Skip to content
Please be aware the content below has been generated by an AI model from a source PDF.

Item 5 Appendix1a Plans SlugainBurnRestoration 20260160DET

Cairngorms Nation­al Park Author­ity Ugh­dar­ras Pàirc Nàiseanta a’ Mhon­aidh Ruaidh

Item 5 Appendix 1a 09 Octo­ber 2026 Page 1 of 4

Agenda item 5

Appendix 1a

2026/0160/DET

Plans


Cairngorms Nation­al Park Author­ity Ugh­dar­ras Pàirc Nàiseanta a’ Mhon­aidh Ruaidh

Item 5 Appendix 1a 09 Octo­ber 2026 Page 2 of 4

SITE LOC­A­TION KEY PLAN SCALE 1:50,000

GEN­ER­AL NOTES

  1. ALL DIMEN­SIONS ARE IN METRES UNLESS NOTED OTHERWISE.
  2. ALL COORDIN­ATES ARE IN METRES REL­AT­IVE TO ORD­NANCE SUR­VEY NATION­AL GRID.
  3. ALL DIMEN­SIONS MUST BE CHECKED/VERIFIED ON SITE.
  4. ANY DIS­CREP­AN­CIES NOTED ON SITE ARE TO BE REPOR­TED TO THE SUPER­VISOR IMMEDIATELY.
  5. THE ELEC­TRON­IC VER­SION OF THIS DRAW­ING IS NOT TO BE USED FOR SET­TING OUT.
  6. THE LOC­A­TIONS OF ANY KNOWN SER­VICES SHOWN ON DRAW­INGS ARE APPROX­IM­ATE AND FOR GUID­ANCE ONLY.
  7. SER­VICES INFORM­A­TION HAS BEEN PROVIDED BY THE CLI­ENT, DATED 23/04/2025.

SITE ADDRESS DUL­NA­HAIT­NACH U2239 ACCESS ROAD FROM CAR­RBRIDGE HIGH­LAND SCOT­LAND PH23 3AY OS NGR: NH 85484 20124

DRAW­ING NOTES

  1. DRAW­ING TO BE READ IN CON­JUNC­TION WITH:
    • PQZ-JBA-00 – 00-DR-C-001-Site_Location_Plan
    • PQZ-JBA-00 – 00-DR-C-002-Site-Clearance
    • PQZ-JBA-00 – 00-DR-C-003-General_Arrangement_1_of_2
    • PQZ-JBA-00 – 00-DR-C-004-General_Arrangement_2_of_2
    • PQZ-JBA-00 – 00-DR-C-005-Channel_Long_Section_1_of_2
    • PQZ-JBA-00 – 00-DR-C-006-Channel_Long_Section_2_of_2
    • PQZ-JBA-00 – 00-DR-C-007-Bridge_Long_Section
    • PQZ-JBA-00 – 00-DR-C-008-Channel-Cross_Sections
    • PQZ-JBA-00 – 00-DR-C-009-Bridge_Cross_Sections
    • PQZ-JBA-00 – 00-DR-C-010-Standard-Details
    • PQZ-JBA-00 – 00-DR-C-011-Step-Pool-Details
    • PQZ-JBA-00 – 00-DR-C-012-Non-Tech­nic­al Over­view Plan
    • PQZ-JBA-00 – 00-DR-S-013-Structural_General_Arrangement
    • PQZ-JBA-00 – 00-DR-S-014-Sections_1_of_2
    • PQZ-JBA-00 – 00-DR-S-015-Sections_2_of_2

LEGEND

  • SITE EXTENT
  • EXIST­ING WATERCOURSE
  • EXIST­ING BRIDGE CROSSING
  • WATER­COURSE FLOW DIRECTION

Doc­u­ment Control | Rev. | Descrip­tion | Date | Author | Design­er | Check­er | Approver | | — -| — -| — -| — -| — -| — -| — -| | P03 | SITE EXTENT REVISED | 29/04/26 | LH | KM | ST | JS | | P02 | FOR REVIEW AND COM­MENT | 31/03/26 | JN | KM | ST | JS | | P01 | FOR REVIEW AND COM­MENT | 06/03/26 | SW | KM | ST | JS |

