Skip to content
Please be aware the content below has been generated by an AI model from a source PDF.

Item7Appendix1CumulativeZTVCloiche20200121PAC

CAIRNGORMS NATION­AL PARK AUTHOR­ITY Plan­ning Com­mit­tee Agenda Item 7 11/11/2022

AGENDA ITEM 7

APPENDIX I

CLOI­CHE WIND FARM

PRO­POSED WIND FARM CUMUL­TIVE EFFECTS WITH CON­SEN­TED AND OPER­A­TION­AL WINDFARMS


Appendix I — applicant’s fig­ure, ZTV cumu­lat­ive baseline

[Image of map with wind farm loc­a­tions and boundaries]

Key sse Renew­ables ash CAIRNGORMS NATION­AL PARK AUTHOR­ITY Plan­ning Com­mit­tee Agenda Item 7 11/11/2022

Site Bound­ary 29 Tur­bine Pro­posed Devel­op­ment Tur­bine 40km Wider Study Area 20km Detailed Study Area 5km Dis­tance Radii Cairngorms Nation­al Park Bound­ary (CNP) Cumu­lat­ive Baseline Sites Operational/​Under Con­struc­tion Tur­bine Con­sen­ted Tur­bine Applic­a­tion Tur­bine Scop­ing Turbine

Fig­ure 3.6 Cumu­lat­ive Sites included with­in the Assessment

Cloi­che Wind Farm Addi­tion­al Information

×

We want your feedback

Thank you for visiting our new website. We'd appreciate any feedback using our quick feedback form. Your thoughts make a big difference.

Thank you!