Skip to content

Active communities Boat of Garten - supporting documents

5 January 2026

This document contains details about proposals to improve travel around Boat of Garten by creating safer, more accessible routes for walking, cycling, wheelchairs, and buggies. These plans, developed with community feedback, aim to connect key destinations like the school and village centre, featuring improvements such as new pedestrian crossings, wider pavements, smoother surfaces with dropped kerbs, and better signage. The project also includes speed bumps to slow traffic and increase safety, especially near the school route, along with more greenspace and seating. While construction timelines depend on available funding, residents are encouraged to stay involved in the process, which has a timeline for outline designs by March 2026, detailed designs by March 2027, and construction planned for 2027/8.
Please be aware that this summary has been generated using AI.
×

We want your feedback

Thank you for visiting our new website. We'd appreciate any feedback using our quick feedback form. Your thoughts make a big difference.

Thank you!