Item 7 Appendix 1 Plans 20260095DET ChangeOfHouseTypeNethy
Cairngorms National Park Authority Ughdarras Pàirc Nàiseanta a’ Mhonaidh Ruaidh
Item 7 Appendix 1 24 April 2026 Page 1 of 4
Agenda item 7
Appendix 1
2026/0095/DET
Plans
Tanera Ma Station Cottage Nethy Station STATION ROAD Tigh na Brolaich Station House Rapness Elchies Stables, River Cottage Ness Cottage Nethy House X Tamarisk B970 Mousay BROOMHILL CO
Figured dimensions only to be taken from this drawing. All dimensions are to be checked on site before any work is put in hand. IF IN DOUBT ASK.
CDM: Hazard Bimination & Risk Reduction has been undertaken and recorded where appropriate, in accordance with the requirements. of “The Construction (Design and Management) Regulallons 2015” and the associated ‘Industry Guidance for Designers
NORTH
Rev Description CA Date
COLIN ARMSTRONG ARCHITECTS Lyle House, Fairways Business Park, Inverness IV2 6AA T: 01463 712 288 W: www.colinarmstrong.com TDESIGNER CERTIFIED PASSIVE HOUSE AB
Client AW Laing
Project Housing Development at, Nethy Bridge
Project No. 1690
Drawing No. 002(2)
Revision Location plan
Status Planning
Date Created Feb ‘26
Drawn by Scale 1:1000 @A3
Sheet @A3
copyright 2010. All rights reserved. Licence number 100020449 0 10 20 30 40 50 100m Location plan — 1:1250 SCALE From File: X:\DOCUMENTS\1690-NETHYBRIDGE — ALBYN 05. RESOURCE\5.2 SURVEY LOCATION PLAN NEW PLANNING.DWG
Entrance as detailed within approved schemes (04/0318/CP and 10/380/CP) to be retained
N Scale 1:500
| TYPE | UNITS |
|---|---|
| 2B4P SEMI DETACHED AFFORDABLE | 10No. 2B4P |
| 3B5P SEMI DETACHED AFFORDABLE | 10No. 3B5P |
| 3B5P DETACHED — AFFORDABLE | 1No. 3B5P |
| TOTAL UNITS | 21 Units |
| ADOPTABLE ROAD AREA | = 939 m² |
Plot 2 Plot 1 Plot 4 Plot 3 Plot 12 Plot 11 Plot 10 Plot 9 Plot 17 Remainder of site as per consent (ref-2022/0305/DET Plot 18 Plot 8 Plot 7 Plot 6 Plot 5 Plot 21 Plot 22 Plot 14 Plot 13 Tigh na Brolaich Plot 19 Plot 20 Station House Tanera Mor Station Cottage Nethy Station Rapness Stables Elchies 3.3m difference Plot 15 Plot 16
Figured dimensions only are to be taken from this drawing. All dimensions/are to be checked on site before any work is put in hand. IF IN DOUBT/ASK.
CDM: Hazard Elimination & Risk Reduction has been undertaken and recorded where appropriate, in accordance with the requirements of “The Construction (Design and Management) Regulations 2015” and the associated “Industry Guidance for Designers”
M Rev Description CA Date
COLIN ARMSTRONG ARCHITECTS Lyle House, Fairways Business Park, Inverness IV2 6AA T: 01463 712 288 W: www.colinarmstrong.com DESIGNER CERTIFIED PASSI ASSIDESIGNER
Client AW Laing Ltd
Project Proposed Housing Nethybridge Development
Project No. 1690
Drawing No. Rt14_E_90_104(2)
Revision Site Plan OPTION 14E (22 Units)
Status DRAFT
Date Created Feb ‘26
Drawn by MM
Scale As indicated
Sheet A2
Nethy Hou From file: X:Documents/1690-Nethybridge — Albyn 02. WORK IN PROGRESS 2.1 BIM Models 1690_CAA_RT14_E_NethyBridges alt layouts.rvt Printed on: 20/02/2026 16:42:24
DN DN DN DN UP UP 11.91 TWIN 5.15 BATHROOM 1.56 WDB. 9.01 HALL 5.40 BATHROOM 11.11 BEDROOM 1 4.83 HALL 1744 7.81 SINGLE 1.18 CPD 10.79 DOUBLE 1.57 CBD 1.31 WDB 0.57 WDB 1.08 WDB 0.68 CDP 11.19 BEDROOM 2 1.03 WDB 3178 3009 710 3151 3553 3216 3294 2286 3416 2588 4603 2650 2009 2093 2438 15.03 LIVINGROOM 1.08 DRY 15.50 KITCHEN/DINING 1.16 CBD 3.54 WC. 5.98 HALL 1.50 Utility 16.43 KITCHEN/DINING 16.51 LIVINGROOM 4.26 W.C. 1.60 CBD Space for future shower 3520 6499 6325 3568 4626 4270 2599 5942 5768 2628 3055 FF FF DW WM TD WM TD
Figured dimensions only are to be taken from this drawing. All dimensions are to be checked on site before any work is put in hand. IF IN DOUBT ASK.
CDM: Hazard Elimination & Risk Reduction has been undertaken and recorded where appropriate, in accordance with the requirements of “The Construction (Design and Management) Regulations 2015” and the associated “Industry Guidance for Designers”
From file : X:\Documents\1690 — Nethybridge — Albyn\02. WORK IN PROGRESS\2.1 BIM Models\1690_CAA_BT2_3B5P and 2B4P semi.rvt Printed on : 18/08/2022 14:59:48 B
COLIN ARMSTRONG ARCHITECTS Lyle House, Fairways Business Park, Inverness IV2 6AA T : 01463 712 288 W : www.colinarmstrong.com
Rev Description Date
Project Housing Development Nethybridge Client RW Laing Drawing No. BT2_00_100 Project No. 1690 Revision Scale @ A1 As indicated Sheet Date Created Aug ‘22 Drawn by MM Status Planning
GENERAL ARRANGEMENT 2B3P + 3B5P SEMI-DETACHED HOUSES Scale — 1 : 50
First Floor Plan Scale — 1 : 50
Ground Floor Plan Scale — 1 : 100
Front elevation Scale — 1 : 100
LH side Scale — 1 : 100
Rear elevation Scale — 1 : 100
RH side
2B3P TOTAL FF NIA = 38.9 m² TOTAL GF NIA = 46.13 m² GIFA 85.0sqm
3B5P TOTAL FF NIA = 49.7 m² TOTAL GF NIA = 52.4 m² GIFA 102.1sqm
A Client amends — 2B3P changed to 2B4P, doors, shower space 25.05.22 B Planning updates 18.08.22
MATERIALS Walls
- Rendered blockwork
- Cedral timber effect cladding
Roof
- Slate roofing
Windows/Screens
- Alu-clad timber framed
Fascias/soffits
- Cedral board
Rainwater goods
- uPVC gutters and downpipes
Scale 0 1 2 3m 1:50 Scale 0 2 4 6m 1:100