Item 7 Appendix 1 Plans 20260098DET Distillery Spey Dam Laggan
Cairngorms National Park Authority Ùghdarras Pàirc Nàiseanta a’ Mhonaidh Ruaidh
Item 7 Appendix 1 12 June 2026 Page 1 of 3
Agenda item 7
Appendix 1
2026/0098/DET
Plans
scale in metres 1:2500 [Image: A detailed site plan titled “Site Location Plan 1:2500” and “Site Location Plan 1:1250” showing a river, roads, and various features. The map includes contour lines and is oriented with north at the top. On the right side, there is a title block with project details.] Site Location Plan 1:2500 Site Location Plan 1:1250 scale in metres 1:2500 Dubh 281.9m Drain Well Pond rack n 260.9m 0 ODOODO DO Bruach Mhór St Michael’s Chapel (site of) Burial Ground (disused) River Spey DOODO POOOOD DIST GENERAL WADE’S MILITARY ROAS (TRACKY Dail na Ceardaich 258.5m WA OS/OB 3 May 23 As Noted@A0 Speyside Distillers Dalchully Estate Laggan PH20 1BU olli blair architects 0125.PL.001 Site Location Plans PLANNING volliblair.co.uk olli@olliblair.co.uk +44 (0)7500 601940
[Image: A landscape plan titled “Landscape GA Plan” with a detailed layout of a distillery site, showing proposed and existing features, planting, and infrastructure. A comprehensive legend is included on the right side of the plan, detailing softworks, hardworks, and furniture. Several numbered callouts indicate specific areas or elements on the plan.] Landscape GA Plan Scale 1:1000 Road to Laggan River Spey rivate access road Softworks Legend Refer to planting plan erz/22 36/P06
- Meadow
- Species rich grassland across the site
- Wildflower meadow to entrance roads and spaces
- Shrub/herbaceous planting
- A mix of biodiverse species as a field layer at key spaces
- Hedges
- 1.2m tall hedging
- Wetland planting
- To ditches, swales, basins and wetlands
- Water bodies
- SuDS pond, cooling pond and existing pond
- Existing coniferous plantation retained
- Existing coniferous plantation removed
- Existing Birch riparian woodland retained
- Extends small islands within the Spey
- Proposed woodland planting
- See planting plan for species specification
- Specimen trees
- Semi mature tree planting
- Wider landscape trees
- Semi mature tree planting
- Avenue trees
- Semi mature tree planting
- Existing rock outcrop
Hardworks Legend
- Asphalt roads
- Insitu concrete surfacing
- Resin bound gravel paths and parking
- Self binding gravel wider landscape paths
- Natural stone paving
- To entrance spaces at marketing suite and distillery
- Natural stone sett paving
- To key points along access road and along General Wades Road
- Grasscrete
- To edge of access road and fire access routes
- Steps
- Stone steps on wider landscape path
- Deck
- Suspended steel access deck to marketing suite with balustrade
Boundaries & Furniture Legend
- Natural stone walls to match building
- Entrance wall 1m high
- Wall at office 1.5m high
- Deer Fencing
- 2.0m high stock fence on timber posts
- Double leaf gate
- 1.5m high steel gate, vertical bar. 3.7m wide
- Timber benches
- 3no.
- Cycle stands
- Overhead cables
- See erz 22 36 S03 for further detail
James Morton Street erz Limited www.erzstudio.co.uk T/F: 0141 552 0888 erz All dimensions are to be 18/09/2003 Speyside Distillery Washouse and SuDS
- Bin store: Timber gate to front
- Low stone wall with integrated signage
- Visitor entrance space with drop off bay and visitor grasscrete parking bays set in woodland. Steps down onto lower field path with adjacent terraced cascade
- Path to Spey and field drain/linear wetland:
- Marketing suite: Refer to Architect’s information
- Access bridge over General Wades Road: Refer to Architect’s information
- Distillery: Refer to Architect’s information
- SuDS pond with overflow to wetland to south
- Cooling pond with wetland overflow
- Cooling tower: Refer to Architect’s information
- Power house: Refer to Architect’s information
- Inground fuel tanks with standoff and access path
- Mounding adjacent to cooling pond to assist with visual screening
- Sprinkler tanks: Refer to Engineer’s information
- Pipie bridge: Refer to Engineer’s information
- Warehouses: Refer to Architect’s information
- Tank: Refer to Engineer’s information
- Office: Refer to Architect’s information
- SuDS basin planted with wetland margins
- Swale
- Existing pond/wetland: New check damn at outlet to manage water flow
- 2no. EV Charging bays
- Bike shelter
PLANNING 1:1000 A1 19/09/2023