Skip to content

Item 6 Hydro Committee Report 20250300DET

17 April 2026

Item 6 Hydro Committee Report 20250300DET
This document contains a committee report recommending approval for a proposed small-scale hydro-electric scheme and related construction at Land 650 Metres South West Of Dalmunzie Castle Hotel in Spittal Of Glenshee. The scheme aims to generate electricity for the hotel, with any extra energy sold to the national grid. The proposal has been carefully designed to minimise its impact on the local environment and landscape, including areas important for protected wildlife. After a thorough assessment, it was found that potential effects on species like Atlantic salmon, otters, and golden eagles can be successfully managed by putting in place measures such as specific construction timings and pollution control. The project aligns with policies promoting renewable energy and sustainable development, and is recommended for approval with conditions to ensure these protections are met, along with archaeological and public access considerations.
Please be aware that this summary has been generated using AI.
Tags: