230609RiskAssessmentPCSiteVisitDulichtCourtGrantownOnSpey

Risk Assess­ment

CNPA Plan­ning Com­mit­tee Site Vis­it to Dulicht Court, Grant­own-on-Spey, 09 June 2023

Task / Work activ­ity /​operation Descrip­tion: CNPA Plan­ning Com­mit­tee Site Vis­it to Dulicht Court, Grant­own-on-Spey 09 June 2023 Site vis­it will com­mence at 0930 hours.

Loc­a­tion: Dulicht Court Grantown-on-Spey

Date of assess­ment: 31 May June 2023

Review date:

Assessors: Ed Swales Sig­na­ture: EdSwales

Num­berHaz­ards: e.g. Trail­ing cablePer­sons & num­bers exposedHarm: e.g. Trip­ping over cable and sprain­ing ankle.Risk Rat­ing Without Con­trolsCon­trols: E.g. re route cable or cov­er with cable tidyRisk Rat­ing With Controls
C L RCon­trols:C L R
1Expos­ure to Cov­id 19 virusMem­bers of the CNPA Plan­ning Com­mit­tee, Staff & Mem­bers of PublicBecom­ing ill with Covid193 1 31. Site vis­it will be out­side to reduce any risks of transmission.3 1 3
2Road and traffic on site or enroute to siteMem­bers of the CNPA Plan­ning Com­mit­tee, Staff & Mem­bers of PublicRTA’s and collisions4 1 41. The site vis­it is at a quiet loc­a­tion of Dulicht Court, with pave­ments beside the road and very little traffic.
2. Par­ti­cipants will be briefed to take care.
4 1 4
3Weath­er — extremes of cold/​wet/​wind orMem­bers of the CNPA Plan­ning Com­mit­tee, Staff & Mem­bers of PublicExpos­ure3 1 61. Weath­er fore­cast will be checked pri­or to the date but long range fore­cast is for mild, dry weath­er.
2. Advise mem­bers to wear appro­pri­ate cloth­ing for the weath­er con­di­tions.
3. Mem­bers can return to mode of trans­port whenev­er they choose.
2 1 2

Page 1 of 2

warm weath­er

  1. Site vis­it will be can­celled if fore­cast is extreme or shortened or can­celled if weath­er con­di­tions on site are extreme.
  2. Site vis­it is of short duration.

Fur­ther Recom­mend­a­tions | Addi­tion­al con­trols that would fur­ther reduce the risk if
Imple­men­ted in the future. | Date to be
Actioned by | Date
Com­pleted | | — -| — -| — -|

PPE Require­ment

Risk Rat­ing Key | Like­li­hood (L) x | Con­sequence © | = | ®Over­all Risk Rat­ing | | — -| — -| — -| — -| | 1 Very Unlikely
2 Unlikely
3 Fairly Likely
4 Likely
5 Very likely | 1 Insig­ni­fic­ant
2 Minor
3 Mod­er­ate
4 Major
5 Cata­stroph­ic | | 17 – 25 Unac­cept­able
10 – 16 Tol­er­able
5 – 9 Adequate
1 – 4 Acceptable |

Checked by: Gav­in Miles Sig­na­ture: Gav­in Miles Pos­i­tion: Head of Stra­tegic Planning

Page 2 of 2

×