CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Agenda Item 8 Appendix 1 21/02/2020
AGENDA ITEM 8
APPENDIX I
2019/0215/DET
PLANS
TO AVIEMORE M 0 10 20 30 40 50 Ft 0 30 60 90 120 150 1:1250
KEY Site Boundary Land Ownership of Reidhaven Trust Land Ownership of BSW Timber
U2191 Deshar Road C1128 BOAT OF GARTEN LOCATION PLAN NTS TO GRANTOWN-ON-SPEY Sowmelf 224.3m TO AVIEMORE 224.0m A 95 TO GRANTOWN-ON-SPEY → C1128 Tigh Mhuileann 219.8m River Spey FOR PHASE 3 REFER TO SEPARATE PLANNING APPLICATION SITE BOUNDARY PHASES 1 & 2; REFER TO PLANNING REF. 19/0279/FUL Silo C1128 C1128 8970 BLOCK PLAN 1:1250 Notes:
- Do not scale from drawings. All dimensions to be confirmed on site prior to construction.
- Roderick James Architects LLP to be notified of any discrepancies before construction continues.
- These drawings are the copyright property of Roderick James Architects LLP.
- All Roderick James Architects LLP drawings to be read in conjunction with the proposed building notes, oak framing drawings and the structural engineers drawings and specification.
- This document should only be used for the purpose indicated by the drawing status below. ♡ OVERHEAD POWER LINE — TO BE REMOVED IN 2020 El Sub Sta BSW TIMBER SAWMILL WB 213.1m TO BOAT OF GARTEN B revision 11/11/2019 date Revised for planning details chk’d by drawing status Planning project Boat of Garten Roderick James Architects LLP Housing Development DISCOVERY HOUSE STEAMER QUAY RD TOTNES DEVON TQ9 5AL tel: 01803 868000 fax: 01803 864475 email: totnes@rjarchitects.co.uk client BSW Timber & Reidhaven Trust scale 1:1250 at A3 date June 2019 drawing drw’n by Location Plan NS chk’d by Phases 1 & 2 PS drawing number revision BSW_3_001 B
224.3m PLANNING HISTORY: DASHED RED LINE SHOWS BOUNDARY OF EXISTING PLANNING IN PRINCIPLE APPLICATION, DATED 19TH JUNE 2018, REF 18/02776/PIP. WITHDRAWN IN AUGUST 2018 TO ALLOW TIME FOR COMMUNITY COUNCIL AND CNP CONSULTATION PRE-APP ENQUIRY NOVEMBER 2018, MADE AT REQUEST OF CAIRNGORM NATIONAL PARK PLANNING DEPARTMENT, TO INCLUDE PROVISION FOR POTENTIAL FUTURE PHASE 3 DEVELOPMENT, FULL PLANNING APPLICATION JUNE 2019, SITE LAYOUT AMENDED TO SUIT PRE-APP RESPONSE: AMOUNT AND DENSITY OF HOUSES REDUCED LAYOUT ON SITE UPDATED IN LINE WITH DETAILED SITE SURVEY. PHASE 2: 1No SEMI-DETACHED (3÷4 BED) AND 4NO DETACHED HOUSES (2−4 BED) WASTE & RECYCLING COLLECTION POINT B PHASE 1: 1No SEMI DETACHED (3÷4 BED) AND 1NO DETACHED (2−4 BED) EXISTING EMBANKMENT AND TREES TO BE RETAINED AND ENHANCED ADOPTED ROAD Q 10 20 30 40 M 40 80 120 Ft 1:1000 PROPOSED MASTERPLAN 1:1000 PHASE 3: 3No DETACHED HOUSES NEW LANDSCAPING AND PLANTING TO SCREEN HOUSES FROM A95 PHASE 3; REFER TO SEPARATE PLANNING APPLICATION 19⁄0245 TOP OF BANK TURNING HEAD FOR SERVICE VEHICLES EXISTING HOUSE DEMOLISHED 219.8m MAINTAIN TREES TO SITE BOUNDARY AS BUFFER ZONE ACCESS POINT ALTERED AND ADDITION OF SERVICE BAY EXISTING ENTRANCE TO BSW TIMBER SEALED OFF; EXISTING TREES TO BE REMOVED AND REPLANTED ON SITE EXISTING ACCESS POINT TO HOUSE SEALED UP A PRIVATE TRACK PHASE 1⁄2; REFER TO PLANNING REF. 19/02729/FUL BSW TIMBER PATH LINK TO SAWMILL, REF ENGINEER’S DETAILS 10m x 25m SOAKAWAY FIELD FOR POPULATION EQUIVALENT OF 50 PEOPLE PROPOSED DRAINAGE STRATEGY TO BE NEW SEPTIC TANK/SOAKAWAY AND SUDS SYSTEM FOR SURFACE WATER, REFER TO CIVIL ENGINEER AND LANDSCAPE ARCHITECT DRAWINGS FOR DETAILS CORE PATH LINK TO BOAT OF GARTEN: EXACT ROUTE OF PATH TO BE CONFIRMED WITH SEPARATE PLANNING APPLICATION OVERHEAD POWER LINE — TO BE REMOVED IN 2020 All land adjacent to site owned by Reidhaven Estate. Notes:
- Do not scale from drawings. All dimensions to be confirmed on site prior to construction.
- Roderick James Architects LLP to be notified of any discrepancies before construction continues.
- These drawings are the copyright property of Roderick James Architects LLP.
- All Roderick James Architects LLP drawings to be read in conjunction with the proposed building notes, oak framing drawings and the structural engineers drawings and specification.
- This document should only be used for the purpose indicated by the drawing status below. KEY TOP OF BANK WB SAFE PEDESTRIAN ACCESS TO BE PROVIDED INTO SAWMILL FOR STAFF, TO BE PART OF SEPARATE PLANNING APPLICATION Site Boundary Land owned by Applicant Number of allocated parking spaces for residents D3 revision 31/01/2020 date Pathways altered details drawing status Planning project Boat of Garten Roderick James Architects LLP Housing Development DISCOVERY HOUSE STEAMER QUAY RD TOTNES DEVON TQ9 5AL tel: 01803 868000 fax: 01803 864475 email: totnes@rjarchitects.co.uk client BSW Timber & Reidhaven Trust scale 1:1000 at A3 date June 2019 drawing Proposed Masterplan drawing number chk’d by drw’n by NS chk’d by PS revision BSW_3_002 D3
Design Rationale. The development will utilize native planting to enhance the setting and will include the following Rain garden swales to take surface water run-off from all houses. Native species wildflower meadow areas to increase biodiversity. Highland Grassland Mix specified. Childrens nature play area. Unadopted roadways to be permeable natural surfaces Extension to core path network between the Drumuillie Sawmill and Boat of Garten. Extension of low bund to north east corner to utilize on site excavation dig out. Tree planting — Within the boundaries of the site there are several areas where small to medium sized self seeded trees are growing, particularly within the area of the proposed access track to the sawmill. To facilitate the track these trees would be transplanted within the site using best practice to increase the area of woodland and preserve the provenance of trees in the scheme. If this was not viable the tree planting will consist of locally sourced Aspen specimens of a similar size to the saplings. Garden boundaries — The design includes ‘soft’ boundaries for the gardens, as in that they will be defined by low mounded bunds planted along the top by a native species hedge containing; Acer campestre Prunus spinosa Ilex aquifolium Corylus avellana Rosa canina Shrub planting — Native and naturalised shrubs will be used throughout the planting areas The following plants will be included and planted in random spacings with a guide desnsity of no more than 1.5m spacings between plants: Cytisus scoparius Rosa canina Viburnum opulus Ulex europaeus Existing trees from site entrance to be replanted here Myrica gale Calluna vulgaris Erica cinere Salix caprea Salix fragilis CORE PATH LINK TO BOAT OF GARTEN; EXACT ROUTE OF PATH TO BE CONFIRMED WITH SEPARATE PLANNING APPLICATION Tree Protection During the construction phase tree protection fencing will be in place along the lines shown to BS5837 General Notes Tree Protection Fencing Soft Garden Boundary Wildflower Meadow Natural Play Area Footpath Network Transplanted or new tree Removed / Repositioned tree No. Shrub planting areas Rainwater Gardens and Infiltration Basins Refer to Asher Associates Civil Engineering drawings for Foul and Surface Water drainage proposals Tilhill FORESTRY For Planning, as per RevClouds Tilhill Forestry Revision/Issue Unit 1 Birchden Farm Broadwater Forest Lane Groombridge Kent PROJECT SAFE PEDESTRIAN ACCESS Boat of Garten TO BE PROVIDED INTO SAWMILL FOR STAFF, TO BE PART OF SEPARATE Housing Development Landscape Masterplan O/H CABLE TO BE REMOVED PLANNING APPLICATION 4 05/02/20 Date 05/02/20 Final 1:500
