Excavation of scrapes to enhance habitat and flood storage. Include variable depths creating different habitats and maximising wildlife benefits.
S9 Create island features to increase habitat diversity within the scrapes while reducing excess cut material.
S6 S10 S5 S8 S7 L3 L4 L5 S2 RIVER DEE S4 L2 S3 A L1 S17 S16 S15 S11 S18
SAFETY HEALTH AND ENVIRONMENTAL INFORMATION In addition to the hazards/risk normally associated with the types of work detailed on this drawing, note the following risks and Information. Please note that risks listed here are not exhaustive. CONSTRUCTION Working in close proximity to deep water environments. Disturbing or striking existing utilities and services. MAINTENANCE/CLEANING No unusual hazards/reks DECOMMISSIONING/DEMOLITION No unusual hazards/risks It is assumed that all works will be carried out by a competent contractor. LEGEND Existing watercourse Existing tributaries and ditches Existing embankment to be retained Existing electricity line Existing BT line A Existing pylon A A Proposed Design Embankment removal
S12 L6 L7 BRAEMAR
Remove all bank toe protection along river left bank to remove constraints to lateral adjustment. Install Large Wood Structures (LWS) to enhance natural processes and create physical and habitat diversity in channel. Scrape back embankment (stripping the turf and reusing it following construction) and infill area of low ground behind embankment and/or creation of raised areas of floodplain, using spoil generated from embankment removal and scrape creation. Retain a section of existing embankment to avoid any impact on existing overhead powerline.
Bank protection removal Scrapes S18 Iskand Wood revetment Rock armour Stone dyke In-channel Large Wood Structure (LWS) L1 Floodplain Large Wood Structure (LWS) Riparian vegetation planting** Surveyed by Stephen Addy (James Hutton Limited). Edwin Third (DDSFB), Shalla Roo (NTS) 2150259 Project Number Project Title River Dee Detailed Design Drawing Title PLAN VIEW
Designed by Scale @ A3 1:8,000 LM 0 100 200 Drawn Date ال 10/09/2024 British National Grid Checked Date LM 10/09/2024 ORD SURV GB Approved Date Version Date KC 10/09/2024 3 10/09/2024
Riparian vegetation planting along river corridor to provide habitat and a future source of large wood. Locations of tree planting are indicative only and will form part of longer-term planting strategy. 23 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS