Skip to content

Item8Appendix2CloicheWindFarm20200121PAC

25 September 2020 Part of: Planning Committee - September 2020

Item8Appendix2CloicheWindFarm20200121PAC
This document contains information related to Agenda Item 8, Appendix II, concerning the Cloiche Wind Farm. The document, dated 25 September 2020, includes a map (Figure 7.8.3) showing the wind farm's location within the Cairngorms National Park. The map details the proposed turbine locations, operational or under-construction turbines, consented turbines, study areas of 20km and 40km radii, and a 5km distance radii. It also indicates the zone of theoretical visibility for the wind farm and cumulative baseline sites, alongside the Cairngorms National Park boundary.
Please be aware that this summary has been generated using AI.
×

We want your feedback

Thank you for visiting our new website. We'd appreciate any feedback using our quick feedback form. Your thoughts make a big difference.

Thank you!