B A Adjoining Flek flower Meadow Section Notes. Excavated top soil to be spread under removed pylon track at levels to ensure consistent soil levels and minimal impact on existing flora. Road Tree Planding Plag Edding Planing and Bank Easting Bun and Manny NOT TO SCALE 00000 000 8 A No. General Notes Tilhill FORESTRY Revision/Issue Date Tilhill Forestry Unit 1 Birchden Farm Broadwater Forest Lane Groombridge Kent PROJECT Boat of Garten Housing Development Landscape Sections Issue No Sheet B Date 29/10/19 1:500 Rev 1
Tree Protection During the construction phase tree protection fencing will be in place along the lines shown to BS5837 General Notes 0.6 m Standard scaffold poles Heavy gauge 2 m tall galvanized tube and welded mesh infill panels Panels secured to uprights and cross-members with wire ties Ground level Uprights driven into the ground until secure (minimum depth 0.6 m) Standard scaffold clamps Tree Protection Fencing Tilhill FORESTRY No. Revision/Issue Date Tilhill Forestry Unit 1 Birchden Farm Broadwater Forest Lane Groombridge Kent PROJECT Boat of Garten Housing Development Tree Protection Plan Issue No Sheet B 29/10/19 1:500 Rev 1
0 10 20 30 40 M 0 Ft 217.00 40 SITE SECTION A‑A 1:500
SITE SECTION B‑B 1:500 80 120 219.00 218.50 218.00 218.00 217.00 216.00 217.0 216.00 SITE SECTION C‑C 1:500 REFER TO SEPARATE PLANNING APPLICATION FOR THREE HOUSES ON PHASE 3 Notes:
- Do not scale from drawings. All dimensions to be confirmed on site prior to construction.
- Roderick James Architects LLP to be notified of any discrepancies before construction continues.
- These drawings are the copyright property of Roderick James Architects LLP.
- All Roderick James Architects LLP drawings to be read in conjunction with the proposed building notes, oak framing drawings and the structural engineers drawings and specification.
- This document should only be used for the purpose indicated by the drawing status below. A revision 11/11/2019 date Revised for planning, Bund removed on Phase 3 details chk’d by drawing status Planning project Boat of Garten Roderick James Architects LLP Housing Development DISCOVERY HOUSE STEAMER QUAY RD TOTNES DEVON TQ9 5AL tel: 01803 868000 fax: 01803 864475 email: totnes@rjarchitects.co.uk client BSW Timber & Reidhaven Trust scale 1:1000 at A3 date June 2019 drawing Proposed Site Sections drawing number drw’n by INS chk’d by PS revision BSW_3_003 A
Stainless steel flue Slate roof Alu zinc coated steel gutters and downpipes Painted timber weatherboarding NORTH ELEVATION SOUTH ELEVATION M 0 1 2 3 4 Ft 0 2 4 6 8 10 12 1:100 ‑2800- * ‑2800- Slate roof Aluclad timber frame windows and doors Painted timber weather boarding First FFL Ground FFL Ground FFL WEST ELEVATION EAST ELEVATION revision date details chk’d by Roderick James Architects LLP DISCOVERY HOUSE STEAMER QUAY RD TOTNES DEVON TQ9 5AL tel: 01803 868000 fax: 01803 864475 email: totnes@rjarchitects.co.uk drawing status PLANNING project Boat of Garten Housing Development client BSW Timber & Reidhaven Trust scale 1:100 at A3 date June 2019 drawing drw’n by NS Foresters House Elevationshk’d by drawing number BSW_3_018 revision
3200 ‑6400- 2300- B ‑5300 ‑3500 BED 1 HALL A 00 ㅇㅇ D ‑3500 5300 OFFICE/UTILITY / BATHROOM OFFICE/UTILITY / BATHROOM B BED 1 HALL A ㅇㅇ ㅇㅇ UTILITY / BATHROOM UTILITY / BATHROOM KITCHEN KITCHEN DINING DINING LIVING LIVING B D ‑8800 ‑8800 C GROUND FLOOR PLAN M 0 1 2 3 4 Ft 0 2 4 6 8 10 12 1:100 Notes: A BED 2 ROOF PLAN BED 4/STUDY Π A D HALL LINEN LINEN HALL BED 3 BATHROOM BATHROOM BED 3 BED 2 □□
- Only scale for planning purposes. All dimensions to be confirmed on site prior to construction.
- Roderick James Architects LLP to be notified of any discrepancies before construction continues.
