Item7Corriegarth220210050PACAppendix2
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Agenda Item 7 23/04/2021 AGENDA ITEM 7 APPENDIX II CORRIEGARTH 2 WIND FARM CUMULATIVE ZTV Appendix II — applicant’s ER Figure 6.10b, cumulative ZTV for the proposed Corriegarth 2 wind farm plus existing and consented wind farms CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Agenda Item 7 23/04/2021
BayWa r.e.
LUC ARCUS
Development boundary Existing Corriegarth turbine location Corriegarth 2 turbine location 5 km intervals from outermost turbines 40 km from outermost turbines Wind farms (by status)
Operational Under Construction
Consented Cumulative ZTV — Operational and Consented Wind Farms and Corriegarth 2 Other wind farms (not Corriegarth 2) visible Only Corriegarth 2 visible Corriegarth 2 and other wind farms visible
Cairngorms National Park Each ZTV is calculated to turbine tip height from a viewing height of 2m above ground level. The ZTV extents for all windfarms are based on SNH guidance (Visual Representation of Windfarms, SNH, 2017). The terrain model assumes bare ground and is derived from OS Terrain 5 height data. Earth curvature and atmospheric refraction have been taken into account. The ZTV was calculated using ArcMap 10.5.1 software.
1:315,000 Scale @ A3 0 6 12 km NORTH
Produced By: JN Ref: 10792 – 6.10b Date: 16/02/2021 Checked By: DW Cumulative Zone of Theoretical Visibility (CZTV) Operational and Consented Wind Farms and Corriegarth 2 Figure 6.10b
Corriegarth 2 Wind Farm EIA Report