Item5Appendix1Plans20190121DET
CAIRNGORMS NATIONAL PARK AUTHORITY Planning Committee Agenda Item 5 Appendix I 28/06/2019
AGENDA ITEM 5
APPENDIX I
2019/0121/DET
PLANS
Cairn Path Shielings Allt a’ Chaorainn Prain Path SITE PLAN Scale 1:5,000 @ A1 All Areas Within Applicant Ownership Denotes Site Boundary NGR: NH 71212 01458 Allt na Beinne Turning Area Location (refer to datasheet for material spec) Path (ur) Grouse Butts Grouse Butts Path Ford Allt an t‑Sluichd Bhig 0 Grouse Butts Grouse Butts New Gulvert New Culvert New Culvert Allt na Beinne Allt an t‑Sluichd Bhig Potential Borrow Pit Track To rr Garbh Shielings Existing Borrow Pit An Caisdeal New Culvert T ☑ Central section grass seeded Path (um) Ferd Path (um) Grouse Butts Shielings Hut Circles Ford Ford Path (um) New Culvert Existing Borrow Pit Allt na Loihne Dubh-ghlaic NOTES wing unless Planning purposes. Figured dimensions only are e to be used. All dimensions must be checked on site by the Contractor prior to the commencement of any fabrication building works. Where applicable, dimensions and details to be read conjunction with specialist consultants’ drawings; any disparity between drawings o be brought to the attention of Savills prior to the commencement of any fabrication or building works. This drawing is the property of Savills expressed permission. REVISIONS REV NOTE/ DRAWN BY be reproduced without Culverts, Borrow Pits & Turning Space added DATE 10.06.19 HILL TRACK LOCATION PLAN SITE PLAN Scale 1:20,000 @ A1 Denotes Site Boundary NGR: NH 71212 01458 FIGURE 1: slope Details taken from ‘Constructed Tracks in Upland Areas-2nd Edition June 2013 Scottish NTS PROPOSED RESURFACING OF EXISTING HILL TRACK: The existing hill tracks are for land management and sporting purposes only for management of sheep and deer in areas. Track resurfacing to be of locally won materials with banks and ditches to be turfed in one sitting. i.e. turfs will only be moved once in order to protect heather, surface vegetation and underlying peat. Turf will be skimmed off and used to cover or fill ditches promoting re-growth as well as drainage to keep surface water a minimum. Visual impact will be minimised by following the existing tracks and contours of the land. This will also mitigate poaching and rutting during winter management operations by avoiding steep inclines where practicable. All tracks deviating from the existing track route will be turfed over, thus migrating any informal tracks into one hill track minimising disturbance to peat surfaces and heather cover. The track maintenance programme will be an integral part of the efforts to restore and improve the biodiverse habitat which requires much greater flock management and targeted deer control. Meall Dubh-ghlaic FIGURE 2: Cut tra 1:5,000 SCALE OF METRES 1:20,000 Path (un)) Ford FIGURE 3: Surface track geosynthetic on soft ground FIGURE 4: Floating track on deep peat Junction with existing track network FIGURE iped crossing at a spring or flush FIGURE 6: Shi a slope 2.5m afloating kcrossing Details taken from ‘Constructed Tracks in Upland Areas — 2nd Edition June 2013’ Scottish Natural Heritage SPECIFICATION: Materials to be used in the resurfacing of the track base to be of good quality granular material with less than 15% silt content. Material to be placed and compacted n layers not exceeding 200mm thick Note the degree of compaction depends the moisture content of the material being placed. Road surface finished with 100 to 150mm crushed rock. Approximate proposed track width to be 2.5metres wide. Buildings and land within red boundary are under the same ownership and occupation PROJECT TITLE Existing Track — Retrospective Application Glenbanchor, Strone Road CLIENT Glenbanchor Estate DRAWING TITLE Location & Site Plan SCALE PAPER SIZE Various @A1 DRAWING STATUS Planning DRAWN BY FM CHECKED BY CSW DRAWING NUMBER 430092 PL01 REVISION A DATE Jan 19 Apron Plan Catchpit Plan Figure 7: Cross section showing culvert, silt trap and apron savills RICS 7 The Square Fochabers IV32 7DG t: 01343 823000 01343 82303 fochabers@savills
