Post Main Issues Report – New Sites Consultation
Cairngorms NATIONAL PARK Pàirc Nàiseanta a’ Mhonaidh Ruaidh Cairngorms National Park Local Development Plan 2020 Post Main Issues Report: New Sites Consultation 13 August — 21 September 2018
Cairngorms National Park Local Development Plan 2020 Post Main Issues Report: New Sites Consultation 13 August 2018 – 21 September 2018
About this consultation We are currently in the process of preparing a new Local Development Plan for adoption in 2020. The first stage of this process was the Main Issues Report (MIR), which we consulted on from November 2017 to February 2018.
The MIR sought views on the big issues that the Cairngorms National Park Local Development Plan 2020 needs to address and the options for tackling them. It also set out choices for the land allocations that could be made for development, and for policies that will be used to make decisions on applications for planning permission.
We received a high number of responses to the MIR consultation, including a number of new site proposals that were not included in the MIR. As part of our analysis of responses, we have considered these proposals and have identified a small number of new site allocations we wish to include in the Proposed Plan.
Circular 6/2013 (para. 80) requires planning authorities to carry out further consultation for any issues or sites proposed for inclusion in the Proposed Plan that were not contained in the MIR.
Therefore, the purpose of this consultation is to seek views on the small number of new sites which the CNΡΑ wishes to include within the Proposed Plan.
The consultation will take place from 13 August until 21 September 2018.
We are not reopening consultation on any other parts of the MIR and ask that you only consider the limited number of additional sites set out in this document. Any comments made on other issues or sites from the MIR will not be considered at this stage.
How to comment You can send us your comments on the additional sites by post or email to:
Cairngorms National Park Authority FREEPOST NAT 21454 Grantown-on-Spey PH26 3BR
planning@cairngorms.co.uk
All comments must be received by 5pm on Friday 21 September 2018.
What happens next Consultation responses will be collated and used alongside the comments from the previous MIR consultation to inform the preparation of the Proposed Cairngorms National Park Local Development Plan 2020. We expect to publish this for public comment at the end of this year.
You can keep up to date with progress on the new Local Development Plan at www.cairngorms.co.uk
Data protection Details provided in response to this consultation will only be used for purposes associated with the Cairngorms National Park Local Development Plan
- You may request to see personal information held by the CNPA at any time. Information may be published on our website. We will not publish address details but may publish the name of the person who has responded. By responding to this consultation, you are consenting to the above.
CONTENTS
AVIEMORE: EDI EXTENSION & NEW COMMUNITY SITE 2
AVIEMORE: ADDITIONAL ECONOMIC DEVELOPMENT ALLOCATION 3
CALVINE: FORMER STRUAN SCHOOL 4
CARR-BRIDGE: LANDMARK EXTENSION 5
GRANTOWN-ON-SPEY: CARAVAN PARK EXTENSION 6
TOMINTOUL: EXTENSION TO EXISTING TOURISM ALLOCATION 7
1
8 34567 AVIEMORE: EDI EXTENSION & NEW COMMUNITY SITE Proposed Community Use Allocation P853 5 6 a Proposed Extension to EDI Allocation ESS Dalfaber 3 Strathspey Railway Existing EDI Allocation 23456 1026 .. 16 Existing Cl Allocation 1 Metres Reproduced by permission of Ordnance Survey on behalf of HMSO. Crown copyright and database right 2018. All rights reserved. Ordnance Survey Licence number 100040965 Cairngorms National Park Authority
- Proposed Extension to EDI Allocation: Dalfaber Industrial Estate
Proposal: To extend the existing allocation for Economic Development – EDI at Dalfaber Industrial Estate to the north. This limited extension is considered suitable for development and will make a small addition to the supply of economic development land.
- Proposed Community Use Allocation: Spaven Drive
Proposal: To re-allocate the existing protected open space at Spaven Drive for community uses. This site has been identified by Aviemore Community Enterprise Company as a possible location for a new community hall with a kick park and playground. Although there is an existing community use allocation in Aviemore (site CI), it has been highlighted that the existing allocation is not appropriate to accommodate this development proposal. An additional new community use allocation is therefore required.
