Skip to content

Item 5 Appendix1c Plans SlugainBurnRestoration 20260160DET

2 October 2026

Item 5 Appendix1c Plans SlugainBurnRestoration 20260160DET
This document contains detailed engineering plans for the Slugain Burn Restoration project, prepared by JBA Consulting for the Cairngorms National Park Authority and The Highland Council. These plans outline the general structural arrangement for replacing a culvert and realigning a section of road, providing various cross-sections and a long section of the road and bridge. They also include standard construction details and specific designs for restoring the burn’s channel, featuring natural elements like step-pools and riffles, with all dimensions clearly noted.
Please be aware that this summary has been generated using AI.
Tags: