Item8Appendix3CloicheWindFarm20200121PAC
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Agenda Item 8 Appendix III 25/09/2020
AGENDA ITEM 8
APPENDIX III
2020/0121/PAC
CLOICHE WIND FARM FIGURE 7.8.1
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Agenda Item 8 Appendix III 25/09/2020
sse Renewables Key ash
- Proposed Turbine
- Operational/Under Construction Turbine
- Consented Turbine
- Application/Appeal Turbine
- 40km Wider Study
- 20km Detailed Study
- 5km Distance Radii
- Cairngorms National Park Boundary (CNP)
Zone of Theoretical Visibility: Wind Farm Development Theoretically Visible
Proposed Development Cumulative Baseline Sites (Operational/Under Construction, Consented and Application/Appeal)
0 2 4 6 8 10 km Scale: 1:325,000 @ A3
Figure 7.8.1 Cumulative ZTV — Proposed Development with All Cumulative Baseline Sites
Cloiche Wind Farm EIA Report