Skip to content
Please be aware the content below has been generated by an AI model from a source PDF.

Item8Appendix3CloicheWindFarm20200121PAC

CAIRNGORMS NATION­AL PARK AUTHOR­ITY Plan­ning Com­mit­tee Agenda Item 8 Appendix III 25/09/2020

AGENDA ITEM 8

APPENDIX III

2020/0121/PAC

CLOI­CHE WIND FARM FIG­URE 7.8.1


CAIRNGORMS NATION­AL PARK AUTHOR­ITY Plan­ning Com­mit­tee Agenda Item 8 Appendix III 25/09/2020

sse Renew­ables Key ash

  • Pro­posed Turbine
  • Operational/​Under Con­struc­tion Turbine
  • Con­sen­ted Turbine
  • Application/​Appeal Turbine
  • 40km Wider Study
  • 20km Detailed Study
  • 5km Dis­tance Radii
  • Cairngorms Nation­al Park Bound­ary (CNP)

Zone of The­or­et­ic­al Vis­ib­il­ity: Wind Farm Devel­op­ment The­or­et­ic­ally Visible

Pro­posed Devel­op­ment Cumu­lat­ive Baseline Sites (Operational/​Under Con­struc­tion, Con­sen­ted and Application/​Appeal)

0 2 4 6 8 10 km Scale: 1:325,000A3

Fig­ure 7.8.1 Cumu­lat­ive ZTV — Pro­posed Devel­op­ment with All Cumu­lat­ive Baseline Sites

Cloi­che Wind Farm EIA Report

×

We want your feedback

Thank you for visiting our new website. We'd appreciate any feedback using our quick feedback form. Your thoughts make a big difference.

Thank you!