Pro­ject Title SLU­GAIN BURN RESTORATION

Draw­ing Title SITE LOC­A­TION PLAN

Par­ent Model The High­land Coun­cil Com­hairle na Gàid­healtachd NOT FROM MODEL

Secur­ity Classification FOR PLANNING

Scale 1:2500

Author S. Wood Design­er K. Mularska Check­er S. Thom­son Approver J. Steele

Suit­ab­il­ity Status SHARED FOR REVIEW AND COM­MENTS S3

Revi­sion P03

Inform­a­tion Container A1 Sheet Size PQZ-JBA-00 – 00-DR-C-001-Site_Location_Plan

This map is repro­duced from Ord­nance Sur­vey mater­i­al with the per­mis­sion of Ord­nance Sur­vey on behalf of the Con­trol­ler of His Majesty’s Sta­tion­ery Office Crown copy­right 2026. Unau­thor­ised repro­duc­tion infringes Crown copy­right and may lead to pro­sec­u­tion or civil pro­ceed­ings. Licence No. 100024198

JBA Con­sult­ing Unit 2.1, Quantum Court Research Aven­ue South Heri­ot Watt Research Park Ric­car­ton EDIN­BURGH EH14 4AP T: +44 (0)131 319 2940 E: info@​jbaconsulting.​com www​.jba​con​sult​ing​.com Twit­ter @JBAConsulting


Cairngorms Nation­al Park Author­ity Ugh­dar­ras Pàirc Nàiseanta a’ Mhon­aidh Ruaidh

Item 5 Appendix 1a 09 Octo­ber 2026 Page 3 of 4

GEN­ER­AL NOTES

  1. ALL DIMEN­SIONS ARE IN METRES UNLESS NOTED OTHERWISE.
  2. ALL COORDIN­ATES ARE IN METRES REL­AT­IVE TO ORD­NANCE SUR­VEY NATION­AL GRID.
  3. ALL DIMEN­SIONS MUST BE CHECKED/VERIFIED ON SITE.
  4. ANY DIS­CREP­AN­CIES NOTED ON SITE ARE TO BE REPOR­TED TO THE SUPER­VISOR IMMEDIATELY.
  5. THE ELEC­TRON­IC VER­SION OF THIS DRAW­ING IS NOT TO BE USED FOR SET­TING OUT.
  6. THE LOC­A­TIONS OF ANY KNOWN SER­VICES SHOWN ON DRAW­INGS ARE APPROX­IM­ATE AND FOR GUID­ANCE ONLY.
  7. SER­VICES INFORM­A­TION HAS BEEN PROVIDED BY THE CLI­ENT, DATED 23/04/2025.
  8. PRO­POSED EARTH­WORKS TO BE COVERED WITH 150mm CLASS 5A TOP­SOIL AND DRESSED WITH A BIO­DE­GRAD­ABLE EROSION CON­TROL GEOTEXTILE.

DRAW­ING NOTES

  1. DRAW­ING TO BE READ IN CON­JUNC­TION WITH:
    • PQZ-JBA-00 – 00-DR-C-001-Site Loc­a­tion Plan
    • PQZ-JBA-00 – 00-DR-C-002-Site-Clearance
    • PQZ-JBA-00 – 00-DR-C-003-General_Arrangement_1_of_2
    • PQZ-JBA-00 – 00-DR-C-004-Gen­er­al_Ar­range­ment_2 of 2
    • PQZ-JBA-00 – 00-DR-C-005-Channel_Long_Section_1_of_2
    • PQZ-JBA-00 – 00-DR-C-006-Channel_Long_Section_2_of_2
    • PQZ-JBA-00 – 00-DR-C-007-Bridge_Long_Section
    • PQZ-JBA-00 – 00-DR-C-008-Channel-Cross_Sections
    • PQZ-JBA-00 – 00-DR-C-009-Bridge_Cross_Sections
    • PQZ-JBA-00 – 00-DR-C-010-Standard-Details
    • PQZ-JBA-00 – 00-DR-C-011-Step-Pool-Details
    • PQZ-JBA-00 – 00-DR-C-012-Non-Technical_Overview_Plan
    • PQZ-JBA-00 – 00-DR-S-013-Structural_General_Arrangement
    • PQZ-JBA-00 – 00-DR-S-014-Sections_1_of_2
    • PQZ-JBA-00 – 00-DR-S-015-Sections_2_of_2

Annota­tions on the plan:

  • STEP POOL CHAN­NEL FORM­A­TION TO EXT