4 4 B B Existing Track Resurfaced Section SITE PLAN: Proposed resurfacing of existing track section NTS Existing Track Resurfaced Section Junction with existing track network C Existing Track C NOTES Do not scale from this drawing unless for Planning purposes. Figured dimensions only are to be used. All dimensions must be checked on site by the Contractor prior to the commencement of any fabrication or building works. Where applicable, dimensions and details are to be read in conjunction with specialist consultants’ drawings; any disparity between drawings is to be brought to the attention of Savills prior to the commencement of any fabrication or building works. This drawing is the property of Savills and may not be reproduced without their expressed permission. REVISIONS REV NOTE / DRAWN BY DATE N SITE PHOTO: A‑A Photograph of existing ditch PROPOSED RESURFACING OF EXISTING HILL TRACK: The existing hill tracks are for land management and sporting purposes only for management of sheep and deer in areas. Track resurfacing to be of locally won materials with banks and ditches to be turfed in one sitting. i.e. turfs will only be moved once in order to protect heather, surface vegetation and underlying peat. Turf will be skimmed off and used to cover or fill ditches promoting re-growth as well as drainage to keep surface water to a minimum. Visual impact will be minimised by following the existing tracks and contours of the land. This will also mitigate poaching and rutting during winter management operations by avoiding steep inclines where practicable. All tracks deviating from the existing track route will be turfed over, thus migrating any informal tracks into one hill track minimising disturbance to peat surfaces and heather cover. The track maintenance programme will be an integral part of the efforts to restore and improve the biodiverse habitat which requires much greater flock management and targeted deer control. SPECIFICATION: Materials to be used in the resurfacing of the track base to be of good quality granular material with less than 15% silt content. Material to be placed and compacted in layers not exceeding 200mm thick. Note the degree of compaction depends on the moisture content of the material being placed. Road surface finished with 100 to 150mm crushed rock. Approximate proposed track width to be 2.5metres wide. SITE PHOTO: B‑B Photograph from existing track looking south SITE PHOTO: C‑C PROJECT TITLE Existing Track — Retrospective Application Glenbanchor, Strone Road CLIENT Glenbanchor Estate DRAWING TITLE Site Photographs Photograph looking north-west from existing gate SCALE PAPER SIZE DRAWING NUMBER REVISION NTS @A2 430092 PL02 DRAWING STATUS Planning DRAWN BY FM CHECKED BY CSW DATE Jan 19 7 The Square Fochabers Moray IV32 7DG t: 01343 823000 f: 01343 823030 savills RICS e: fochabers@savills.co.uk
Existing track resurfaced section NOTES Do not scale from this drawing unless for Planning purposes. Figured dimensions only are to be used. All dimensions must be checked on site by the Contractor prior to the commencement of any fabrication or building works. Where applicable, dimensions and details are to be read in conjunction with specialist consultants’ drawings; any disparity between drawings is to be brought to the attention of Savills prior to the commencement of any fabrication or building works. This drawing is the property of Savills and may not be reproduced without their expressed permission. REVISIONS REV NOTE / DRAWN BY DATE N PROJECT TITLE Existing Track — Retrospective Application Glenbanchor, Strone Road CLIENT Glenbanchor Estate DRAWING TITLE Track Route SCALE NTS PAPER SIZE @A2 DRAWING STATUS DRAWING NUMBER REVISION 430092 PL03 AERIAL PHOTO: Looking North NTS Junction with existing track Planning DRAWN BY FM CHECKED BY CSW DATE Jan 19 7 The Square Fochabers Moray IV32 7DG t: 01343 823000 f: 01343 823030 savills RICS e: fochabers@savills.co.uk