Skip to content
Please be aware the content below has been generated by an AI model from a source PDF.

River Dee design drawing

Elec­tri­city BT Line River Dee

S1 S14 S13 Embank­ment Floodplain

Excav­a­tion of scrapes to enhance hab­it­at and flood stor­age. Include vari­able depths cre­at­ing dif­fer­ent hab­it­ats and max­im­ising wild­life benefits.

S9 Cre­ate island fea­tures to increase hab­it­at diversity with­in the scrapes while redu­cing excess cut material.

S6 S10 S5 S8 S7 L3 L4 L5 S2 RIVER DEE S4 L2 S3 A L1 S17 S16 S15 S11 S18

SAFETY HEALTH AND ENVIR­ON­MENT­AL INFORM­A­TION In addi­tion to the hazards/​risk nor­mally asso­ci­ated with the types of work detailed on this draw­ing, note the fol­low­ing risks and Inform­a­tion. Please note that risks lis­ted here are not exhaust­ive. CON­STRUC­TION Work­ing in close prox­im­ity to deep water envir­on­ments. Dis­turb­ing or strik­ing exist­ing util­it­ies and ser­vices. MAINTENANCE/CLEANING No unusu­al hazards/​reks DECOMMISSIONING/DEMOLITION No unusu­al hazards/​risks It is assumed that all works will be car­ried out by a com­pet­ent con­tract­or. LEGEND Exist­ing water­course Exist­ing trib­u­tar­ies and ditches Exist­ing embank­ment to be retained Exist­ing elec­tri­city line Exist­ing BT line A Exist­ing pylon A A Pro­posed Design Embank­ment removal

S12 L6 L7 BRAEMAR

Remove all bank toe pro­tec­tion along river left bank to remove con­straints to lat­er­al adjust­ment. Install Large Wood Struc­tures (LWS) to enhance nat­ur­al pro­cesses and cre­ate phys­ic­al and hab­it­at diversity in chan­nel. Scrape back embank­ment (strip­ping the turf and reusing it fol­low­ing con­struc­tion) and infill area of low ground behind embank­ment and/​or cre­ation of raised areas of flood­plain, using spoil gen­er­ated from embank­ment remov­al and scrape cre­ation. Retain a sec­tion of exist­ing embank­ment to avoid any impact on exist­ing over­head powerline.

Bank pro­tec­tion remov­al Scrapes S18 Iskand Wood revet­ment Rock armour Stone dyke In-chan­nel Large Wood Struc­ture (LWS) L1 Flood­plain Large Wood Struc­ture (LWS) Ripari­an veget­a­tion plant­ing** Sur­veyed by Steph­en Addy (James Hut­ton Lim­ited). Edwin Third (DDSFB), Shalla Roo (NTS) 2150259 Pro­ject Num­ber Pro­ject Title River Dee Detailed Design Draw­ing Title PLAN VIEW

Designed by Scale @ A3 1:8,000 LM 0 100 200 Drawn Date ال 10/09/2024 Brit­ish Nation­al Grid Checked Date LM 10/09/2024 ORD SURV GB Approved Date Ver­sion Date KC 10/09/2024 3 10/09/2024

Ripari­an veget­a­tion plant­ing along river cor­ridor to provide hab­it­at and a future source of large wood. Loc­a­tions of tree plant­ing are indic­at­ive only and will form part of longer-term plant­ing strategy. 23 Microsoft Cor­por­a­tion © 2023 Max­ar ©CNES (2023) Dis­tri­bu­tion Air­bus DS

Draw­ing Num­ber 1

cbec eco engineering

×

We want your feedback

Thank you for visiting our new website. We'd appreciate any feedback using our quick feedback form. Your thoughts make a big difference.

Thank you!