2 Π
AVIEMORE: ADDITIONAL ECONOMIC DEVELOPMENT ALLOCATION B B BoB Proposed Additional Economic Development Allocation Π 188 Preferred North Aviemore Site (as already consulted on through the MIR) 130 Metres Crown copyright and database right 2018. All rights reserved. Reproduced by permission of Ordnance Survey on behalf of HMSO. Ordnance Survey Licence number 100040965 Cairngorms National Park Authority
- Proposed Additional Economic Development Allocation: North Aviemore
Proposal: To identify an additional area of land incorporating the existing operational businesses adjoining the preferred North Aviemore economic development site (the North Aviemore site has already been consulted on through the MIR so we are not seeking further views on it at this stage). This additional area is considered to have capacity for some further business development and would add to the overall supply of economic development land in Aviemore.
3
CALVINE: FORMER STRUAN SCHOOL
Proposed Community Use Allocation Reproduced by permission of Ordnance Survey on behalf of HMSO. © Crown copyright and database right 2018. All rights reserved. Ordnance Survey Licence number 100040965 Cairngorms National Park Authority 40 Metres
- Proposed Community Use Allocation: Former Struan Primary School
Proposal: To identify the former Struan Primary School in Calvine as a community use allocation. The site provides an appropriate redevelopment opportunity and is considered appropriate for inclusion in the Proposed Plan as a community use allocation, with affordable housing being listed as one of the potential uses that could deliver significant community benefits.
4
CARR-BRIDGE: LANDMARK EXTENSION
Proposed Extension to TI Allocation Track rack Bllan Wood Track Ellan Wood Existing TI Allocation 木 Reproduced by permission of Ordnance Survey on behalf of HMSO. Crown copyright and database right 2018. All rights reserved. Ordnance Survey Licence number 100040965 Cairngorms National Park Authority 190 Metres
- Proposed Extension to TI Allocation: Landmark Forest Adventure Park
Proposal: To extend the existing TI allocation for Landmark Forest Adventure Park to the west and south. Landmark is an existing and established business and it is considered appropriate to include this extension to accommodate increased parking and future expansion of the business.
5
GRANTOWN-ON-SPEY: CARAVAN PARK EXTENSION
Existing TI Allocation Caravan Park Kylintra Burn Seafield Court Proposed extension to TI Allocation Issues Reproduced by permission of Ordnance Survey on behalf of HMSO. Crown copyright and database right 2018. All rights reserved. Ordnance Survey Licence number 100040965 Cairngorms National Park Authority Seafield 0 etres
- Proposed Extension to TI Allocation: Grantown Caravan Park
Proposal: To extend existing TI allocation for Grantown Caravan Park to the north east. There is an existing planning permission on the Caravan Park which extends beyond the existing allocation. It is considered appropriate to extend the TI allocation to cover the area of this existing permission as well as a limited additional area to the north east.
6
TOMINTOUL: EXTENSION TO EXISTING TOURISM ALLOCATION ESS 43 Playing Field 46.5m 95 Riem ore 2a FB Highlea Playground Reservoir Existing TI Allocation B Proposed extension to TI Allocation Path (um) Track 木 Reproduced by permission of Ordnance Survey on behalf of HMSO. Crown copyright and database right 2018. All rights reserved. Ordnance Survey Licence number 100040965 Cairngorms National Park Authority
- Proposed Extension to TI Allocation: Tomintoul Issues 80 Metres Proposal: To extend the existing TI tourism allocation in Tomintoul to include the recent wigwam development.
Consultation Question: Do you have any comments about these additional site proposals, which we intend to include in the Proposed Plan?
7
This document is available in large print and other formats, on request. Please contact the Cairngorms National Park Authority on 01479 873535. It is also available to view at www.cairngorms.co.uk
Published by Cairngorms National Park Authority 14 The Square Grantown-on-Spey PH26 3HG
planning@cairngorms.co.uk Tel: 01479 873535 Fax: 01479 873527
www.cairngorms.co.uk © CNPA 2018. All rights reserved. Cairngorms NATIONAL PARK Pàirc Nàiseanta a’ Mhonaidh Ruaidh