area 20km Detailed Study Area 5km Distance Radii Cairngorms National Park Boundary (CNP) Cumulative Baseline Sites Operational/Under Construction Turbine Consented Turbine Application Turbine Scoping Turbine
Figure 3.6 Cumulative Sites included within the Assessment
Cloiche Wind Farm Additional Information