- These drawings are the copyright property of Roderick James Architects LLP.
- All Roderick James Architects LLP drawings to be read in conjunction with the proposed building notes, oak framing drawings and the structural engineers drawings and specification.
- All external works shown are indicative. Design and extent is to be provided by others.
- This document should only be used for the purpose indicated by the drawing status below.
- Construction (Design & Management) Regulations 2015. The CDM 2015 regulations apply to this project. If constructed then the contractor should prepare a Construction Phase Plan for the project. Guidance on how to compile this is available from the HSE or CITB. If there is to be more than one contractor on the project (including sub-contractors) a Health and Safety File should be created by the contractor at completion of the works for the client to retain. B FIRST FLOOR PLAN Roderick James Architects LLP DISCOVERY HOUSE STEAMER QUAY RD TOTNES DEVON TQ9 5AL tel: 01803 868000 fax: 01803 864475 email: totnes@rjarchitects.co.uk D revision date details chk’d by drawing status PLANNING project Boat of Garten Housing Development client BSW Timber & Reidhaven Trust scale 1:100 at A3 date June 2019 drawing Foresters drw’n by NS House Plans chk’d by revision drawing number BSW_3_016
SECTION C‑C SECTION A‑A M 0 1 2 3 4 A Π Π D Ft 0 2 4 6 8 10 12 C C 1:100 A 2800- 2600- ‑2450- Loft First FFL Ground FFL Ridge ‑2800- ‑2800 2250- Ridge Ridge First FFL Ground FFL SECTION B‑B SECTION D‑D revision date details chk’d by drawing status Roderick James Architects LLP DISCOVERY HOUSE STEAMER QUAY RD TOTNES DEVON TQ9 5AL tel: 01803 868000 fax: 01803 864475 email: totnes@rjarchitects.co.uk PLANNING project Boat of Garten Housing Development client BSW Timber & Reidhaven Trust scale 1:100 at A3 date June 2019 drawing drw’n by Foresters NS House Sections chk’d by drawing number revision BSW_3_017
Slate roof Alu zinc coated steel gutters and downpipes Painted timber weatherboarding Stainless steel flue Aluclad timber frame doors and windows NORTH ELEVATION SOUTH ELEVATION M 0 1 2 3 4 Ft 0 2 4 6 8 10 12 1:100 ‑8500 ‑8500 ‑2400- ‑2400- 5450- 5450- EAST ELEVATION WEST ELEVATION ‑8500 ‑8500 ‑2400- 5450- ‑2400- 5450- Notes:
- Only scale for planning purposes. All dimensions to be confirmed on site prior to construction.
- Roderick James Architects LLP to be notified of any discrepancies before construction continues.
- These drawings are the copyright property of Roderick James Architects LLP.
- All Roderick James Architects LLP drawings to be read in conjunction with the proposed building notes, oak framing drawings and the structural engineers drawings and specification.
- All external works shown are indicative. Design and extent is to be provided by others.
- This document should only be used for the purpose indicated by the drawing status below.
- Construction (Design & Management) Regulations 2015. The CDM 2015 regulations apply to this project. If constructed then the contractor should prepare a Construction Phase Plan for the project. Guidance on how to compile this is available from the HSE or CITB. If there is to be more than one contractor on the project (including sub-contractors) a Health and Safety File should be created by the contractor at completion of the works for the client to retain. revision date details chk’d by Roderick James Architects LLP DISCOVERY HOUSE STEAMER QUAY RD TOTNES DEVON TQ9 5AL tel: 01803 868000 fax: 01803 864475 email: totnes@rjarchitects.co.uk drawing status PLANNING project Boat of Garten Housing Development client BSW Timber & Reidhaven Trust scale 1:100 at A3 date June 2019 drawing Fair & Square Elevations drawing number BSW_3_012 drw’n by NS chk’d by revision
M 0 1 2 3 4 Ft 0 2 4 6 8 10 12 1:100 8700 8000 B ☑ 4400- 3500- Living ‑8700- ‑8000- Bedroom 1 Bathroom Bedroom 2 2900 ‑2000- 2900 ‑5500 Dining C GROUND FLOOR PLAN D ‑2600- 1975 Kitchen ‑2400 ROOF PLAN Notes:
- Only scale for planning purposes. All dimensions to be confirmed on site prior to construction.
- Roderick James Architects LLP to be notified of any discrepancies before construction continues.
- These drawings are the copyright property of Roderick James Architects LLP.
- All Roderick James Architects LLP drawings to be read in conjunction with the proposed building notes, oak framing drawings and the structural engineers drawings and specification.
- All external works shown are indicative. Design and extent is to be provided by others.
- This document should only be used for the purpose indicated by the drawing status below.
- Construction (Design & Management) Regulations 2015. The CDM 2015 regulations apply to this project. If constructed then the contractor should prepare a Construction Phase Plan for the project. Guidance on how to compile this is available from the HSE or CITB. If there is to be more than one contractor on the project (including sub-contractors) a Health and Safety File should be created by the contractor at completion of the works for the client to retain. A Fair & Square Plans drawing number drw’n by NS chk’d by BSW_3_010 A
2400- 5400- 30° 30° 4780 ‑8700 SECTION A‑A Storage 2400- 4780- 2400- 5400- Bathroom Kitchen Storage 2400- 5400- 30° Dining 5730- 2400- Storage 30° 2400- SECTION C‑C 5730- 2400- SECTION D‑D A B B C 미 SECTION E‑E D D C ‑8700 미 2400- 5400- A 4780 ‑8700 ‑2400- SECTION B‑B 5400 SECTION C‑C B 미 ‑8700 2400- 5400- 2400- 5730- ‑8700 미 F A A 4780- 8700- 5400- A 2400- 30° KEY PLAN 1:200 A B C D KEY PLAN KEY PLAN 1:200 1:200 Notes Notes Notes KEY PLAN 1:200 The dimension should only be The dimension should only be The dimension should only be used only for The dimension should only be confirmed on site prior confirmed on site prior confirmed on site prior confirmed on site prior site site site
- All James should All 4. All drawings All to be read in to be read in All James drawings and the to be read in and the drawings to be to be read in All James to All drawings The to be read inand the to The to beAllJames AllJames All James shouldJames James All 4.James 5.5.AllJames5AllJames5AllJames5AllJames TheThe should The All drawings The All drawings 44 James The All James to be read in All James to be read in All James to be to be to be The 44 018036) FAX to . FAX FAX FAX to FAX to FAX FAX 018036 FAXFAX All FAX 1:100 KEY KEY 5:274715:274715:274715:27471:100 1:100 1:100 1:100 5:27471342283422834228342283422 FAX FAX 5:27471All
M M M M M M 1:100 1:100 1:100 1:100 1:100 1:100 KEY KEY 5:27471 :27471 :27471 :27471M :27471:27471010 21412141 FAX The:27471 M 1:100
Slate roof Alu zinc coated steel gutters and downpipes Painted timber weatherboarding Aluclad timber frame doors and windows NORTH ELEVATION SOUTH ELEVATION M 0 1 2 3 4 Ft 0 2 4 6 8 10 12 1:100 12950 Stainless steel flue ‑2400- 4780- EAST ELEVATION Notes:
- Only scale for planning purposes. All dimensions to be confirmed on site prior to construction.
- Roderick James Architects LLP to be notified of any discrepancies before construction continues.
- These drawings are the copyright property of Roderick James Architects LLP.
- All Roderick James Architects LLP drawings to be read in conjunction with the proposed building notes, oak framing drawings and the structural engineers drawings and specification.
- All external works shown are indicative. Design and extent is to be provided by others.
- This document should only be used for the purpose indicated by the drawing status below.
- Construction (Design & Management) Regulations 2015. The CDM 2015 regulations apply to this project. If constructed then the contractor should prepare a Construction Phase Plan for the project. Guidance on how to compile this is available from the HSE or CITB. If there is to be more than one contractor on the project (including sub-contractors) a Health and Safety File should be created by the contractor at completion of the works for the client to retain. WEST ELEVATION revision date details chk’d by Roderick James Architects LLP DISCOVERY HOUSE STEAMER QUAY RD TOTNES DEVON TQ9 5AL tel: 01803 868000 fax: 01803 864475 email: totnes@rjarchitects.co.uk drawing status PLANNING project Boat of Garten Housing Development client BSW Timber & Reidhaven Trust scale 1:100 at A3 date June 2019 drawing Croft House drw’n by NS chk’d by Elevations drawing number BSW_3_015 revision
M 0 1 2 3 4 Ft 0 2 4 6 8 10 12 1:100 0089- A ROOF PLAN ‑4000- 900- E D ‑12950 2350 Bathroom ‑1600 600. 4275 ‑2925 Kitchen Store/Study/Bath2 Dining Bedroom 1 Living ‑3000 GROUND FLOOR PLAN ☑ Bedroom 2 5950 3000- 900- ‑000 A Notes:
- Only scale for planning purposes. All dimensions to be confirmed on site prior to construction.
- Roderick James Architects LLP to be notified of any discrepancies before construction continues.
- These drawings are the copyright property of Roderick James Architects LLP.
- All Roderick James Architects LLP drawings to be read in conjunction with the proposed building notes, oak framing drawings and the structural engineers drawings and specification.
- All external works shown are indicative. Design and extent is to be provided by others.
- This document should only be used for the purpose indicated by the drawing status below.
- Construction (Design & Management) Regulations 2015. The CDM 2015 regulations apply to this project. If constructed then the contractor should prepare a Construction Phase Plan for the project. Guidance on how to compile this is available from the HSE or CITB. If there is to be more than one contractor on the project (including sub-contractors) a Health and Safety File should be created by the contractor at completion of the works for the client to retain. revision date details chk’d by Roderick James Architects LLP DISCOVERY HOUSE STEAMER QUAY RD TOTNES DEVON TQ9 5AL tel: 01803 868000 fax: 01803 864475 email: totnes@rjarchitects.co.uk drawing status PLANNING project Boat of Garten Housing Development client BSW Timber & Reidhaven Trust scale 1:100 at A3 date June 2019 drawing Croft House drw’n by NS chk’d by Plans revision BSW_3_013
4780 SECTION A‑A 30° Storage ‑2400- 30° Storage Bedroom 2 Store / Study/Bathroom 2 Living Hall SECTION B‑B SECTION C‑C M 0 1 2 3 4 Ft 0 2 4 6 8 10 12 1:100 Storage SECTION D‑D Dining Kitchen Bedroom 1 Bathroom SECTION E‑E ‑2400- 5730- Notes:
- Only scale for planning purposes. All dimensions to be confirmed on site prior to construction.
- Roderick James Architects LLP to be notified of any discrepancies before construction continues.
- These drawings are the copyright property of Roderick James Architects LLP.
- All Roderick James Architects LLP drawings to be read in conjunction with the proposed building notes, oak framing drawings and the structural engineers drawings and specification.
- All external works shown are indicative. Design and extent is to be provided by others.
- This document should only be used for the purpose indicated by the drawing status below.
- Construction (Design & Management) Regulations 2015. The CDM 2015 regulations apply to this project. If constructed then the contractor should prepare a Construction Phase Plan for the project. Guidance on how to compile this is available from the HSE or CITB. If there is to be more than one contractor on the project (including sub-contractors) a Health and Safety File should be created by the contractor at completion of the works for the client to retain. E D C B 미 B A KEY PLAN 1:200 revision date details chk’d by Roderick James Architects LLP DISCOVERY HOUSE STEAMER QUAY RD TOTNES DEVON TQ9 5AL tel: 01803 868000 fax: 01803 864475 email: totnes@rjarchitects.co.uk drawing status PLANNING project Boat of Garten Housing Development client BSW Timber & Reidhaven Trust scale 1:100 at A3 date June 2019 drawing Croft House drw’n by NS Sections chk’d by drawing number revision BSW_3_014
Corrugated metal roof Slate grey Alu zinc coated steel- gutters and downpipes Aluclad frame windows and doors Painted timber weather boarding Stainless steel flue Corrugated metal roof Slate grey Alu zinc coated steel gutters and downpipes Painted timber weather boarding M 0 1 2 3 4 Ft 0 2 4 6 8 10 12 1:100 NORTH ELEVATION EAST ELEVATION Aluclad frame glazed gable SOUTH ELEVATION Notes:
- Only scale for planning purposes. All dimensions to be confirmed on site prior to construction.
- Roderick James Architects LLP to be notified of any discrepancies before construction continues.
- These drawings are the copyright property of Roderick James Architects LLP.
- All Roderick James Architects LLP drawings to be read in conjunction with the proposed building notes, oak framing drawings and the structural engineers drawings and specification.
- All external works shown are indicative. Design and extent is to be provided by others.
- This document should only be used for the purpose indicated by the drawing status below.
- Construction (Design & Management) Regulations 2015. The CDM 2015 regulations apply to this project. If constructed then the contractor should prepare a Construction Phase Plan for the project. Guidance on how to compile this is available from the HSE or CITB. If there is to be more than one contractor on the project (including sub-contractors) a Health and Safety File should be created by the contractor at completion of the works for the client to retain. Aluclad timber frame windows and doors Painted timber weather boarding WEST ELEVATION A 31/01/2020 | Roof material revision date