Weekly List of Active Planning Applications - 31 March 2025
Cairngorms National Park Authority Ughdarras Pàirc Nàiseanta a’ Mhonaidh Ruaidh
Page 1 of 4
Weekly list of active planning applications called-in by the Cairngorms National Park Authority Date of List: 31 March 2025 Number of Applications: 9
Date of call-in | CNPA Reference | Local Authority Reference | Case Officer | Application Description | Deadline for Public Comments* |
---|---|---|---|---|---|
30/10/2023 | 2023/0406/DET | 23/01733/FLL | Katie Crerar | Erection of warehouse building (class 6), formation of access track, parking area, and associated works at Land 130 Metres Southeast of House of Bruar, Pitagowan, Blair Atholl, Pitlochry, PH18 5TW | 27/11/2023 |
07/10/2024 | 2024/0260/DET | 24/04006/FUL | Colin Bryans | Demolition of building and erection of 6no. terraced houses, 2no. semidetached houses and a block of 6no. flats at 21 Morlich Court, Aviemore, PH22 1SL | 04/11/2024 |
21/10/2024 | 2024/0272/MSC | 24/04130/MSC | Katherine Donnachie | Erection of 4No. houses at Land 35M South of The Snipe, 3 Deshar Court, Boat of Garten | 18/11/2024 |
- The deadline for public comments is normally 28 days from the date of call-in by the Cairngorms National Park Authority.
Cairngorms National Park Authority Ughdarras Pàirc Nàiseanta a’ Mhonaidh Ruaidh
Page 2 of 4
Date of call-in | CNPA Reference | Local Authority Reference | Case Officer | Application Description | Deadline for Public Comments* |
---|---|---|---|---|---|
13/01/2025 | 2025/0008/DET | 24/01903/APP | Katie Crerar | Proposed telecommunications installation comprising of a new 15.0m high lattice tower on new concrete base, 3no shared antennas, 2no dishes, 4no cabinets, 2no 9m (hub height) micro turbines, a solar array, 1no generator compound and ancillary development at Land at Geal Charn Lower, Glenavon Estate, Inchory Lodge, Tomintoul, Ballindalloch, Moray, AB37 9HX | 10/02/2025 |
13/01/2025 | 2025/0010/DET | APP/2024/1967 | Colin Bryans | Upper Dee River and Floodplain Restoration at Site at The River Dee from No 1446 9203 up to the confluence with the Quoich water at No 1226 9068, Aberdeenshire | 10/02/2025 |
10/02/2025 | 2025/0019/DET | 25/00022/FUL | Colin Bryans | Alterations and extension to centre, dining and catering hall, covered walkway, storage unit, erection of 4No. accommodation units and office block at Abernethy Trust, Nethy Bridge, PH25 3ED | 10/03/2025 |
- The deadline for public comments is normally 28 days from the date of call-in by the Cairngorms National Park Authority.
Cairngorms National Park Authority Ughdarras Pàirc Nàiseanta a’ Mhonaidh Ruaidh
Page 3 of 4
Date of call-in | CNPA Reference | Local Authority Reference | Case Officer | Application Description | Deadline for Public Comments* |
---|---|---|---|---|---|
24/02/2025 | 2025/0034/DET | 25/00404/FUL | Katherine Donnachie | Residential development of 35no. units, formation of access road and SUDS at Land 160M South of Lynstock Park, Nethy Bridge | 24/03/2025 |
10/03/2025 | 2025/0044/DET | 24/01904/APP | Katie Crerar | Proposed telecommunications installation comprising of a new 20.0m high lattice tower on new concrete base, 3no shared antennas, 2no dishes, 5no cabinets, 2no 9m (hub height) micro turbines, a solar array, 1no generator compound and ancillary development at Cnap Cnaochann Aitinn, Glenavon Estate, Inchory Lodge, Tomintoul, Ballidalloch, Moray, AB37 9HX | 07/04/2025 |
- The deadline for public comments is normally 28 days from the date of call-in by the Cairngorms National Park Authority.
Cairngorms National Park Authority Ughdarras Pàirc Nàiseanta a’ Mhonaidh Ruaidh
Page 4 of 4
Date of call-in | CNPA Reference | Local Authority Reference | Case Officer | Application Description | Deadline for Public Comments* |
---|---|---|---|---|---|
17/03/2025 | 2025/0053/DET | 25/00110/FULL | Colin Bryans | Proposed restoration of March Burn including realignment of river channel, removal of lower section of river embankments, infilling and regrading of river channel and river embankment, installation of large wood green bank protection and large wood structures, the formation of an inset floodplain and wetland scrapes and associated works at March Burn Site & Construction Access, Glen Clovα | 14/04/2025 |
- The deadline for public comments is normally 28 days from the date of call-in by the Cairngorms National Park Authority.