Skip to content
Please be aware the content below has been generated by an AI model from a source PDF.

Item8Appendix2CloicheWindFarm20200121PAC

CAIRNGORMS NATION­AL PARK AUTHOR­ITY Plan­ning Com­mit­tee Agenda Item 8 Appendix 11 25/09/2020

AGENDA ITEM 8

APPENDIX II

2020/0121/PAC

CLOI­CHE WIND FARM FIG­URE 7.8.3


CAIRNGORMS NATION­AL PARK AUTHOR­ITY Plan­ning Com­mit­tee Agenda Item 8 Appendix 11 25/09/2020

[Map of wind farm visibility]

sse Renew­ables ash

Key

  • Pro­posed Turbine
  • Operational/​Under Con­struc­tion Turbine
  • Con­sen­ted Turbine
  • 40km Wider Study Area
  • 20km Detailed Study Area
  • 5km Dis­tance Radii
  • Cairngorms Nation­al Park Bound­ary (CNP)

Zone of The­or­et­ic­al Vis­ib­il­ity: Wind Farm Devel­op­ment The­or­et­ic­ally Visible

Fig­ure 7.8.3 Cumu­lat­ive ZTV-Pro­posed Devel­op­ment with Operational/​Under Con­struc­tion and Con­sen­ted Sites

Cloi­che Wind Farm EIA Report

×

We want your feedback

Thank you for visiting our new website. We'd appreciate any feedback using our quick feedback form. Your thoughts make a big difference.

Thank you!