Item8Appendix2CloicheWindFarm20200121PAC
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Agenda Item 8 Appendix 11 25/09/2020
AGENDA ITEM 8
APPENDIX II
2020/0121/PAC
CLOICHE WIND FARM FIGURE 7.8.3
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Agenda Item 8 Appendix 11 25/09/2020
[Map of wind farm visibility]
sse Renewables ash
Key
- Proposed Turbine
- Operational/Under Construction Turbine
- Consented Turbine
- 40km Wider Study Area
- 20km Detailed Study Area
- 5km Distance Radii
- Cairngorms National Park Boundary (CNP)
Zone of Theoretical Visibility: Wind Farm Development Theoretically Visible
Figure 7.8.3 Cumulative ZTV-Proposed Development with Operational/Under Construction and Consented Sites
Cloiche Wind Farm EIA Report