Item 7 Appendix 1 Plans 20260095DET ChangeOfHouseTypeNethy

Cairngorms Nation­al Park Author­ity Ugh­dar­ras Pàirc Nàiseanta a’ Mhon­aidh Ruaidh

Item 7 Appendix 1 24 April 2026 Page 1 of 4

Agenda item 7

Appendix 1

2026/0095/DET

Plans


Tan­era Ma Sta­tion Cot­tage Nethy Sta­tion STA­TION ROAD Tigh na Bro­laich Sta­tion House Rap­ness Elch­ies Stables, River Cot­tage Ness Cot­tage Nethy House X Tam­ar­isk B970 Mousay BROOM­HILL CO

Figured dimen­sions only to be taken from this draw­ing. All dimen­sions are to be checked on site before any work is put in hand. IF IN DOUBT ASK.

CDM: Haz­ard Bim­in­a­tion & Risk Reduc­tion has been under­taken and recor­ded where appro­pri­ate, in accord­ance with the require­ments. of The Con­struc­tion (Design and Man­age­ment) Reg­u­lal­lons 2015” and the asso­ci­ated Industry Guid­ance for Designers

NORTH

Rev Descrip­tion CA Date

COLIN ARM­STRONG ARCHI­TECTS Lyle House, Fair­ways Busi­ness Park, Inverness IV2 6AA T: 01463 712 288 W: www​.colin​arm​strong​.com TDESIGN­ER CER­TI­FIED PASS­IVE HOUSE AB

Cli­ent AW Laing

Pro­ject Hous­ing Devel­op­ment at, Nethy Bridge

Pro­ject No. 1690

Draw­ing No. 002(2)

Revi­sion Loc­a­tion plan

Status Plan­ning

Date Cre­ated Feb 26

Drawn by Scale 1:1000 @A3

Sheet @A3

copy­right 2010. All rights reserved. Licence num­ber 100020449 0 10 20 30 40 50 100m Loc­a­tion plan — 1:1250 SCALE From File: X:\DOCUMENTS\1690-NETHYBRIDGE — ALBYN 05. RESOURCE\5.2 SUR­VEY LOC­A­TION PLAN NEW PLANNING.DWG


Entrance as detailed with­in approved schemes (04/0318/CP and 10/380/CP) to be retained

N Scale 1:500

TYPEUNITS
2B4P SEMI DETACHED AFFORDABLE10No. 2B4P
3B5P SEMI DETACHED AFFORDABLE10No. 3B5P
3B5P DETACHED — AFFORDABLE1No. 3B5P
TOTAL UNITS21 Units
ADOPT­ABLE ROAD AREA= 939 m²

Plot 2 Plot 1 Plot 4 Plot 3 Plot 12 Plot 11 Plot 10 Plot 9 Plot 17 Remainder of site as per con­sent (ref-2022/0305/­DET Plot 18 Plot 8 Plot 7 Plot 6 Plot 5 Plot 21 Plot 22 Plot 14 Plot 13 Tigh na Bro­laich Plot 19 Plot 20 Sta­tion House Tan­era Mor Sta­tion Cot­tage Nethy Sta­tion Rap­ness Stables Elch­ies 3.3m dif­fer­ence Plot 15 Plot 16

Figured dimen­sions only are to be taken from this draw­ing. All dimensions/​are to be checked on site before any work is put in hand. IF IN DOUBT/ASK.

CDM: Haz­ard Elim­in­a­tion & Risk Reduc­tion has been under­taken and recor­ded where appro­pri­ate, in accord­ance with the require­ments of The Con­struc­tion (Design and Man­age­ment) Reg­u­la­tions 2015” and the asso­ci­ated Industry Guid­ance for Designers”

M Rev Descrip­tion CA Date

COLIN ARM­STRONG ARCHI­TECTS Lyle House, Fair­ways Busi­ness Park, Inverness IV2 6AA T: 01463 712 288 W: www​.colin​arm​strong​.com DESIGN­ER CER­TI­FIED PASSI ASSIDESIGNER

Cli­ent AW Laing Ltd

Pro­ject Pro­posed Hous­ing Nethy­bridge Development

Pro­ject No. 1690

Draw­ing No. Rt14_E_90_104(2)

Revi­sion Site Plan OPTION 14E (22 Units)

Status DRAFT

Date Cre­ated Feb 26

Drawn by MM

Scale As indicated

Sheet A2

Nethy Hou From file: X:Documents/1690-Nethybridge — Albyn 02. WORK IN PRO­GRESS 2.1 BIM Mod­els 1690_​CAA_​RT14_​E_​NethyBridges alt layouts.rvt Prin­ted on: 20/02/2026 16:42:24


DN DN DN DN UP UP 11.91 TWIN 5.15 BATH­ROOM 1.56 WDB. 9.01 HALL 5.40 BATH­ROOM 11.11 BED­ROOM 1 4.83 HALL 1744 7.81 SINGLE 1.18 CPD 10.79 DOUBLE 1.57 CBD 1.31 WDB 0.57 WDB 1.08 WDB 0.68 CDP 11.19 BED­ROOM 2 1.03 WDB 3178 3009 710 3151 3553 3216 3294 2286 3416 2588 4603 2650 2009 2093 2438 15.03 LIV­IN­GROOM 1.08 DRY 15.50 KITCHEN/DINING 1.16 CBD 3.54 WC. 5.98 HALL 1.50 Util­ity 16.43 KITCHEN/DINING 16.51 LIV­IN­GROOM 4.26 W.C. 1.60 CBD Space for future shower 3520 6499 6325 3568 4626 4270 2599 5942 5768 2628 3055 FF FF DW WM TD WM TD

Figured dimen­sions only are to be taken from this draw­ing. All dimen­sions are to be checked on site before any work is put in hand. IF IN DOUBT ASK.

CDM: Haz­ard Elim­in­a­tion & Risk Reduc­tion has been under­taken and recor­ded where appro­pri­ate, in accord­ance with the require­ments of The Con­struc­tion (Design and Man­age­ment) Reg­u­la­tions 2015” and the asso­ci­ated Industry Guid­ance for Designers”

From file : X:\Documents\1690 — Nethy­bridge — Albyn\02. WORK IN PROGRESS\2.1 BIM Models\1690_CAA_BT2_3B5P and 2B4P semi.rvt Prin­ted on : 18/08/2022 14:59:48 B

COLIN ARM­STRONG ARCHI­TECTS Lyle House, Fair­ways Busi­ness Park, Inverness IV2 6AA T : 01463 712 288 W : www​.colin​arm​strong​.com

Rev Descrip­tion Date

Pro­ject Hous­ing Devel­op­ment Nethy­bridge Cli­ent RW Laing Draw­ing No. BT2_00_100 Pro­ject No. 1690 Revi­sion Scale @ A1 As indic­ated Sheet Date Cre­ated Aug 22 Drawn by MM Status Planning

GEN­ER­AL ARRANGE­MENT 2B3P + 3B5P SEMI-DETACHED HOUSES Scale — 1 : 50

First Floor Plan Scale — 1 : 50

Ground Floor Plan Scale — 1 : 100

Front elev­a­tion Scale — 1 : 100

LH side Scale — 1 : 100

Rear elev­a­tion Scale — 1 : 100

RH side

2B3P TOTAL FF NIA = 38.9 m² TOTAL GF NIA = 46.13 m² GIFA 85.0sqm

3B5P TOTAL FF NIA = 49.7 m² TOTAL GF NIA = 52.4 m² GIFA 102.1sqm

A Cli­ent amends — 2B3P changed to 2B4P, doors, shower space 25.05.22 B Plan­ning updates 18.08.22

MATER­I­ALS Walls

  • Rendered block­work
  • Ced­ral tim­ber effect cladding

Roof

  • Slate roof­ing

Windows/​Screens

  • Alu-clad tim­ber framed

Fascias/​soffits

  • Ced­ral board

Rain­wa­ter goods

  • uPVC gut­ters and downpipes

Scale 0 1 2 3m 1:50 Scale 0 2 4 6m 1:100